http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
이광길,최승주 한국안전학회 2011 한국안전학회지 Vol.26 No.4
This paper is to investigate noise source for reciprocating type air compressors. The reciprocating type air compressors are widely used in the small and medium sized enterprise and many employees are affected and irritated by their noise during working. The investigation and analysis of the noise source were made according to the ISO 1680/1 and MIL-STD 7410-1 and noise evaluation of each part of compressors was made. Noise emitted from the intake and exhaust valve and the air receiver tank were dominant compared with those from other parts of compressor. Noise from the motor and the revolution of crank mechanism was negligible relatively with the noise sources as mentioned above.
이광길,김우곤,엄석호,강철민,강정기,오철석,서주식,김경재,박종인,장몽룡,김무성,김대년,정수호 대한안전경영과학회 2020 대한안전경영과학회지 Vol.22 No.3
The desulfurizers facility is cylindrical shape. To operate properly it needs nozzles cleaned, get rid of lime adhesion and sludge, repair the wear and corrosion of facility regularly. For this purpose, workers shall access the ceiling or vertical wall at high place. Ordinary scaffoldings such as steel pipe scaffolding or system scaffolding have been using so that workers can access them. With these ordinary scaffoldings, openings around cylindrical wall are inevitable which make workers can expose always to the risk of falling. The purpose of this study is to develop customized scaffolding to minimize the openings to prevent workers form falling during maintenance it. It consists of a hexagonal central tower and six trapezoidal outer towers. And the bracing among the towers have connected each other for self-standing and for maintaining the structure of towers. Span decks, the circumference footstools, steps, etc. are laid on each floor. The safety is reviewed by structural analysis and performance test. With this study, openings each floor of this scaffold are removed. The gap between the cylindrical wall and the edge of the work stage is approximately 100 mm. Therefore, we expect that workers can work safely and efficiently.