http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
배재성(Jae-Sung Bae),김성완(Sung-One Kim),윤정은(Joung-Eun Youn),경남호(Nam-Ho Kyung) 한국유체기계학회 2004 유체기계 연구개발 발표회 논문집 Vol.- No.-
Test facilities for the wind turbine performance monitoring and mechanical load measurements are installed in Vestas 100 ㎾ wind turbine in Wollyong test site, Jeju island The monitoring system consists of Garrad-Hassan T-MON system, telemetry system for blade load measurement, various sensors such as anemometer, wind vane, strain gauge, power meter, and etc. The experimental procedure for the measurement of wind turbine loads, such as edgewise(lead-lag) bending moment, flapwise bending moment, and tower base bending moment, has been established. Strain gauges are on-site calibrated against load cell prior to monitoring the wind turbine loads. Using the established monitoring system, the wind turbine is remotely monitored. From the measured load data, the load analysis has been performed to obtain the load power spectral density and the fatigue load spectra of the wind turbine.