RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제
      • 좁혀본 항목 보기순서

        • 원문유무
        • 원문제공처
          펼치기
        • 등재정보
        • 학술지명
          펼치기
        • 주제분류
        • 발행연도
          펼치기
        • 작성언어
        • 저자
          펼치기

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI등재

        Design of Web-Based Module and Process for Metal Resource Management

        Jung, Sung-Mo,Kim, Seok-Soo The Korea Contents Association 2008 International Journal of Contents Vol.4 No.1

        Existing improvement measures for resource management are merely concentrating on the document automation only. In addition, such improvements rarely benefit metal millwork management. Following the trend of constructing high rise and multi-complex buildings, the importance of resource management from the aspect of construction project management is being emphasized. Metal work resources are critical most of construction projects, it became a target for special management. Therefore, the study has determined work process of metal work resource management, for the metal millwork is one of the most important construction materials most of construction projects, and proposed a web based module for improving the management task.

      • KCI등재후보

        Design of Web-Based Module and Process for Metal Resource Management

        정성모,김석수 한국콘텐츠학회 2008 International Journal of Contents Vol.4 No.1

        Existing improvement measures for resource management are merely concentrating on the document automation only. In addition, such improvements rarely benefit metal millwork management. Following the trend of constructing high rise and multi-complex buildings, the importance of resource management from the aspect of construction project management is being emphasized. Metal work resources are critical most of construction projects, it became a target for special management. Therefore, the study has determined work process of metal work resource management, for the metal millwork is one of the most important construction materials most of construction projects, and proposed a web based module for improving the management task.

      • KCI등재후보

        멀티프로젝트를 수행하는 전문건설업체의 최적인력관리방안 기초연구 - 철근·콘크리트공사 중심으로 -

        서종민,나영주,김선국 한국건축시공학회 2008 한국건축시공학회지 Vol.8 No.5

        Recent trends in construction towards larger scale and taller buildings are causing problems by ineffective existing management approach in construction industry have emerged. Delivering necessary materials and mobilizing the human resources and equipment in a timely manner to keep labor on schedule have become a critical issue to be addressed. In particular, many specialty contractors carrying out multiple projects have been experiencing difficulties mobilizing the manpower on time and in right places due to poor communication at each stage of labor supply, resulting in waste of valuable resources. Hence, it’s imperative for the specialty contractors to obtain specific information on labor demand so as to set up a communication and labor management system to ensure the right human resources will be mobilized in the right place at the right time. The study therefore is aimed at developing an optimal human resources management system for specialty contractors performing multiple projects. To that end, the study is focused on rebar and concrete work. The outcome of the study is expected to help allocate the right human resources to the right place in a timely fashion, thereby achieving an effective workflow at construction sites.

      • SCOPUS

        Factors Affecting the Work Motivation of the Construction Project Manager

        PHAN, Phuong Thanh,PHAM, Cuong Phu,TRAN, Nhu Thi Quynh,LE, Hang Thi Thu,NGUYEN, Hanh Thi Hong,NGUYEN, Quyen Le Hoang Thuy To Korea Distribution Science Association 2020 The Journal of Asian Finance, Economics and Busine Vol.7 No.12

        Project manager plays a very important role in the success of any project. The primary duty of the project manager is to combine the outcomes or results of the various processes and activities of project management into a systematic project management strategy or plan for the project. In the construction industry, a lack of motivation is an urgent problem for many project managers in construction and engineering projects. Lack of motivation affects the quality and productivity of jobs, reducing profits and growth for companies, businesses, contractors or organizations that rely on human resources. The reasons for this lack of motivation are diverse ranging from salary to culture to life and working environment, among others. Through surveys and data analysis using Cronbach's Alpha reliability and EFA (Exploratory Factor Analysis), our research scaled the factors affecting work motivation of project managers in the construction industry in Vietnam. The research results identified six major groups of relevant factors including (i) salary and benefits, (ii) work environment, (iii) promotion opportunities, (iv) organizational culture, (v) interest in the job, and (vi) relationship with the organization. From there, this paper contributed useful information as well as measures for businesses, companies, contractors or organizations in the construction industry.

