http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
오늘 본 자료
마그네시아 인산염 시멘트를 사용한 초속경 보수모르타르의 기초적 특성분석에 관한 연구
강인석,안무영,백민수,임남기,문장수,정상진 대한건축학회 2007 大韓建築學會論文集 : 構造系 Vol.23 No.8
Building structures are generally large in size and have a long life, and the construction of such structures requires the investment of a huge amount of money and social infrastructure. Furthermore, building structures are closely related to people's life.Recently, however, the rapid development of society has been worsening air pollution, which is in turn accelerating the degradation of building structures. Thus, the safety of building structure is emerging as a critical issue.To cope with this problem, the government enacted "The Special Act on Safety Control for Infrastructure” but we need engineers' higher concern over the maintenance and reinforcement of existing structures. Recently researches are being made actively on repair mortar using ultra rapid hardening cement for recovering the performance of structures.The present study conducted an experiment on the basic physical properties of ultra rapid hardening mortar for repairing and reinforcing building structures using magnesia cement and mono-ammonium phosphate. In the experiment, we changed the water-cement ratio and carried out replacement at different ratio of MAP/MgO(%). We used retarder to have working life, and made comparative analysis through evaluating working life and fluidity and measuring strength by age.
주제분류코드에 의한 국내외 건설사업관리(CM) 기술 분야별 연구 현황분석
강인석,박호병,김민지,문현석,Kang, Leen-Seok,Park, Ho-Byung,Kim, Min-Ji,Moon, Hyoun-Seok 한국건설관리학회 2010 한국건설관리학회 논문집 Vol.11 No.1
건설사업관리(Construction Management, CM)제도의 적용확대와 함께 관련 학계 및 연구계에서도 CM의 세부분야별로 활발한 연구들을 진행하고 있으며, 다양한 연구 성과물들이 양산되고 있다. 지속적인 CM연구의 활성화를 위해서는 최근 국내외 연구 주제들의 동향을 파악하는 것이 중요하며, 이로써 국내외의 취약 연구 분야와 관련 기술을 유추할 수 있다. 본 연구는 CM의 주요 기술 분야별 주제분류 코드체계를 구성하여 각 주제별로 최근 5년간 2,000여편의 국내외 관련 논문을 대상으로 세부 분야별 연구동향을 분석하고 있다. 분석결과 국내외 CM연구 분야별 강점 및 취약분야와 최근의 연도별 연구동향 추이를 파악할 수 있었으며, 이를 바탕으로 CM분야의 연구 활성화를 위한 추진방향을 제시하고 있다. Recently, the application of construction management system is being increased and various research activities by each specific field are going on many universities and research institutes. It is necessary to understand the latest research trends by each subject for keeping up excellent products in CM field. This study suggests a subject breakdown structure for classifying detailed technologies of CM field. And over 2,000 domestic and international papers in the last five years are analyzed for analogizing research trends by each subject. The analyzed results include research trends by year and strong and weak fields by each research subject of CM technology. Finally, this study suggests an improved countermeasure for guaranteeing sustainable research activation in CM field.
강인석,김창학,손창백,박홍태,Kang In-Seok,Kim Chang-Hak,Son Chang-Baek,Park Hong-Tae 한국건설관리학회 2001 한국건설관리학회 논문집 Vol.2 No.2
본 연구에서는 프로젝트의 성공적 이행을 보장하기 위하여 리스크분석모델을 제안하였다. 리스크분석 모델은 CRAS라 칭하였으며, 시공자가 RBS를 통해서 리스크를 체계적으로 확인하고 분석하고 관리하는데 도움을 줄 수 있도록 설계되었다. 제안된 CRAS모델은 크게 3단계의 분석과정으로 이루어진다. 첫 단계는 시공자가 프로젝트와 관련된 리스크를 확인하고 분석해서 입찰여부를 판단하는 것이다. 두 번째 단계는 영향도, 의사결정나무, Monte Carlo 시뮬레이션을 이용하여 리스크를 정량적으로 평가하여 예비비를 산정하는 것이며, 세 번째 단계는 확률 노드, 확률 칼렌다 등의 일정관리기법과 시뮬레이션을 통해 공사일정상의 리스크를 파악하여 프로젝트의 성공여부를 판단하는 것이다. 결과적으로 본 모델은 시공자로 하여금 프로젝트에 내재된 리스크가 프로젝트의 공기와 공사비에 미치는 영향을 정량적으로 평가할 수 있도록 함으로서 시공자가 이들 리스크를 제거하는데 필요한 여러 대안을 고려할 수 있도록 하였다. This research proposes a new risk analysis model in order to guarantee successful performance of construction projects. The risk analysis model, called Construction Risk Analysis System(CRAS), is introduced to help contractors Identify project risks through RBS and through the procedures in risk analysis model. The proposed CRAS model consists of three phases. First step, CRAS model can help contractors decide whether or not they bid for a project by analysing risks involved in the project. Second step, the influence diagraming, decision tree and Monte Carlo simulation are used as tools to analyze and evaluate project risks quantitatively. Third step, Monte Carlo simulation is used to assess risk for groups of activities with probabilistic branching and calendars. Consequently, it will help contractors identify risk elements in their projects and quantify the impact of risk on project time and cost.