      • 노후인프라 자산관리를 위한 효용이론 적용 방안

        차용운 ( Cha Yongwoon ),박원영 ( Park Wonyoung ),박태일 ( Park Taeil ) 한국건축시공학회 2021 한국건축시공학회 학술발표대회 논문집 Vol.21 No.1

        As the number of deteriorated infrastructures increases, research on decision-making methods for efficient budget allocation is required. Thus, this study considered the application of utility theory for asset management of deteriorated infrastructure. In decision-making, methods that enable quantitative measurement were proposed, attributing the aging, economic feasibility, and ripple effects. This study is meaningful as a basic study of decision-making methods, and we will conduct research applied to case studies in the future.

      • 건설공사 사후평가 파급효과 지표 개선방안

        차용운 ( Cha Yongwoon ),정서영 ( Jung Seo-young ) 한국건축시공학회 2023 한국건축시공학회 학술발표대회 논문집 Vol.23 No.1

        The ripple effect is analyzed in the post-construction evaluation phase, but only the qualitative analysis and simple numerical fluctuations are analyzed, thus, no reliable ripple-effect analysis has been conducted. Therefore, in this study, a focus group interview was conducted with 10 experts to propose a plan to improve the ripple effect metrics. Consequently, by linking with the policy-effect metrics of the pre-feasibility study, it is expected that the utilization of the analysis results will be improved and objective and quantitative analysis will be possible.

      • KCI등재

        분양가상한제 적용 공동주택의 기본형건축비와 실제 건축공사비 비교

        차용운(Yongwoon Cha),박태일(Taeil Park),박원영(Wonyoung Park) 한국산학기술학회 2021 한국산학기술학회논문지 Vol.22 No.12

        최근 분양 공동주택의 고분양가 및 로또 청약 등이 사회적 이슈가 되면서 언론에서 분양가격을 산정하는 기준인 기본형건축비에 대한 문제 제기가 지속적으로 일어나고 있다. 2007년 9월 처음 기본형건축비가 도입된 이후 15년간 기본형건축비와 실 건축비를 비교하는 연구는 전무한 실정이다. 이에 본 연구에서는 현행 기본형건축비와 언론에서 제시한 5개 실제 공공건설 공동주택 사업의 실 건축공사비를 비교하여, 기본형건축비가 실제 사업특성을 반영한 수준인지 적정성을 검토하였다. 이를 위하여 국민주택규모인 21층, 60~85㎡ 면적을 기준으로, 기본형건축비와 실 건축공사비를 비교하였다. 그 결과 국토부 고시 기본형건축비는 708만원/3.3㎡, 언론에서 제시한 5개 사례의 실제 건축비는 670만원/3.3㎡으로 나타났으며, 건축비의 차이는 실제 건축공사비가 기본형건축비 대비 38만원/3.3㎡ 낮은 수준인 것으로 분석되었다. 결과적으로, 약 5.54% (38만원/3.3㎡)의 오차가 발생하였고, 학술적으로 오차범위 내에서 기본형건축비가 매우 정확하게 예측됐다고 볼 수 있다. 본 연구를 통하여 분양가상한제의 도입 취지에 맞도록 양질의 주택을 합리적인 가격에 공급함으로써, 국민 주거안정 및 질 향상에 기여할 수 있을 것으로 기대된다. This study compares the existing Construction Costs for Basic Type (CCBT) and the Actual Construction Costs (ACC), in order to examine the adequacy of CCBT to reflect the actual multi-housing project characteristics. Since the first CCBT in 2007, no research has been conducted to compare the CCBT with the ACC. Thus, this study compared and analyzed the ACC of five projects provided by the media and the current CCBT. The result showed that for the 21st floor with 60-85㎡ area, the CCBT was 7.08 million won/3.3㎡, and the ACC in five cases was 6.7 million won/3.3㎡. The difference in construction costs was found to be lower in ACC than in CCBT by 380,000won/3.3㎡. Consequently, about 5.54% (380,000won/㎡) error occurred, and it could be inferred that the CCBT was estimated quite accurately within the academic error range. Hence, it is expected that this study would contribute to national housing stability and improve housing quality by supplying high-quality multi-housing at a reasonable price.

