RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제
      • 좁혀본 항목 보기순서

        • 원문유무
        • 음성지원유무
        • 원문제공처
          펼치기
        • 등재정보
          펼치기
        • 학술지명
          펼치기
        • 주제분류
          펼치기
        • 발행연도
          펼치기
        • 작성언어
        • 저자
          펼치기

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI등재

        중국 하남지역 선사시대 토성 축성기술 연구

        김봉근 한국고대학회 2023 先史와 古代 Vol.- No.72

        The article examined the construction techniques of prehistoric earthen ramparts in the Hanam(河南) region of China. From the Neolithic period, China employed various techniques such as the earth-and-branch method, reduction technique, earthwork, earthen rampart, wooden planks, and wooden posts to build city walls. Additionally, based on the characteristics of the soil and evidence of construction within the city walls, three construction types were identified: Type A, which involves constructing panel structures; Type B, which repeats the process of building sections through soil layering, cutting, and adding; and Type C, which involves building walls by adding to protruding natural terrain or earthen features. As a result, both cases of using a single construction type for the entire city wall and combining different construction techniques for foundation, central core, inner, and outer layers were observed. This diversity in construction techniques reflects the pinnacle of contemporary scientific and civil engineering technology of the time. Furthermore, through the examination of the construction techniques of prehistoric earthen ramparts in the Hanam region of China, the article proposed a classification of construction techniques that had been ambiguously used in China. Drawing from the basic concept of compaction, these techniques can be categorized into "hangchuk(夯築)" and "toechuk(堆築)" based on their approach to compaction. Hangchuk involves constructing city walls using materials like stones or wooden posts. Depending on the presence of panel structures, hangchuk can be further classified into rammed earth (Type A) and direct compaction (Type B). Notably, direct compaction involves building city walls without panel structures and likely utilized the reduction technique to carve out less stable areas to enhance stability and robustness. On the other hand, toechuk (Type C) uses a wooden planks making it difficult to detect or clearly understand compaction traces. This method often involves utilizing natural terrain or earthen materials to create sloping compactions. In Korea, continuous research and comparison with Chinese archaeological data have been carried out to understand ancient construction techniques. However, difficulties have arisen due to terminology and conceptual challenges when interpreting ancient Chinese construction techniques. Overcoming these challenges and fostering ongoing interest and research in ancient Chinese earthen ramparts are essential for gaining insights into ancient Korean earthen ramparts construction techniques. It is hoped that this article will contribute to the understanding of ancient Korean earthwork construction methods. 본고에서는 중국 하남지역의 선사시대 토성유적의 축성기술을 살펴보았다. 중국은 신석기시대부터 부엽공법과 삭감(削減)기술, 토제(土堤), 토괴(土塊), 목판과 목주를 사용한 판축 등 다양한 기술을 통해 성벽을 축조하였음을 알 수 있었다. 또한 토층의 양상과 성벽 내에서 확인되는 축성 관련 흔적에 따라 판축구조물을 통해 축조하는 A형, 축조 구간 성토 → 커트 → 덧붙이기 과정을 반복하여 축조하는 B형, 돌출된 자연 지형이나 토제에 덧붙여 성벽을 축조하는 C형으로 구분하였다. 그 결과, 성벽 전체가 단일 축성기술로 축조되는 경우와 기저부와 중심토루, 내‧외피토루를 서로 다른 축성기술로 축조하는 경우도 확인된다. 이러한 축성기술의 다양화는 당대 최첨단 과학기술과 토목기술을 통해 이루어낸 결정체임을 반영하고 있다. 한편, 중국 하남지역의 선사시대 토성의 축성기술을 통해 그동안 중국에서 불명확하게 사용되었던 축성기술의 분류안을 제시해 보았다. 먼저 다짐이라는 축성의 기본 개념에 착안하여 다짐 방식을 기준으로 ‘항축(夯築)’과 ‘퇴축(堆築)’으로 분류할 수 있다. 항축은 강돌이나 나무막대 등을 사용한 다짐 방식인 항타로 성벽을 축조한다. 항축은 다시 성토 방식에 따라 판축구조물의 유무에 따라 판축(A형)과 직항(B형)으로 세분된다. 특히, 직항은 판축구조물 없이 성벽을 축조하는데, 성벽의 안정성과 견고성을 확보하기 위해 다짐 강도가 떨어지는 부분을 깎아내는 삭감기술이 사용되었을 것으로 판단된다. 반면, 퇴축(C형)은 박타라는 다짐 방식을 사용하였기 때문에 다짐 흔적이 확인되지 않거나 명확하지 않고, 자연 지형이나 토제를 활용하여 경사방향으로 성토하는 방식을 보인다. 국내에서는 고대 축성기술을 이해하기 위해 중국고고학 자료와의 비교‧연구가 지속적으로 이루어져 왔다. 그러나 용어나 개념상의 문제 등으로 고대 중국의 축성기술을 이해하는데 어려움이 많았다. 이러한 상황을 극복하고, 향후 고대 한국의 토성 축성기술을 다각도에서 이해하기 위해 고대 중국의 토성에 대한 지속적인 관심과 연구가 이루어지길 기대하며, 본고가 고대 한국의 토성 축성기술을 이해하는데 도움이 되길 바란다.

