http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
김군회,허진혁,문승재,이재헌,Kim, Gun-Hoe,Hur, Jin-Huek,Moon, Seung-Jae,Lee, Jae-Heon 한국플랜트학회 2009 플랜트 저널 Vol.5 No.1
This study presents an operational technique to maximize the profit of a cogeneration power plant under cost-based pool power market. In benefit side energy sale profit, heat sale profit, and supplementary fund profit for electric power industry are included and the changeable cost was considered in cost side. The profit of a cogeneration power plant is varied enormously by the operation conditions, and constraint conditions. The result of this case study can be used as a reference to a cogeneration power plant under the same power trading system.