      • KCI등재

        건설프로젝트의 품질결함의 발생요인간 상관분석

        지성준,차용운,한상원,Chi, Sungjoon,Cha, Yongwoon,Han, Sangwon 한국건설관리학회 2015 건설관리 : 한국건설관리학회 학회지 Vol.16 No.2

        공사비 증가와 공기 지연 등 건설프로젝트에 악영향을 미치는 건설품질결함은 지속적으로 발생하고 있다. 그간 결함을 유발시키는 원인들을 규명하기 위한 연구는 다수 있었으나, 원인들 간의 상관관계를 분석한 연구는 충분히 이루어지지 않았다. 본 논문에서는 국내 30개 프로젝트에서 발생한 1,241건의 부적합 사례 중 831건의 건축공종 부적합 사례를 토대로 건설품질결함의 발생요인을 발생단계, 발생현상, 기인원인, 처리방안으로 나누어 이들 간의 상관관계를 분석하고자 한다. 상관분석을 통해 부적합은 주로 조달 및 시공단계에서 기능결함 및 시공결함의 형태로 발생함을 알 수 있었다. 주로 작업자의 실수, 조악한 품질의 자재사용, 그리고 잘못된 시공방법에 의해 발생되는 품질결함은 주로 특채, 수리, 재작업의 방법으로 처리되어 공사비 증가 및 공기 지연을 가져옴을 알 수 있었다. 본 논문은 향후 품질결함의 발생과정을 규명하고 효율적인 품질결함 방지대책을 수립하는 데에 있어 중요한 이론적 배경과 정량적 지표를 제공했다는 데 그 의의가 있다. Construction defects are major components that result in cost overruns and schedule delays in construction projects. There have been extensive research efforts to investigate the cause of defects. However, little effort has been devoted to analyze correlation among various reasons of construction defects while a defect is not usually an outcome of a single cause, but rather occurs when several interrelated causes combine. Based on this recognition, this paper analyzes 831 nonconformity reports collected from 30 construction projects in Korea from 2011 to 2014. The correlation analysis revealed that a significant portion of construction defects occurred in the procurement and construction phase and as the pattern of function defect and installation defect. Triggered by human error, defective material and faulty method, these defects are treated by conccession, repair, rework that can significantly lower the cost and schedule performance. This paper is significant in terms of providing a theoretical basis for analyzing correlation among various reasons of construction defects and quantitative measures for establishing effective defect prevention strategies.

      • KCI등재

        건설공사 품질관리 적정성 확인 점검 결과를 통한 건설 품질관리 개선방안

        정상기,박정은,차용운,한상원,현창택,Jung, Sangki,Park, Jungeun,Cha, Yongwoon,Han, Sangwon,Hyun, Changtaek 한국건설관리학회 2016 한국건설관리학회 논문집 Vol.17 No.1

