디지털변전소 네트워크 이중화를 위한 PRP/HSR 패킷 분석
송명훈(Myeong-Hoon Song),김석곤(Seok-Kon Kim),이창섭(Chang-Seob Lee),박유영(Yu-Yeong Park),김우중(Woo-Joong Kim),김남대(Nam-Dae Lee),장병태(Byung-Tae Jang),이남호(Nam-Ho Lee) 한국조명·전기설비학회 2021 한국조명·전기설비학회 학술대회논문집 Vol.2021 No.11
In this paper, We analysis HSR/PRP packet based on IEC 62439-3 Standard. IEC 62439-3 was adopted by IEC TC57 WG10 as the redundancy method for demanding substation automation networks operating on layer 2 networks, according to IEC 61850-8-1 and IEC 61850-9-2. SV(sampled value) for process bus based digital substation requires bumpless recovery time.
IEC 62439-3 기반 디지털 변전소 네트워크 이중화에 따른 시각동기 분석
송명훈(Myeong-Hoon Song),김석곤(Seok-Kon Kim),이창섭(Chang-Seob Lee),박유영(Yu-Yeong Park),김남대(Nam-Dae Kim),김우중(Woo-Joong Kim),장병태(Byung-Tae Jang),이남호(Nam-Ho Lee) 대한전기학회 2021 대한전기학회 학술대회 논문집 Vol.2021 No.10
This paper analyzes the time synchronization in digital substation network redundancy by IEC 62439-3. Synchronization of sampled values is very important in process bus-based digital substations. Therefore, when designing a digital substation, it is necessary to understand the characteristics of the redundant clock and satisfy the requirements by IEC 62439-3.
Process Bus 기반 디지털변전소의 Sampled Value 데이터 분석
송명훈(Myeong-Hoon Song),김석곤(Seok-Kon Kim),이창섭(Chang-Seob Lee),박유영(Yu-Yeong Park),김우중(Woo-Joong Kim),김남대(Nam-Dae Lee),장병태(Byung-Tae Jang),이남호(Nam-Ho Lee) 한국조명·전기설비학회 2021 한국조명·전기설비학회 학술대회논문집 Vol.2021 No.11
In this paper, We analysis SV(Sampled values) based on IEC 61850 9-2 Standard. Since the data and requirements set according to the document are different, it is necessary to understand IEC 61850 9-2 LE, 61869-9 related to SV. Accordingly, when designing a process bus-based digital substation system, it is desirable to identify the relevant standards so that interoperability problems do not occur.
시각동기 오차를 고려한 IEC 61850 기반 중앙집중형 전류차동식 22.9㎸ 모선보호에 관한 연구
송명훈(Myeong-Hoon Song),이남호(Nam-Ho Lee),남순열(Soon-Ryul Nam) 대한전기학회 2019 전기학회논문지 Vol.68 No.8
Data exchange are important for reliable operation of IEC 61850 based protections in power systems. In this paper, we demonstrate the acquisition of phasor data using GOOSE and SV and bus differential backup protection based on IEC 61850. Particularly, in IEC 61850 based 22.9kV bus differential backup protection, time synchronization errors among IEDs should be compensated because differential current errors due to time synchronization errors can result in mis-operation of the IED. On the other hand, to transmit GOOSE periodically, the statistical calculation model is needed to update data. In this paper, we propose a method for compensating time synchronization errors using Lagrange interpolation with reference voltages measured at each IED. The test result shows that the proposed method can reduce the differential current error significantly.