Study on Large Diameter Steel-cased Piles Socketed in Weathered and Fresh Rocks
남문석,이민희,최용규,Nam Moon-Seok,Lee Min-Hee,Choi Yong-Kyu Korean Geotechnical Society 2006 한국지반공학회논문집 Vol.22 No.3
Two large diameter steel cased piles (TS-1 and TS-2) were installed and load-tested with the maximum load of 2000 ton at Kwang-An grand bridge. One of the test piles (TS-1) was socketed into the fresh rock and the other test pile (TS-2) was socketed into the weathered rock. Most loads were carried by the weathered rock layer at the maximum applied load for the test piles. In addition, numerical studies were performed using PENTAGON 3D and ROCKET. Based on this study, the weathered rock layer provided sufficient side resistances and possibility of an alternative embedded layer if weathered rocks are deeply layered over fresh rock, which caused difficulties and cost in construction.
남문석 ( Nam Moon S ) 한국구조물진단유지관리공학회 2022 한국구조물진단유지관리공학회 학술발표대회 논문집 Vol.26 No.1
교량과 인접한 성토부와 하부지반의 침하로 상부구조와 교대한 협착한 교량 주변지반을 보강한 이후에 추가적인 교대 수평변위와 함께 재협착이 발생하였다. 이러한 추가 협착에 대한 원인분석 결과, 지반보강에 따른 지반교란과 함께 상재하중이 추가적으로 가해져 발생한 것으로 파악되었다. 이러한 추가적인 협착을 해결하기 위한 조치방안으로 보강 전후의 교대 수평 변위를 면밀히 분석하여 추가적인 지반보강 대신에 신축유간을 확보하는 방안을 제시하였다.
대구경 현장타설말뚝의 대용량 양방향 말뚝재하시험 분석 및 극한지지력 추정을 위한 수치해석 연구
남문석(Nam, Moonsuk),김상일(Kim, Sangil),홍석우(Hong, Seokwoo),황성춘(Hwang, Seongchun),최용규(Choi, Yongkyu) 한국지반환경공학회 2011 한국지반환경공학회논문집 Vol.12 No.10
초고층 건축물 기초의 고용량 하중 지지능력을 확인할 수 있는 가장 현실적인 방안인 고유압방식의 고용량 양방향 말뚝재하시험을 2개 현장에서 실시하였다. 고유압 복동식 양방향 말뚝재하시험은 정재하시험 시 재하용량 한계와 현장조건의 제약을 극복할 수 있는 가장 현실적인 방안으로 볼 수 있었으며 고용량이 필요한 시험말뚝에 대한 재하시험에 매우 유용한 시험방법으로 판단되었다. 2개의 사례에서 계산된 설계하중 충족비는 각각 3.3, 2.1이었으므로 사례(P-2)에서 1방향 재하하중을 다소 작게 재하하였더라면 말뚝기초의 안정성을 실증적으로 확인하지 못하였을 것으로 판단되었다. 초고용량의 양방향 말뚝재하시험에서 설정한 최대하중까지 재하하더라도 말뚝 및 지반의 극한상태를 확인하는 것은 쉽지 않았으므로 대구경 현장타설말뚝의 극한지지력을 추정하기 위하여 2개의 고용량 대구경 현장타설말뚝에 대한 수치해석을 실시하였다. The high capacity bi-directional pile load test is an optimum pile load test method for high-rised buildings. Especially, a high pressure and double-acting bi-directional pile load testing, a special type of the high capacity bi-directional pile load test, is the most practical way to overcome limitations of loading capacities and constraints of field conditions, which was judged to be a very useful test method for requiring high loading capacities. Total of 2 high capacity bi-directional pile load tests(P-1 and P-2) were conducted in high-rised building sites in Korea. Based on the field load test results, the sufficiency ratio of loading capacities to design loads for P-1 and P-2 were 3.3 and 2.1, respectively. For P-2, the load test could not verify the design load if 1-directional loads applied slightly smaller than the actual applied load. Also, high capacity bi-directional pile load tests were difficult to determine an ultimate state of ground or piles, although the loads were applied until their maximum loads. Hence, finite element analyses were conducted to determine their ultimate states by calibrating and extrapolate with test results.
남문석(Moon Suk Nam),정준표(Jun Pyo Chung),이홍우(Hong Woo Lee),오제열(Je Yol Oh),박효진(Hyo Jin Pack),이관식(Kwan Sik Lee),이상인(Sang In Lee),박인서(In Suh Park),이안나(An Na Lee),송경순(Kyung Soon Song) 대한소화기학회 1994 대한소화기학회지 Vol.26 No.2
Behcets disease is a systemic disease involving skin, joint, gastrointestinal tract, vascular and nervous systems, characterized by recurrent oral and genital ulcerations and ocular in- flammation. The intestinal Behcets disease has nonspecific abdominal symptoms of colicky pain, constipation, diarrhea, nausea, vomiting, and malabsorption. Therefore, we need to dif- ferentiate with other diseases having nonspecific abdominal symptoms. We have experienced a case of lead intoxication after ingestion of herbal pills believed to contain lead compounds. A 40 year-old female with known Behcet's disaese was admitted due to acute colicky abdominal pain. The cause of abdominal pain and anemia was investigated and intestinal Behcets disease was ruled out. The diagnosis of lead intoxication was made by careful history, clinical manifestations, and various laboratory findings including peripheral blood smear, bone marrow aspiration and biopsy, serum lead and free erythrocyte protoporphyrin levels. W e also used lead mobilization test for measure of chelatable lead level. The treatment was performed with 4 courses of EDTA infusion therapy and the clinical symptoms and chemical data associated with lead intoxication improved.(Korean J Gastroen- terol 1994; 26: 399 404)
남문석 ( Nam Moon S. ) 한국구조물진단유지관리공학회 2022 한국구조물진단유지관리공학회 학술발표대회 논문집 Vol.26 No.1
교량과 인접한 성토부와 하부지반의 침하로 상부구조와 교대한 협착한 교량 주변지반을 보강한 이후에 추가적인 교대 수평변위와 함께 재협착이 발생하였다. 이러한 추가 협착에 대한 원인분석 결과, 지반보강에 따른 지반교란과 함께 상재하중이 추가적으로 가해져 발생한 것으로 파악되었다. 이러한 추가적인 협착을 해결하기 위한 조치방안으로 보강 전후의 교대 수평변위를 면밀히 분석하여 추가적인 지반보강 대신에 신축유간을 확보하는 방안을 제시하였다.