        최근 국내 건설 산업은 높은 경제성장률과 신기술 도입 등으로 인하여 대형화, 초고층화, 첨단화가 되어가고 있으며, 건설 품질에 대한 사용자의 관심과 요구 수준은 더욱 높아지고 있다. 이는 과거의 양적인 성장위주에서 벗어나 시장변화에 능동적으로 대처할 수 있는 한층 더 체계적이고 수준 높은 품질관리의 필요성이 요구된다고 할 수 있다. 정부는 이러한 시대적 요구사항을 반영하여 건설공사의 시공 및 사용재료에 대한 적정성 여부와 부실시공 방지 등 품질확보를 위한 점검을 강화하고 있다. 그러나 이와 같은 점검 강화에도 불구하고 품질관리에 대한 인식 부족 및 형식적인 품질관리 운영 등으로 인하여 많은 문제점이 발생되고 있으며, 품질관리 점검 시 반복적이고 지속적으로 지적사항이 발생되고 있다. 따라서 본 연구에서는 반복적인 지적사항을 줄이고, 부적절한 품질관리와 부실시공을 방지하기 위해 서울시 품질시험소에서 2012년 3월부터 2014년 10월까지 393개 건설현장의 품질관리 적정성 확인 점검을 통해 도출한 지적사항 3,443건을 심층 분석하여 실효성 있는 현장 품질관리 개선방안을 제시하고자 한다. 본 연구에서 제안한 현장 품질관리의 개선방안을 통해 부적절한 품질관리와 부실시공의 방지, 반복적이고 지속적으로 나타나는 지적사항의 감소, 현장의 품질관리 업무향상과 같은 개선효과가 있을 것으로 기대된다. Construction projects are getting more complex and larger-sized with a high economic growth rate and development of new construction technologies. In addition, interests and demands on standards of construction quality are further increasing. This trend requires more systematic and a higher level of construction quality management. While the government has strengthened the regulations for quality assurance, many quality problems have repeatedly occurred mainly due to lack of recognition for quality management and quality control systems. To address this issue, this paper aims to suggest quality management improvement scheme through analyzing 3,443 nonconforming items identified during inspection of 393 construction sites from March 2012 to October 2014. The quality management improvement scheme suggested in this research is expected to prevent quality problems and defects and thus improve construction performances.

      • KCI등재

        건설프로그램 종결단계의 업무프로세스 도출

        이우연,이승훈,차용운,현창택,Lee, Woo-Yeon,Lee, Seung-Hoon,Cha, Yongwoon,Hyun, Chang-Taek 한국건설관리학회 2020 한국건설관리학회 논문집 Vol.21 No.2

        건설 프로그램 관리는 프로젝트의 복잡성과 다양한 이해관계자로 인해 기존의 관리 방식에 비해 좀 더 체계적인 관리가 요구된다. 특히, 최근 종결단계로 갈수록 발주자의 기대와 시공자의 결과물 사이에 차이가 발생하여 인수인계 지연, 갈등과 마찰, 법적 분쟁 증가되고 있어 종결단계 프로세스의 체계화는 절실한 실정이다. 본 연구는 건설프로그램의 성공적인 종결을 위해 국내외 문헌 및 사례조사를 통해 종결단계 프로세스와 업무활동을 제안하였다. 또한 제안된 프로세스와 업무활동을 전문가 검증을 통해서 프로세스 분류의 적정성과 현장 적용가능성에 대해 검증을 하였다. 본 연구에서 제안된 종결단계의 프로세스와 업무활동을 프로그램뿐만 아니라 건설프로젝트 현장에 활용하여 종결단계 업무 한계를 극복하고 발주자의 만족도 향상은 물론 국내 기업의 글로벌 경쟁력 강화에 일조 하고자 한다. Construction program management requires more systematic management than traditional management methods due to the complexity of the project and various stakeholders. In particular, the systematization of closure phase of the process is in urgent need as there is a difference between the owner's expectations and the contractor's deliverables, resulting in delayed handovers, conflicts, frictions, and increased legal disputes. This study identified the process and activities of closure phase through domestic and international literature and case studies for the successful closure of the construction program. Further, the proposed processes and activities were verified through expert verification for appropriateness and the possibility of application to the site. By utilizing the processes and activities proposed in this study, the project aims to overcome the limits of closure phase and improve the satisfaction of the owner, as well as to enhance the global competitiveness of domestic construction companies.

      • KCI등재

        건설근로자가 갖는 안전불감증의 특성분석

        김세엽,차수현,차용운,한상원,Kim, Seyeob,Cha, Suhyeon,Cha, Yongwoon,Han, Sangwon 한국건설관리학회 2021 한국건설관리학회 논문집 Vol.22 No.2

