http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
국내 기후와 환경에 적합한 터널브래킷 선정에 관한 연구
장광훈(Kwang-Hun Jang),서기범(Ki-Bum Seo) 대한전기학회 2014 전기학회논문지 Vol.63 No.7
Tunnel bracket is used in railway tunnel area in order to maintain insulation. Insulator performance evaluation test is proceeded refer to IEC 61109 but it is impossible to reflect all the field condition where insulator installed. Korea has clear four season in climatic condition and peninsula with lots of mountain in geomorphology condition. Tunnel bracket material which used in korea are butyl rubber, polymer and silicone. Most of them were installed without any internal climatic and geomorphology condition. According to the KORAIL operation data most of the insulator break down occurs in tunnel. So interval of inspection period is shorter then any other insulator and lots of maintenance cost incurs. Most major railway advanced country such as germany and japan maintain tunnel bracket with their own experience. For example visual inspection carried out with in one or two years and detailed inspection carried out between three to five years. This paper analyzed materials and shapes of tunnel bracket to in order to find optimized one in korea peninsula. Proposed bracket were tested under regulation and experience field data. Finally it was installed at the field and evaluated until now.
컨트롤 - 1000과 PC를 이용한 제어관리시스템의 설계와 구현
장광훈(Kwang Hoon Chang) 한국정보과학회 1993 한국정보과학회 학술발표논문집 Vol.20 No.1
이 논문은 컨트롤-1000과 PC를 이용한 제어관리 시스템을 설계하여 구현하였다. 컨트롤-1000시스템은 EVENT와 LOGGING 프린터, 모니터, 키보드, 아날로그 입출력 보드, 디지탈 입출력보드, 메인 CPU 보드로 구성하였으며, 실제 산업설비의 각종 단위기기들을 제어하고 감시하도록 구성, 설계되었다. PC는 컨트롤-1000시스템으로부터 전달되어지는 다수의 EVENTS에 대해서 합성음성출력을 지원하기 위해서 사용하였다. 시스템 소프트웨어는 실시간 운영체제, 인터럽트 핸들러, 입출력 핸들러의 3가지 중요한 요소로 구성되어있다. 3가지 시스템 소프트웨어는 멀티타스킹 잡을 처리하기 위해서 유기적으로 연결하여 다양한 EVENT를 효율적으로 관리하고 제어한다. 제어관리 시스템은 Z-80 CPU 보드와 A/D, D/A 보드, 아날로그와 디지탈 입출력보드, 합성음성 지원카드와 PC로 구성하고 실제 단위기기들을 연결하여 실험하였다.