      • Perception Based Definition of Construction Quality in Pakistan

        Awan, Muhammad Yousaf Sadiq,Awan, Dr Muhammad Maqbool Sadiq Korea Institute of Construction Engineering and Ma 2015 Journal of construction engineering and project ma Vol.5 No.2

        The complexity arises in defining the construction quality due to its perception, based on inherent market conditions and their requirements, the diversified stakeholders itself and their desired output. A quantitative survey based approach was adopted in this constructive study. A questionnaire based survey was conducted, for the assessment of construction quality perception and expectations in the context of quality improvement technique. The survey feedback of professionals, from the leading construction organizations/companies of Pakistan were analyzed. The financial capacity, organizational structure, and construction experience of the construction firms formed basis for their selection. After statistical analysis of survey feedback it was found reliable and valid for the inferential purpose to the target population of construction professionals. The quality perception was found to be project scope oriented, considered as an excess cost for a construction project and keeping the rework minimum by qualifying the required quality tests, keeping the defects minimum by ensuring the specifications of supplied material. Any quality improvement technique was expected to address the financial aspects of the construction project for the employer and contractor, by increasing the profitability through reduction in overall cost, reduction in time, reduction in defects and improving the productivity in a construction project. The study is beneficial for the construction professionals to assess the prevailing construction quality perception and the expectations from implementation of any quality improvement technique in construction projects.