        건설사고를 예방하기 위해 사고의 원인을 규명하기 위한 많은 노력이 있었다. 그럼에도 불구하고 여전히 건설산업에는 많은 안전사고 발생한다. 사고가 발생하는 이유는 원인을 몰라서가 아니라, 사고의 원인과 대책을 알고 있음에도 불구하고, 사고의 위험성을 과소평가하거나 주의를 기울이지 않는 안전불감증에 기인한다. 이에 본 연구에서는 건설근로자가 느끼는 안전불감증과 이를 유발하는 문화적, 경제적, 교육적, 기술적, 작업관리적의 5가지 종류의 원인들을 도출하였다. 103명의 건설근로자를 대상으로 수행한 설문조사를 통해, 건설근로자의 안전불감증을 줄이기 위해서는 체계적인 안전교육이 가장 중요한 수단이 될 수 있음을 알 수 있었다. 반면, 경제적인 원인은 건설근로자의 안전불감증의 정도에 상관없이 불안전한 행동이나 불안전한 상태를 유발할 수 있는 가장 큰 요인으로 파악되었다. 또한, 설문조사를 통해, 건설근로자의 가장 많은 비중을 차지하는 40대와 50대의 안전불감증이 20대나 60대 이상보다 현저히 높은 것으로 파악되었다. 본 논문에서 분석된 건설근로자의 안전불감증에 대한 인식과 이에 대한 연령 및 근무경력에 따른 특성은 향후 안전사고 예방에 기여할 수 있을 것으로 기대한다. There have been many efforts to identify and eliminate the direct causes of the construction accident, but many accidents are still occurring in the construction industry. The main reason for the construction accident is not because of ignorance of the causes, but because of safety insensitivity. This paper analyzes why construction workers feel safety insensitivity and how safety insensitivity varies depending on their age and work experience. A survey of 103 construction workers confirmed that systematic safety education is the most important factor in minimizing safety insensitivity of construction workers. On the other hand, economic reasons such as cost reduction were identified as the most tempting factor to increase safety insensitivity. In addition, the survey results showed that those in their 40s and 50s, the largest proportion of construction workers, have a significantly higher level of safety insensitivity than those in their 20s and 60s. These findings are expected to be valuable source that can be used to prevent construction safety accidents.

      • KCI등재

        글로벌 건설 엔지니어링 고급인력 양성사업의 교육프로그램 개선방안

        박현,박인석,차용운,Park, Hyeon,Park, In-Seok,Cha, Yongwoon 한국건설관리학회 2016 건설관리 : 한국건설관리학회 학회지 Vol.17 No.6

        본 논문은 S대학교 대학원에서 수행하고 있는 '글로벌 건설 엔지지어링 고급인력 양성 사업'에 대한 중요도-만족도 분석을 실시하고 이를 토대로 교육프로그램의 효과성을 제고하는 방안을 제안하는 것을 목적으로 한다. 최근 해외건설시장은 매년 증가 추세를 보이고 있으며, 특히 사업타당성 분석 등과 같이 부가가치가 높은 사업의 기획단계에서의 역량강화가 강조되고 있다. 하지만 국내 시공 및 엔지니어링사들의 고부가가치분야의 역량은 여전히 부족한 것으로 평가되고 있다. 이를 극복하기 위해 국토교통부는 해외 건설시장에 필요한 역량인 기획, 관리, 금융, 설계 등 고부가가치분야 역량을 갖춘 전문가 양성을 목적으로 '글로벌 건설 엔지니어링 고급인력 양성' 사업을 시작하였다. 이에 2014년 특성화 대학원 2곳(S대학교, C대학교)을 선정하여 인력양성을 사업을 수행하고 있다. 위 사업의 목적인 해외건설 시장에서 글로벌 경쟁력을 갖추고 질적으로 우수한 고부가가치분야 전문가를 양성하기 위해서, 지속적으로 교육프로그램의 만족도 분석이 실시되어야 한다. 본 논문에서는 중요도-만족도 분석(Importance Satisfaction Analysis, ISA)을 통하여 인력양성 프로그램 대상자들의 소요를 효과적으로 파악하고, 도출된 개선안을 통해 '글로벌 건설 엔지니어링 고급인력 양성 프로그램'의 만족도를 제고할 수 있을 것으로 기대된다. This study aims to give suggestions based on survey to improve the quality of Global Construction Engineer Training Program in line with the government goals. The domestic construction industry in Korea has kept shrinking, whereas the global construction market is forecasted to keep expanding in the future. It has become an urgent task to be taken up for construction contractors and engineering firms so as to improve their capacity, in particular, in the fields of planning, management, finance as well as engineering. To deal with the lack of capacity of the domestic engineers and to help them emerge as global players in the competitive overseas construction market, the Ministry of Land, Infrastructure and Transport of the Korean government has designed a program called 'Global Construction Engineer Training Program.' The eligible target of the training program is mid-career professionals who are working for the construction contractors or engineering firms. To draw suggestions for this program, an importance-satisfaction analysis is conducted to evaluate the effectiveness of the training program implemented by the S University. The S University, along with C University, was selected as an implementation organization of the program in 2014 by the government. Through an email survey, the participating students in the program were asked questions on the importance and satisfaction against 17 indicators classified into 5 categories: instruction method, professional knowledge of instructors, contents of program, curriculum, and facility and environment. The survey results show that students are satisfied with the overall quality of the program, but it was also found that they want the program opens more coursework on practical application of knowledge, case studies, and global networking.