      • KCI등재

        Resource Constrained Project Scheduling by Harmony Search Algorithm

        Omer Giran,Rasim Temur,Gebrail Bekdaş 대한토목학회 2017 KSCE JOURNAL OF CIVIL ENGINEERING Vol.21 No.2

        The construction industry is nonhomogeneous and also managing construction projects are more difficult in today's world. Construction projects are huge and contractors want to accomplish them within a short time in this fast changing era. Therefore, the time and resource have to be managed for a successful construction project management. Resource leveling is one of the primary tools used for managing resources. The target is leveling the resources within a minimum time period to complete the project successfully. Resource constrained project scheduling problems (RCPSP) are a Non-deterministic Polynomial-time hard (NP-hard) problem therefore heuristic methods can be used to solve it. This paper presents a harmony search method for solving the RCPSP. In order to compare the performance of the developed software three examples were chosen from the literature. Computational results indicate that the harmony search method is more effective, rapid and suitable for the RCPSP than existing solutions.

      • KCI등재

        Analysis of Construction Cost Fluctuation Trends and Features on Apartment Housing

        Park, Wonyoung,Kang, Tai-Kyung,Baek, Seung-Ho,Lee, Yoo-Sub The Korean Institute of Building Construction 2012 한국건축시공학회지 Vol.12 No.6

        Construction projects, including housing, are carried out over long periods of time. According to changes to the construction period, the cost of input materials and wages also changes. Therefore appropriate management is important in order to minimize cost risks caused by fluctuations in prices. In Korea, housing units are usually sold in lots prior to construction completion. Therefore, careful management of input elements such as materials and equipment that are sensitive to price fluctuations is very important. This study deals with how the price fluctuation of materials, labor, and equipment influences the change of housing cost and seeks a way for cost management through identifying key resources sensitive to price fluctuation. As a result, a change to the housing cost index multiplies depending on cost changes of materials and labor together. Labor costs are a major factor on the housing cost index. In addition, certain types of materials and labor input to housing construction greatly influence price fluctuations. Thus, it is found that managing those main cost factors is the key for effective cost management.

      • KCI등재

        지적행정서비스의 실태분석 및 전략에 관한 연구

        김남식(Kim Nam Sik) 한국지적정보학회 2003 한국지적정보학회지 Vol.5 No.-

        본 연구자는 지적행정 조직에 대한 체계적인 이해를 높이는 연구영역의 범위를 좀더 넓게 확대시키기 위해 지적행정서비스의 전달체계, 인적자원, 그리고 서비스의 질이라는 세 가지 연구 영역을 선정하여 현행 지적행정서비스의 실태와 문제점을 분석ㆍ평가하고 지적행정서비스의 현대화를 위한 체계를 구축하여 보았다. 전달체계의 현대화 전략으로는 지적행정조직의 생존 및 성장전략, 사무분장 기준의 명확화, 지적행정 조직진단이 요구 된다. 인적자원의 현대화 전략으로는 지적직공무원들의 직무만족에 관심을 갖고, 누적된 인사 문제의 해결을 위해 지적기술고시의 도입과 공개경쟁제도를 정착하여야 할 것이다. 끝으로 서비스질의 현대화 전략으로는 지적행정서비스 수요 측정의 현실화를 위해서는 주관적인 지표와 객관적인 지표, 혹은 지적행정서비스 공급자인 지적행정조직과 소비자인 고객들의 의식을 상호 비교하여 대처하여야 할 것이다. Thesis establish three things in order to enhance understand of Land Management's organization as enlarge a scope of study. By analyzing and valuing the actual state of Land Management Administration Service and problems in the three sides of a system of Land Management Administration Communication. human resource and a quality of service, in order to construct a system of Sand Management Administration's Modernization a purpose of this thesis must propose as follows. First modenizing strategy in a system of Sand Management Administration Communication is demanded survival of organization and development of organization. Second, a modenizing strategy of human resource its organization must be concerned a function satisfaction of its civil service, introduced technique an examination and fixed open competition to select a civil service of land management. Finally, a modernizng strategy of service quality To realize a need measurement of Sand Management Administration Service, it must be interested in consciousness of civil service and customer.