      • KCI등재

        첨성대 축조 규준방식과 드잡이기술에 대한 기술사적 접근 연구

        김덕문 국립문화재연구원 2012 헤리티지:역사와 과학 Vol.45 No.4

        The Cheomsungdae was built in the Silla dynasty during the reign of queen Seondeok. It has a round cylindrical structure with a flowing curved fa ade. The identity of the Cheomsungdae has not been revealed since there is not much historical evidence or documents about the building. This study is trying to investigate the building technique and method from the technical point of view of the past when it was constructed. There have been much work and studies done for the Cheomsungdae, but not much were focusing on the technical aspects of the building. In addition there are many questions and doubts about the hypothesis of the building technique of Cheomsungdae since there aren't any remaining documents or historical evidence supporting it. Among many questions, we think that the discussion on falsework technique is not considering traditional construction method of the Dujabee (a traditional construction technique using various tools and equipment for the stability of the building) technique. Therefore, it is hard to identify them as reliable historical facts. As the result of the study, we want to provide the basic data on the construction techniques of Korean traditional architecture and broaden the study scope of technical history by narrowing the errors. The study could be summarized into three points. 1. The historical architecture Cheomseongdae was constructed by using traditional crane techniques such as a Noklo (pulley ladder). Cheomseongdae was re-evaluated as a high level technology for the history of architecture. 2. The benchmark method on Cheomseongdae construction has been applied with a precise scientific method based on the geometrical principals using the central axis. 3. In terms of the history of Korean traditional architecture technology, as there aren't many studies done we proposed various basic data for the traditional crane techniques and criteria of Korean traditional architecture technology. We could expect various and active studies for the technical approach of the history of architecture. 본 연구는 고건축 기술사적 관점에서 첨성대 축조당시 가설공법을 규명하고자 하였다. 독특한 구조와 형태로 이루어진 첨성 대는 그동안 많은 관심을 끌며 연구되어왔으나 고건축 기술사적 측면에서 접근한 사례를 보기 어렵다. 더욱이 첨성대 축조기 술에 관한 연구는 고건축 기술사적 고찰기반이 취약한 추론으로 전개되어 있으므로 많은 의문점을 남기고 있다. 여러 가지 의 문점 가운데 가설공법에 대한 논의는 고건축시공 규준방식과 드잡이에 관한 기술사적(技術史的) 고찰을 결여한 추론으로 전개 되어 있으므로 신빙성 있는 역사적 사실규명으로 보기 어렵게 한다. 연구결과 첨성대축조 가설공법에 대한 규명은 실제유구가 남아있지 않아 직접 고찰에 한계가 있었으나, 그간의 오류 폭을 좁히고 기초자료 제공에 의한 기술사(技術史) 연구 활성화를 기대할 수 있게 되었다. 주요 연구결과는 세 가지로 정리되었다. 1. 원통형 구조로 이루어진 첨성대축조 규준방식은 또한 十자먹 규구법과 다림추를 이용한 준승방식에 기초한 중심축 규준 을 적용하였음으로 고찰되었다. 2. 첨성대 축석공사는 규구준승에 기초한 규준방식과 부합하는 드잡이공사 방법으로 녹로사용 가능성이 고찰 검토되었다. 3. 첨성대축조 규준과 드잡이기술에 대한 고찰 결과 규구준승에 의한 규준방식과 녹로( )를 이용한 드잡이공사는 축석 공사에 별도로 운반을 위한 비계가설을 요하지 않는 고건축 시공기술로 고찰되었다.

      • KCI우수등재

        심리학 연구에서 개인구성심리학 연구법의 적용: 레퍼토리 그리드 기법을 중심으로

        김소희,유금란 한국심리학회 2018 한국심리학회지 일반 Vol.37 No.3

        The purpose of this study is to introduce George Kelly's Personal Construct Psychology(PCP), a subset of constructivist psychology, and the Repertory Grid Technique(Repgrid). Then, we intended to discuss the applications and availability, limitations of Repgrid. In terms of PCP, humans construe the meaning of life by forming, testing, and revising their own personal construct system of their world. Each individual creates constructs of how the world is construed, and applies it to reality. This theory provides a useful picture of a person because it helps us to understand the person's personality, the inner world, and the meaning of the individual. Repgrid technique is a structured interview technique, assessment tool, psychotherapeutic technique, and research methodology that is developed to explore the personal construct system. This technique provides idiosyncratic information in the content of construct system, and quantifiable measures of construct system in the cognitive structure. Repgrid technique is performed in four steps: Design phase - Administration Phase - Mathematical Analysis - Interpretation Phase. To assist in practical understanding, we described the definitions and examples of elements, constructs and rating,and used a case studied by Leach et al (2001). For analysis of the grid data, we conducted OpenRepGrid. Then, we represented and described the measurements and indices produced in OpenRepGrid with tables and figures. Finally, we discussed the availability and limitations of Repgrid technique. 본 연구는 구성주의심리학의 한 지류인 George Kelly(1905~1966)의 개인구성심리학을 소개하고, 개인구성심리학의 대표적 연구방법인 레퍼토리 그리드 기법(렙그리드)을 소개하는데 목적이 있다. 이를 바탕으로, 렙그리드 기법의 적용방법과 유용성, 한계점을 논의하고자 한다. 개인구성심리학에서 인간은 자신이 경험하는 세상에 대해 의미를 부여함으로써 자신만의 의미 체계를 만들고, 검증하고, 고치면서 삶에 대한 의미를 구성해간다고 본다. 이에 각 개인은 자신의 세계에 대한 구성개념을 생성하고, 그것을 현실에 적용시킨다. 이 이론을 통해 한 개인의 성격과 내적 세계, 개인의 의미를 이해할 수 있다. 렙그리드 기법은 구조화된 인터뷰기법으로, 개인구성체계를 탐색하기 위해 고안된 연구방법론의 하나이며 구성개념 평가도구, 심리치료 기법으로도 사용된다. 이 기법은 구성개념의 내용에 있어서는 개별기술적인 정보를, 구조에 있어서는 양화할 수 있는 구조 측정치들을 제공해주는 질적 연구방법이다. 설계단계-실시단계-채점단계-해석단계로 실시되는데, 이해를 돕기 위해 요소, 구성개념, 평정의 의미를 설명하였으며 Leach 등(2001) 연구의 그리드 사례를 활용하였다. 그리드 자료의 채점을 위해서 OpenRepGrid프로그램을 사용하였고, OpenRepGrid에서 산출되는 측정치와 지표를 표, 그림과 함께 제시하고 설명하였다. 끝으로, 렙그리드 기법의 활용분야, 렙그리드 기법의 유용성과 한계점을 논의하였다.

