http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
The forecast of renewable generation cost in Korea
김길신(Kim, Kilsin),한유리(Han, Youri) 한국신재생에너지학회 2011 한국신재생에너지학회 학술대회논문집 Vol.2011 No.05
Korea's RPS, which requires that power generation companies obtain a minimum percentage of their generation by using renewable energy, will take effect in 2012. Based on the first-year law enforcement, generation companies have to satisfy 2% of RPS compliance ratio in 2012. Then, the required RPS compliance ratio will increase up to 10% in 2022. Thus generation companies need to construct power plants that utilize various types of renewable energy sources such as PV and wind power. This work is aimed to analyze the cost of such a renewable power source in terms of capital cost, capacity factor, and fuel cost. We provide the analytical expectation on the renewable power generation cost of 2012 focusing on PV, onshore/offshore wind, fuel cell, and IGCC, which are focused by government policy.
옥외 계측 및 감시 장치의 장기신뢰성 평가를 위한 가속인자 결정방법 연구
이병성,김길신,정종만,정연하,나상태 한국신뢰성학회 2014 한국신뢰성학회 학술대회논문집 Vol.2014 No.5
스마트 그리드에 따라 현장에 설치된 감시/제어장치의 역할이 중요하게 되었으며, 시스템 안정적 운전을 위해 장기신뢰성 또한 중요하다. 전력설비용 옥외 계측장치는 지상 또는 주상에 설치되어 있어, 주변 환경에 영향을 받아 사용상 장애가 나타나는 경우가 많다. 뇌서지 및 유도서지의 유입이나, 온도, 습도, 진동 등이 수명과 밀접한 관련성이 있다. 본 연구에서는 현장에서 이들 영향인자들이 감시/제어장치의 장기 신뢰성에 어느 정도 영향이 미치는가를 분석하였으며, 열화 특성을 단시간에 평가하기 위한 영향 인자들의 적정 스트레스 수준을 결정하고자 하였다. 또한, 이들 스트레스 인자를 복합적으로 적용할 수 있는 별도의 가속시험 방법을 제안하였다.
정영범(Young-Beom Jung),김길신(Kil-Sin Kim),박창호(Chang-Ho Park),윤용범(Yong-Beom Yoon) 한국조명·전기설비학회 2011 조명·전기설비학회논문지 Vol.25 No.10
Though Korea has introduced CBP(Cost Based pool) power trading system since 2001, long-term Generation system planning has been executed by government for Cost minimization every 2 years. Until currently the model which is used for Generation system planning and best-mix only considers cost minimization and total yearly or quarterly electricity demand every year. In a view point of one day power supply operation, technical characteristics, like the ramp up/down rate of total generation system, minimum up/down time and GFRQ(Governor Free Response Quantity), are very important. this paper analyzes Optimal Fuel-Mix for 2022 Korea generation system satisfying these constraints of each fuel type and considering pump storage plants, construction cost and CO2 emission charge Using MILP(Mixed Integer Linear Programming) method. Also the sensitivity analysis which follows in future power industry environmental change accomplished.