      • Matrics, Risk and Project Management

        마틴스미스(Martin Smith) 한국BIM학회 2017 한국BIM학회 학술대회 논문집 Vol.2017 No.-

        Matrics 는 management of activities, time, and resources for international construction solutions를 의미합니다. 이 방법은 프로젝트 초기부터 준공에 이르기 까지 전 단계에 걸쳐 다양한 관점에서 복잡한 연관성을 가진 프로젝트 정보를 효과적으로 기획하고 관리함으로써 리스크 예측, 대응, 관리는 물론 프로젝트 관리를 누락과 중복없이 효과적으로 지원할 수 있는 방법입니다. Matrics is solutions for management of activities, time and resources for international construction. This is provided by a transparent project model which includes the use of a common database, technical dictionary and library for all construction information. The model is structured into a series of inter-related matrices so as to enable all parties to a construction project independent of language, location, organisation or activity to access and apply information with the minimum of effort.

      • KCI등재

        An Efficient Hybrid Differential Evolution based Serial Method for Multimode Resource-Constrained Project Scheduling

        Min-Yuan Cheng,Duc-Hoc Tran 대한토목학회 2016 KSCE Journal of Civil Engineering Vol.20 No.1

        The Multimode Resource-Constrained (MRC) problem aims at finding the start times and execution modes for the activities of a project that minimizes project duration under current precedence constraints and resource limitations. This study integrates the fuzzy c-means clustering technique and the chaotic technique into the Differential Evolution to develop the Fuzzy Clustering Chaotic-based Differential Evolution (FCDE) algorithm, an efficient hybrid approach to solving MRC and other related problems. Within the FCDE, the chaos prevents the optimization algorithm from premature convergence and the fuzzy c-means clustering acts as several multi-parent crossover operators for utilizing population information efficiently and enhance convergence efficiency. Further, this study applies a serial method to reflect individual-user priorities into the active schedule and the project duration calculations. Experiments run indicate that the proposed FCDE-MRC obtains optimal results more reliably and efficiently than the benchmark algorithms considered. The FCDE-MRC is a promising alternative methodology to handling resource-constrained problems.

      • KCI등재

        Dynamic Optimization for Analyzing Effects of Multiple Resource Failures on Project Schedule Robustness

        Ramin Ansari 대한토목학회 2021 KSCE JOURNAL OF CIVIL ENGINEERING Vol.25 No.5

        This study develops hybrid modeling and algorithmic frameworks for analyzing the mutual effects of multiple sources of uncertainty on the quality and the robustness of construction schedules. To cope with multiple sources of disruptions, i.e., random resource failures and severe weather conditions, this paper develops a simulation-optimization model that aims to generate delay resistant project schedules. The Variable Neighborhood Search (VNS) is hybridized with an event-driven simulation framework to generate efficient and robust solutions for computationally expensive resource-constrained project scheduling problems (RCPSP). The simulation experiments have been carried out by a flexible modeling framework that can be adopted by project experts to design construction schedules subject to the uncertainty associated with the multiple resource failure. The problem is mathematically formulated as a bi-objective optimization model aiming to minimize the project makespan and maximize a novel surrogate robustness function simultaneously. The computational results of the proposed VNS method have been compared with those obtained from the commercial optimization solvers. The simulation-optimization model's application is demonstrated through a case study of the hydropower plant construction project with multiple renewable and non-renewable resources. Based on an extensive statistical analysis of real-life scenarios, this study contributes to a trade-off analysis of project makespan and robustness in construction projects. The t-test statistical analysis results indicate the significance of the project's average delay reduction by implementing the robust project schedule. The outcomes confirm that the designed framework can generate a more efficient project schedule with a higher rate of protection compared with the existing robust approaches.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