      • 익산지역 백제 건축유적에서 보이는 새로운 토목·건축 기술

        조원창 원광대학교 마한백제문화연구소 2016 馬韓, 百濟文化 Vol.28 No.-

        King Muwang constructed Mireuksa temple, Jeseoksa temple and Wanggungni Historical Site in Iksan in the early 7th century. The capital of Baekje at the time was Buyeo but King Muwang had such a great interest in Iksan that he ordered large scale public works·construction work to be performed in the area. In Iksan, new public works·construction techniques that have not been found in Buyeo appeared. New public works·construction techniques had a considerable influence on unified Silla after Baekje fell. We can get a sense of full vitality of master artisans of Baekje through above mentioned historical sites. Construction of site in both directions found in Wanggungni Historical Site seems to be public works technique which is unique to Baekje and made good use of steep slope. Technique of the soil and stone are mixed observed in reinforcing facility in east and west stone pagoda of Mireuksa temple is new public works technique which comes close to solid soil in reinforcing facility. A hollow and gyeolgugidan(結構基壇) in Gidanseok observed in the main building of Mireuksa temple site is shown in Gameunsa Temple site built in unified Silla. High cornerstone and Jeoksim facility(積心施設) are observed in Gwanghallu built in Joseon dynasty and historical site in Dongdaemun Stadium. Some construction techniques observed in Iksan seem to have imported from Tang Dynasty. However, most public works·construction seem to have been created by Baekje's development. It appears that a study of buildings of Baekje in Iksan will reveal various public works·construction techniques. 왕은 7세기 초반 익산지역에 미륵사와 제석사, 왕궁리유적 등을 조성하였다. 물론 당시의 왕도는 부여였지만 무왕은 대규모 토목·건축사업을 일으킬 정도로 익산지역에 지극 정성을 보였다. 익산지역에서는 부여지역에서 볼 수 없는 새로운 토목·건축 기술이 출현하였다. 그리고 이들 기술력은 백제 멸망 후 통일신라에 적지 않은 영향을 미치곤 하였다. 비록 나라는 멸망하였지만 백제 장인들의 꿋꿋한 생명력을 엿볼 수 있게 하는 고고자료의 한 부분이라 할 수 있다. 왕궁리유적에서 확인된 양 방향에서의 대지 조성은 급경사면을 효율적으로 이용한 백제 특유의 토목공법으로 이해할 수 있다. 그리고 미륵사지 동탑지와 서탑 축기부에서 관찰된 공법은 축기부 판축토에 버금가는 새로운 토목기술임을 파악할 수 있다. 미륵사지 금당지에서 관찰되는 기단석 내부의 空洞化나 결구기단 등은 통일신라기의 감은사지에서도 찾아지고 있다. 또한 고주형 초석과 적심시설 등은 조선시기의 광한루나 동대문 운동장 부지 유적 등에서 살펴지기도 한다. 익산지역에서 관찰되는 일부 건축기술은 당에서 유입된 것으로 볼 수 있다. 하지만 대부분의 토목·건축 기술은 백제의 내재적 발전을 통해 창안된 것으로 판단할 수 있다. 향후 익산지역에서의 백제 건축물 조사에 따라 좀 더 다양한 토목·건축기술이 등장할 것이라 생각된다.