      • 공동주택 소형평형 공사비 트렌트 분석

        박원영 ( Park Wonyoung ),차용운 ( Cha Yongwoon ),박태일 ( Park Taeil ) 한국건축시공학회 2021 한국건축시공학회 학술발표대회 논문집 Vol.21 No.1

        Increasing construction costs are required due to increasing the supply of small type houses with changes in multi-family housing trends. However, a sharp rise in the construction cost of small type houses can raise the sale price, threatening the stability of national housing. Therefore, this study aims to estimate the change in the construction cost of small type houses from the basic construction cost of the sale price ceiling system and suggest an improvement plan.

      • KCI등재

        국내 건설 재교육 현황 분석을 통한 개선방안

        박현,박인석,손명진,차용운,현창택,Park, Hyeon,Park, In-Seok,Son, Myung-Jin,Cha, Yongwoon,Hyun, Chang-Taek 한국건설관리학회 2016 한국건설관리학회 논문집 Vol.17 No.1

        In the past, the domestic construction industry mainly comprised quantitative investment through the supply of labor force, however, there have recently been opinions that there is a need for qualitative investment in the workers in order to obtain competitiveness in construction markets. Accordingly, there are much re-education courses for workers in the construction industry, but there is much negative awareness as to the efficiency of the current re-education course due to many problems. This study aimed to examine the problems o f currently executed re-education courses and proposed an improvement plan for the qualitative enhancement of domestic construction re-education. Thus, a multiple regression analysis was conducted to deduce two core problems an improvement plan. The improvement plan for the problems comprised the NCS/CDP-based integrative education program through an AHP. The contribution of this paper will result in the execution of a more effective construction industry re-education program, and the result of such program to achieve qualitative growth in the workers in the construction industry 과거 국내 건설산업은 인력의 양적인 투자가 주를 이루었지만, 최근 들어 건설시장에서 경쟁력 확보를 위하여 실무자를 대상으로 질적인 투자가 필요 하다는 의견이 제기되고 있다. 이를 위하여 다수의 건설업 실무자를 대상으로 재교육을 실시하고 있지만, 단기교육, 경력관리 부재 등의 문제로 인하여 현행 재교육의 효율성에 대한 부정적인 인식이 높은 실정이다. 이에 본 연구에서는 국내 건설 재교육의 질적인 향상을 위하여, 현재 수행되고 있는 재교육의 문제점을 도출하고 이에 대한 개선방안을 제안하였다. 이를 위하여 다중 회귀분석을 실시하였고, 2개의 핵심 문제점을 도출하였다. AHP 분석을 통해 도출된 문제점들에 대한 개선방안으로 'NCS/CDP 기반 통합교육프로그램 운영'을 제안하였다. 본 연구에서 제안한 개선방안 및 예시를 통하여 건설 재교육의 질적향상과 실무자들의 역량을 지속적으로 관리할 수 있는 체계를 구축할 수 있을 것으로 기대된다