CWS(Continuous Wall System) II 공법의 개발 및 적응에 관한 연구
임인식,이정배,최선영,이재호,우성우,Lim, In-Sig,Lee, Jeong-Bae,Choi, Sun-Young,Lee, Jai-Ho,Woo, Sung-Woo 한국건축시공학회 2009 한국건축시공학회지 Vol.9 No.1
CWS I method developed to overcome the problems of frequent occurrence in the application of existing downward construction methods has demonstrated excellent efficiency. However, in the case of using slurry wall instead of SCW or CIP as a retaining wall, the improvements in connecting steel beams with the wall were demanded. Therefore, the study of CWS II method was carried out in order to accomplish the CWS I method reflecting its strong points and to ensure the settlement of a steel beam and to induce the diaphragm effect of a slab while reducing the degree of difficulty and the term of works and the cost of construction. In this paper, the concept and features of CWS II method as well as the progress of execution was discussed by comparing with existing methods.
CWS(Continuous Wall System)Ⅱ 공법의 개발 및 적용에 관한 연구
임인식,이정배,최선영,이재호,우성우 한국건축시공학회 2009 한국건축시공학회지 Vol.9 No.1
CWSⅠmethod developed to overcome the problems of frequent occurrence in the application of existing downward construction methods has demonstrated excellent efficiency. However, in the case of using slurry wall instead of SCW or CIP as a retaining wall, the improvements in connecting steel beams with the wall were demanded. Therefore, the study of CWSⅡ method was carried out in order to accomplish the CWSⅠmethod reflecting its strong points and to ensure the settlement of a steel beam and to induce the diaphragm effect of a slab while reducing the degree of difficulty and the term of works and the cost of construction. In this paper, the concept and features of CWSⅡ method as well as the progress of execution was discussed by comparing with existing methods CWSⅠmethod developed to overcome the problems of frequent occurrence in the application of existing downward construction methods has demonstrated excellent efficiency. However, in the case of using slurry wall instead of SCW or CIP as a retaining wall, the improvements in connecting steel beams with the wall were demanded. Therefore, the study of CWSⅡ method was carried out in order to accomplish the CWSⅠmethod reflecting its strong points and to ensure the settlement of a steel beam and to induce the diaphragm effect of a slab while reducing the degree of difficulty and the term of works and the cost of construction. In this paper, the concept and features of CWSⅡ method as well as the progress of execution was discussed by comparing with existing methods