      • KCI등재

        百濟 石築山城의 築造技法과 性格에 대하여

        沈正輔(Sim, Jeong-Bo) 한국상고사학회 2001 한국상고사학보 Vol.35 No.-

        According to Sam-Kuk Sa Ki(The History of Three Countries), the country Baekche was the most active in constructing the fortresses, and the local administrative district was composed of fortress systems with 200 fortresses, most ofwhich were minly constructed as mountain fortress. The fact that the small sized Baekche fortresses in Baekche is similar to the fortress construction in Bu-Yeo. This reflects that some of Bu-Yeo's tradition is maintained in Baekche's construction technique. Until recently, build a stone fortress has been considered as constructed in the late sixth century. However, Seol-Bong fortress and Ban-Wol fortress were possibly constructed from the late forth century to the late fifth century. This shows that stone-walled fortress had already been constructed during the Han-Sung dynasty. The construction period of Dae-Mo fortress also needs to be re-examined, for the fortress remains are similar to that constructed in the mid-fifth century of Baekche. Regarding Gye-Jok fortress, the estimation that the fortress was constructed in the early fifth century, was found to be true with the excavation of Baeche's necked jar(圓底短頸壺). This jar, possibly made between the late forth and the early fifth century, was found in the foundation layer of the inner southern gate. For further research, the charcoal sample ore, which was collected from the old earth's surface of the northern wall during the first excavation period, was entrusted to the Beta Research Center in the United States. According to the radiocarbon dating measurement, the ore was probably made on the year of 415. Wol-Pyong-Dong fortress might have been first constructed in the late fifth century, but it is probable that the construction period might date further back, for the remains excavated from that fortress such as bird leg figures(鳥足紋) jar, proves that the fortress could have been built during or before the period when Woong-Jin was the capital of Baekche. The construction of Baekche's stone-walled fortress between the late forth and early fifth century on the borderline, could also be seen as the result of the territorial expansion of the King Keun-Cho-Go(近肖古王). Here are the most common methods in forming the fortress's foundation layer. First, the ground is dug until the base rock or the weathered base rock is exposed, and then the fortress is built on the exposed surface. A slope on the surface is either made even by shaving the surface like a stairway, and then by putting the foundation rock over it; or the base rock layer with clay, send, or stones of all sizes is hardened and that hardened surface is used as the foundation layer. If the base rock is used as the foundation layer, a hump is made on the upper layer of the base rock in order to prevent the foundation rock from being shoved. This technique which can be found in Sul-Bong fortress and Gye-Jok fortress, was first used in constructing the fortresses during the period of Goguryo. After forming the foundation layer, two