To make a basic plan for the facilities of wastewater treatment plant of Wonkwang University, the conclusions was as the following :
The results from the analysis of the characteristics of the wastewater areas follow: BOD 100mg/l: COD 70mg/l: Ss70mg/...
To make a basic plan for the facilities of wastewater treatment plant of Wonkwang University, the conclusions was as the following :
The results from the analysis of the characteristics of the wastewater areas follow: BOD 100mg/l: COD 70mg/l: Ss70mg/l: pH 6.8
We schematized and presented a contact stabilization system as a model wastewater treatment Plant after applying the value of design parameter presumed by the above mentioned wastewater.
The capacity of each tank showed us considerable change as the value of design parameter varied.
Consequently, when we practically carry out wastewater treatment plant, we will have to do so after we redetermine the capacity of each tank, applying the value of design parameter in accordance with the characteristics of the wastewater at that time.