http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
후천성 면역 결핍증 환자에서 뇌졸중으로 발생한 신경매독 1예
서재현 ( Jae Hyun Seo ),이상록 ( Sang Rok Lee ),김세영 ( Se Young Kim ),이준섭 ( Joune Seup Lee ),이경은 ( Kyoung Eun Lee ),이해림 ( Hae Lim Lee ),이연수 ( Yeon Su Lee ) 대한내과학회 2013 대한내과학회지 Vol.84 No.6
While the neurologic manifestations of syphilis are diverse, stroke is a rare initial manifestation. We report a human immunodeficiency virus (HIV)-positive patient whose neurosyphilis presented as a stroke. A 42-year-old male visited the emergency room due to decreased mental functioning. Brain magnetic resonance imaging showed acute infarct on the left frontal, temporal, and parietal lobes. A serum Venereal Disease Research Laboratory (VDRL) test was positive. ELISA for HIV antibody and Western blot assays revealed he was infected with HIV. The cerebrospinal fluid (CSF) VDRL test was positive and protein was increased. The patient was treated with heparization and penicillin G for 14 days. His mental status improved with treatment, and CSF protein and VDRL titers were also decreased 3 months after treatment. (Korean J Med 2013;84:864-867)
EuroSID-1에서 EuroSID-2로의 인체모형 변경이 KNCAP 측면충돌안전성 평가에 미치는 영향 연구
임재문,정근섭,Lim, Jae-Moon,Jung, Geun-Seup 한국자동차공학회 2007 한국 자동차공학회논문집 Vol.15 No.5
In order to provide consumers with safety informations of vehicles according to the Korean New Car Assessment Program(KNCAP), the evaluation results and the star ratings of 21 vehicles for the side impact tests have been reported since 2003. Now, the KNCAP considers changing the side impact dummy from EuroSID-1 to EuroSID-2 near future. The rib deflection of EuroSID-2 is 20-30% higher than that of EuroSID-1 because of the removal of "Flat Tops" effect. In this study, the effect of changing the side impact dummy from EuroSID-1 to EuroSID-2 in the KNCAP side impact evaluation is estimated through the previous KNCAP evaluation results. The results show that the decrease of the star ratings would be one star($\bigstar$) approximately.
PET/CT로 혈전증과 감별된 원발성 폐동맥 육종 1례
임상수 ( Sang Soo Lim ),홍구현 ( Koo Hyun Hong ),신재민 ( Jae Min Shin ),김윤섭 ( Youn Seup Kim ),지영구 ( Young Koo Jee ),명나혜 ( Na Hye Myoung ),박석건 ( Seok Gun Park ),박재석 ( Jae Seuk Park ) 대한결핵 및 호흡기학회 2007 Tuberculosis and Respiratory Diseases Vol.62 No.3
Primary pulmonary artery sarcoma is a rare malignant tumor arising from the pulmonary artery. Diagnosis of primary pulmonary artery sarcoma is quite difficult and the conditon is often misdiagnosed as a more common disease, such as a pulmonary embolism. PET can help in diagnosing a pulmonary artery sarcoma due to the increased uptake of 18F-FDG in the area of the tumor. However, the poor anatomic resolution of PET has limited its clinical applications in pulmonary vascular disease. The recently developed PET/CT is the fusion of PET and CT that improves the anatomical resolution of PET. We report a case of a primary pulmonary artery sarcoma mimicking a pulmonary embolism that was diagnosed with PET/CT and confirmed with a surgical resection. (Tuberc Respir Dis 2007; 62: 232-236)
유도무기체계 품질 및 신뢰성 제고를 위한 개발단계 국방규격화 프로세스 개선 방안
조유습,김장은,윤재형,김시옥,이수림,Cho, Yu-Seup,Kim, Jang-Eun,Yoon, Jae-Hyoung,Kim, Si-Ok,Lee, Su-Lim 한국항공운항학회 2017 한국항공운항학회지 Vol.25 No.3
To achieve designed quality and reliability from R&D to force integration, an establishment of precise and distinct specifications and standards are required. However, the recent process of R&D standardization on defense acquisition system, has brought plenty of corrections on specifications and standards that may cause not only difficulties to production line and retardation to the military forces, but also a degradation of provided weapon systems. Therefore, a technical review should be performed by the developer, the producer, and the client, establishing the standard that include mass production requirements as well as clients' requirements. This paper propose a specified solution on process of R&D standardization, by applying a substantial FCA(Functional Configuration Audit) and PCA(Physical Configuration Audit) which implies participation of related agencies. By the improved PCA, 2,023 corrections on 74 types of QAR(Quality Assurance Requirement)s and 12,715 corrections on drawings are identified.