or three layers of clay and earth were supplemented, or flat rock was paved on the foundation layer with the width of 30㎝~80㎝. These more developed methods were used in order to protect the foundation of the fortress, and are found in Im-Jon fortress and Gye-Jok fortress. In building the fortress wall, the rectangular stones were piled up in the shape of “品”. here are two of the ways to pile up the stones. The first method is a vertical construction, by piling two or three layers of rectangular stones, and then putting two layers of long flat stones or one layer of squares stones. The second method is constructing the wall with the trimmed stone of granite horizontally with the outer wall of the fortress itself. But usually, most of the fortresses were constructed by piling up the rectangular stones both crosswide and lengthwide, and crevices between the stones were mostly filed up with Geurangi-building, and wedge stones were not used m 《三國史記》에 의하면 三國 중 백제에서 성곽 축조가 가장 활발하였음을 기록하고 있으며, 地方의 行政單位가 200城의 城體制로 이루어지고 있었음을 알 수 있는데, 이 200城은 대부분 山城으로 파악된다. 또한, 百濟 城郭은 거의 전부가 테뫼식산성을 위주로 축조하고 있는데, 이는 山嶺에 소규모의 山城이 一列로 축조되어 있는 백제성곽이 공격보다는 방어에 목적을 두고 축조하였음에 기인한다고 하겠다. 이와 같이 三國 중 百濟에서 소규모의 테뫼식산성을 주로 축조하여 방어체계를 이루고 있는 것은 夫餘에서의 테뫼식산성의 축조와 관련이 있는 것으로, 夫餘의 전통을 강하게 유지하고 있었음을 반영하는 것이라고 하겠다. 石築山城의 축조시기에 대하여서는 이제까지 6세기 후반으로 편년되고 있었으나, 雪峰山城과 半月山城이 4세기 말에서 5세기 초로 편년되고 있어 漢城期에 이미 석축산성을 축조하고 있음을 확인할 수 있다. 大母山城도 유물상으로 보아 5세기 중반의 百濟山城으로 볼 수 있어 재검토가 필요하다. 鷄足山城은 초축시기를 확인할 수 있는 南門址 안쪽 기저부층에서 4세기 말에서 5세기 초로 편년되는 百濟의 圓底短頸壺가 출토되고 있어 鷄足山城의 축조시점이 5세기 초로 편년할 수 있는 고고학적 근거를 갖게 되었다. 이에 대한 과학적 근거로는 1차 발굴조사 시 北壁 내부 舊地表上에서 채취한 목탄시료를 미국 Beta 연구소에 의뢰한 방사성탄소연대 측정결과중간 값이 415년으로 나타나 뒷받침된다고 하겠다. 月坪洞山城의 축조시기에 대하여 月坪洞遺蹟의 보고자는 초축시기를 5세기 후반대로 추정하고 있어 上限이 더 올라갈 가능성도 제기하고 있는데, 鳥足文土器 등 출토유물로 보아 웅진도읍기 이전으로 올라갈 가능성도 배제할 수 없다고 하겠다. 이와 같이 백제에서의 石築山城의 축조가 당시 國境線上 부근에서 4세기 말에서 5세기 초로 확인되고 있는 것은 近肖古王의 領土擴張과 관련하여 나타난 현상이라고 하겠다. 百濟 山城의 基底部 조성에 있어서 가장 보편적인 방법은 基底를 암반이나 풍화암반층이 노출될 때까지 파내고 그 상면에 체성을 축조하되 경사면을 이루고 있을 경우에는 계단식으로 깎아내어 수평을 맞추고 그 위에 기단석을 올려놓는 방법과 암반층이나 풍화암반층 또는 생토면 위에 점토와 모래 및 잡석을 놓아 다진 후 이를 기저부로 삼고 있는 방법이다. 특히 基底部가 암반인 경우에 基壇石이 앞으로 밀리는 것을 방지하기 위하여 암반 상면에 턱을 만들었는데, 이 技法은 고구려 성곽 축조방법으로 알려져 온 것으로 雪峰山城과 鷄足山城에서 확인되고 있어 주목된다. 한편, 百濟城郭에서 기단석을 포함하여 2~3단 정도를 점토 및 土砂로 補築한다든지 城壁 外部 基底層에 鋪道처럼 幅 30㎝~80㎝ 정도의 구획에 납작한 板石을 깔은 것은 모두 基壇部를 보호하기 위한 것으로 任存城과 鷄足山城에서의 基壇補築도 같은 맥락으로 보다 발전된 양상을 보여주는 것이라 하겠다. 城壁의 築造方法을 살펴보면, 장방형의 석재를 사용하여 ‘品’자형으로 쌓아 올리되, 長方形 石材를 2단~3단 놓은 후 그 위에 얇고 길이가 긴 板石形 石材를 2단이나 正方形 石材를 1단을 놓는 방식을 사용하고, 들여쌓기를 하지 않아 성벽 단면이 거의 수직에 가깝게 축조하는 방법과 版築으로 조성된 體城 외벽에 花崗石材를 治石한 成石을 수평을 맞추어 축조하고 있는 例가 제시되고 있으나, 일반적으로는 대부분의 산성들이 가공한 장방형의 석재를 가로쌓기 및 모로쌓기로 수평을 맞추어 축조하되, 石材와 석재 사이의 빈틈은 그랭이쌓기를 채용하여 해결하였으며 쐐기돌로 메운 곳은 그리 많지 않다. 즉 下段 石材의 윗면에 맞추어 그 위에 놓여질 石材의 아랫면을 깎아내 조정하여 빈틈이 없도록 하고 水平을 맞추어 축조하면서 성벽 外面의 단면은 圭形을 이루고 있는 것을 축조기법상의 특징이라고 할 수 있겠다. 公山城을 비롯하여 鷄足山城, 黔丹山城, 姑蘇城 등에서 石築으로 정연하게 축조된 集水池가 확인되었다. 이와 같이 대규모의 集水池를 정연하게 축조하고 있는 것은 아직 新羅山城에서는 확인이 되지 않고 있는 것으로 百濟山城의 또 다른 특징 중의 하나라 하겠다. 城郭遺蹟에서 기와의 출현은 城의 築造時期 및 使用時期를 파악할 수 있는 가장 중요한 遺物인데, 평기와 내면에 통쪽(模骨)와통의 흔적이 高句麗와 百濟 山城에서 공히 나타나고 있으며, 또한, 평기와의 內面에 繩蓆紋이 확인되고 있는데 이 문양이 百濟의 傳統的인 技法일 가능성이 높은 것으로 밝혀지고 있어 주목되고 있다.

