RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI등재

        선로전환기용 유동방지간 설치 최소화에 관한 연구

        박철홍,이남형,김성규,이수환,윤한훈,오우식,이민규 한국도시철도학회 2019 한국도시철도학회논문집 Vol.7 No.2

        A point machine is a device that switches tracks so that locomotive engineers can travel to the course they want to progress. The railway has a high incidence of accidents at turnouts. To prevent the accidents, movement prevention rods are installed on point machines in Korea. However we need to verify whether movement prevention rods are installed because the track environments are more improved compared to the past. In this paper, we performed the displacement measurement test to check movement of point machines and rails, and then verified whether movement prevention rods are installed. 선로전환기는 열차가 진행하고자 하는 진로로 운행할 수 있도록 선로를 전환시키는 설비이다. 분기 구간은 열차를 운행하는데 있어 사고 발생률이 높은 편이다. 따라서 국내에서는 이러한 사고를 예방하기 위해 #12번 분기기 미만 선로전환기에 유동방지간을 설치하고 있다. 하지만 과거에 비해 선로환경이 향상됨에 따라 선로전환기용 유동방지간의 설치 필요성 여부에 대한 검토가 요구되었다. 본 논문에서는 선로전환기 및 레일의 유동 여부를 확인하기 위한 변위계측시험을 수행하였고, 이를 통해 선로전환기용 유동방지간의 설치 필요성 여부를 검증하였다.

      • 철도전기설비 전문시방서 제정

        양인동(In-Dong Yang),윤한훈(Han-Hun Yoon),김동철(Dong-Cheol Kim),조성희(Sung-Hee Cho),최종관(Jong-Kwan Choi),허상영(Sang-Young Heo),신재범(Jae-Bum Shin) 대한전기학회 2011 대한전기학회 학술대회 논문집 Vol.2011 No.4-1

        To grow into global partner who guide "Rail Network" realization and eco-friendly green growth that make the safe and convenient world, Korea Rail Network Authority(KR) have improved railroad technique intellectually. Specially parts of roadbed, rail and architecture have contributed in railroad technology business elevation by setting standard reunified special specifications of construction. However, there was a little inconvenient point because the special specifications are not established in occasion of electrical part but collect of opinion of connection engine hereupon and establishes railroad construction electricity field full text specifications to industrial complex itself December, 2010 via examination and technology consideration of industrial complex inside business committee who is consisted of electricity technical expert and was published. Therefore, we wish to help comprehension for special specifications of railroad by other explains contents that arrange special specifications present condition and special specifications for electric part enactment present condition, and is collected in special specifications.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