      • KCI등재

        경주 남산신성의 축성현황 보고

        박종익 영남고고학회 2014 嶺南考古學 Vol.- No.69

        경주 남산신성은 신라왕경의 남쪽에 위치하는 남산에 축조된 편축식 석성이다. 해목령을 잇는 주능선이 남북으로 길게 솟아 있으나, 능선상에 성벽이 입지하지 않고 동서 양사면의 골짜기를 넓게 포함하는 포곡식 산성으로 산록에 축성되어 있다. 남산신성의 축조의미는 단순히 외적의 침입에 대비한 피난성으로서 방어적이며 소극적인 의미보다는 새로운 지배체제의 출발을 알리는 적극적인 의지를 내포한 상징적인 의미가 있는 것이며, 아울러 신라 성곽 발달사의 한 단면을 잘 보여주는 유적이라 할 수 있다. 남산신성은 591년의 초축과 679년의 증축기록이 뚜렷한 신라 왕도의 산성이다. 현존하는 성벽이 곳곳에서 확인되고 있으나, 체성의 축조에 사용된 성돌과 축조기법으로 보아 초축시의 성벽은 북서쪽 골짜기 한 곳에서 확인된 것을 제외하면대부분 증축시의 성벽으로 파악하였다. 증축시의 성벽에서는 대부분 장방형 내지 세장방형의 성돌로 바른층쌓기를 유지하면서 일부 구간에서 2열축조기법과 부분적인 보축의 확인으로 증축시기의 축조수법으로 뒷받침하고 있다. 신라산성의특징적인 보축이 현재까지 보고되지 않고 있었으나, 최근 필자의 정밀지표조사 결과 부분적으로 기저부에서 확인되고 있어 신라의 전통적인 축성기법이 남산신성에서도 유존하고 있음을 알 수 있었다. 그러나 초축시의 체성과 증축시의 체성 입지와 규모 등을 파악할 수 있는 정확한 자료가 확인되지 않는 미비점이 있지만, 초축시의 사실을 보여주는 남산신성비가 현재까지 10기 확인되고 있어 차후 발굴조사가 이루어진다면 이러한 미비점들은 해소되리라 여겨진다. Gyeongju Namsansinseong is a Pyunchooksik stone fortress built in Namsan which is located in the south of Silla’s royal district. Although the main ridge connected to Haemokryeong rises long to the north and the south, the ramparts are not located on the ridge. It is built on the foot as a Pogok style fortress widely embracing the valleys located in both slopes on the east and the west. The meaning of building Namsansinseong is not merely defensive or passive as a fortress for evacuation to cope with foreign invasion but symbolic as it implies aggressive intention to declare a departure of the new ruling system. Furthermore, we can say that it is remain that well shows an aspect of the developmental history of Silla’s fortresses. Namsansinseong is one of the fortresses of Silla Dynasty as the record clearly shows it was initially built in 591 and then extended in 679. Although the ramparts still remaining are found in many places, according to the fortress stone and construction technique used to build the fortress body, the ramparts found in a valley on the northwest side were built at the initial construction, and most of the rest were built at the extension. The ramparts built at the extension are mostly made of rectangular or slender rectangular fortress stone, and they maintain horizontal accumulation. In some of the sections, 2-row construction technique and partial Bochook are observed, and this supports it as it is the accumulation technique used at the extension. Even though Bochook, one of the crucial features of Silla’s fortresses, has not been reported so far, it was observed from the base partly as a result of this author’s latest precise earth surface investigation; therefore, we can see that Silla’s traditional fortress construction technique is also found in Namsansinseong. However, there is still limitation that this study was not able to find any accurate data with which we can figure out the fortress body at the initial construction or the location or scale of the fortress body at the extension. Despite this, it is expected that this limitation can be eliminated afterwards if further excavation research is conducted as there have been 10 stone monuments of Namsansinseong fortress found up to now which verify the facts at the initial construction.

      • Lifting Load Recording and Management Method of the Lift for Construction Based Sensing Information

        Taekyu Ko,Joonghwan Shin,Kyuhyup Lee,Soonwook Kwon,Chung-Suk Cho,Suwan Chung,Goeun ,Choi Council on Tall Building and Urban Habitat Korea 2022 International journal of high-rise buildings Vol.11 No.2

        While buildings in recent days become taller and larger, many problems occur during the management of construction. Particularly, as the vertical movement of manpower and materials during construction has become longer while the lifting frequency and load increase, the need for a good lifting management practice is also increasing. Therefore, this study presents a real-time lifting performance monitoring system that can store and manage lifting records for construction management. Through review of literature and preceding studies related to construction lift, the concept of lift planning and operation management was understood, leading to the development of a system to monitor lifting operation and performance information. This system enabled quick measurement of the lifting performance during construction phase while responding to changes in the project schedule. To verify this system, a case study was conducted in which the current status and characteristics of the sensing-based lifting performance were derived.

      • KCI등재

        Data Refactor 기법의 개선을 통한 건설원자재 가격 예측 적용성 연구

        리우양,이동은,김병수 한국건설관리학회 2023 한국건설관리학회 논문집 Vol.24 No.6

        The construction industry suffers losses due to failures in demand forecasting due to price fluctuations in construction raw materials, increased user costs due to project cost changes, and lack of forecasting system. Accordingly, it is necessary to improve the accuracy of construction raw material price forecasting. This study aims to predict the price of construction raw materials and verify applicability through the improvement of the Data Refactor technique. In order to improve the accuracy of price prediction of construction raw materials, the existing data refactor classification of low and high frequency and ARIMAX utilization method was improved to frequency-oriented and ARIMA method utilization, so that short-term (3 months in the future) six items such as construction raw materials lumber and cement were improved. ), mid-term (6 months in the future), and long-term (12 months in the future) price forecasts. As a result of the analysis, the predicted value based on the improved Data Refactor technique reduced the error and expanded the variability. Therefore, it is expected that the budget can be managed effectively by predicting the price of construction raw materials more accurately through the Data Refactor technique proposed in this study.

      • KCI등재

        근로자 예비 설문과 델파이기법을 활용한건설현장 안전보건교육 개선 방향 분석

        봉진균,원정훈 한국안전학회 2018 한국안전학회지 Vol.33 No.1

        The improvement of safety and health education method in construction site was investigated through the survey for workers and delphi technique. The results of preliminary survey done for workers were analyzed using the multi variance analyses, and the questionnaires for delphi survey were composed based on the results of preliminary survey. Finally, the participatory safety and health education method was suggested. The result showed that most of workers were very interested in accident prevention and health. On the contrary, they did not actively participate in safety activities in sites including safety and health education. In order to improve workers' levels of safety consciousness and prevent the construction accident, the participatory safety and health education method that construction workers directly examine and give presentations about accident causes and measures was suggested and verified by tests. One-way instructor-led safety and health education used widely and participatory safety and health education with workers were carried out by dividing participants into two groups. After education, the examination is done for two groups. The test results found that the average score of safety consciousness of the worker group that received participatory safety education was higher than that of the work group that received instructor-led safety education. And the Delphi technique utilizing experts was analyzed that participatory safety education has a great effect on improvement of workers' level of safety consciousness.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