RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      KCI등재 SCIE SCOPUS

      New Model for Predicting Instantaneous Cutting Rate of Axial-type Roadheaders

      한글로보기

      https://www.riss.kr/link?id=A103548804

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract)

      Roadheaders are mechanical excavators which have been extensively used in tunneling, mining and civil engineering works. Performance prediction of the roadheader is major factor in determining the economy of an underground excavation project. In this...

      Roadheaders are mechanical excavators which have been extensively used in tunneling, mining and civil engineering works.
      Performance prediction of the roadheader is major factor in determining the economy of an underground excavation project. In this study, a new model for predicting the Instantaneous Cutting Rate (ICR) has been developed. The performance of EBZ260W axialtype roadheader has been evaluated in the laboratory artificial rock cutting tests and in the tunneling field tests. Using the model, the processes of the artificial rock cutting in the laboratory tests have also been simulated. The predicted average ICRs in the laboratory tests, and in the simulations, together with the measured average ICRs in the laboratory tests and in the field tests are presented in this paper. The comparison of the predicted and measured ICRs shows that the relative error is within 5%. There are also reasonable agreements and strong correlations between the model and tests results. The new ICR prediction model is also supported by the empirical prediction formulas developed by other researchers. Hence, the model can be used to reliably predict the ICR for axial-type roadheaders.

      더보기

      참고문헌 (Reference)

      1 Zhang, M. Q., "Study on cutting head moving speed of mine roadheader determined based on pick tracing" 40 (40): 71-74, 2012

      2 Copur, H., "Studies on performance prediction of roadheaders" 4A1-4A7, 1997

      3 Copur, H., "Specific energy as a criterion for the use of rapid excavation systems in Turkish mines" 110 (110): 149-157, 2001

      4 N. Bilgin, "Some geological and geotechnical factors affecting the performance of a roadheader in an inclined tunnel" Elsevier BV 19 (19): 629-636, 2004

      5 Bilgin, N., "Roadheaders glean valuable tips for Istanbul Metro" 29-32, 1990

      6 Bilgin, N., "Roadheader performance in Istanbul, Golden Horn clean-up contributes valuable data" 41-44, 1988

      7 Copur, H., "Roadheader applications in mining and tunnelling" 50 (50): 38-42, 1998

      8 Ebrahimabadi, A., "Predictive models for roadheader's cutting performance in coal measure rocks" 32 (32): 89-104, 2011

      9 Arash Ebrahimabadi, "Prediction of roadheaders' performance using artificial neural network approaches (MLP and KOSFM)" Elsevier BV 7 (7): 573-583, 2015

      10 E. Avunduk, "Prediction of roadheader performance by artificial neural network" Elsevier BV 44 : 3-9, 2014

      1 Zhang, M. Q., "Study on cutting head moving speed of mine roadheader determined based on pick tracing" 40 (40): 71-74, 2012

      2 Copur, H., "Studies on performance prediction of roadheaders" 4A1-4A7, 1997

      3 Copur, H., "Specific energy as a criterion for the use of rapid excavation systems in Turkish mines" 110 (110): 149-157, 2001

      4 N. Bilgin, "Some geological and geotechnical factors affecting the performance of a roadheader in an inclined tunnel" Elsevier BV 19 (19): 629-636, 2004

      5 Bilgin, N., "Roadheaders glean valuable tips for Istanbul Metro" 29-32, 1990

      6 Bilgin, N., "Roadheader performance in Istanbul, Golden Horn clean-up contributes valuable data" 41-44, 1988

      7 Copur, H., "Roadheader applications in mining and tunnelling" 50 (50): 38-42, 1998

      8 Ebrahimabadi, A., "Predictive models for roadheader's cutting performance in coal measure rocks" 32 (32): 89-104, 2011

      9 Arash Ebrahimabadi, "Prediction of roadheaders' performance using artificial neural network approaches (MLP and KOSFM)" Elsevier BV 7 (7): 573-583, 2015

      10 E. Avunduk, "Prediction of roadheader performance by artificial neural network" Elsevier BV 44 : 3-9, 2014

      11 Fowell, R. J., "Prediction of boom tunnelling machine excavation rates" 1994 : 243-251, 1994

      12 Armin Salsani, "Predicting roadheader performance by using artificial neural network" Springer Nature 24 (24): 1823-1831, 2014

      13 Thuro, K., "Predicting roadheader advance rates: Geological challenges and geotechnical answers" 1241-1247, 2003

      14 Thuro, K., "Predicting roadheader advance rates" 31 : 36-39, 1999

      15 Rostami, J., "Performance prediction: A key issue in mechanical hard rock mining" 46 (46): 1263-1267, 1994

      16 Ramazan Comakli, "Performance prediction of roadheaders in metallic ore excavation" Elsevier BV 40 : 38-45, 2014

      17 Rostami, J., "Modeling for design and performance analysis of mechanical excavators" World Rock Boring Association 17-19, 1996

      18 Fowell, R. J., "Factors influencing the cutting performance of a selective tunnelling machine" 301-309, 1976

      19 D. Tumac, "Estimation of Rock Cuttability from Shore Hardness and Compressive Strength Properties" Springer Nature 40 (40): 477-490, 2007

      20 N. Bilgin, "Dominant rock properties affecting the performance of conical picks and the comparison of some experimental and theoretical results" Elsevier BV 43 (43): 139-156, 2006

      21 Bilgin, N., "Cutting performance of jack hammers and roadheaders in Istanbul Metro drivages" 455-460, 1997

      22 Roepke, W. W., "Coal cutting forces and primary dust generation using radial gage cutters" US Department of the Interior, Bureau of Mines 19-24, 1983

      23 Huang, R. H., "Boom type roadheader" Xuzhou: China University of Mining and Technology press 44-50, 1996

      24 Yazdani-Chamzini Abdolreza, "A new model to predict roadheader performance using rock mass properties" Springer Nature 19 (19): 51-56, 2013

      25 Ebrahimabadi, A., "A model to predict the performance of roadheaders based on rock mass brittleness index" 111 (111): 355-364, 2011

      26 Gehring, K. H., "A cutting comparison" Tunnels and Tunnelling 27-30, 1989

      27 Arash Ebrahimabadi, "A Universal Model to Predict Roadheaders’ Cutting Performance / Uniwersalny Model Do Prognozowania Postępu Prac Kombajnów Do Drążenia Tuneli" Walter de Gruyter GmbH 57 (57): 2012

      더보기

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      인용정보 인용지수 설명보기

      학술지 이력

      학술지 이력
      연월일 이력구분 이력상세 등재구분
      2023 평가예정 해외DB학술지평가 신청대상 (해외등재 학술지 평가)
      2020-01-01 평가 등재학술지 유지 (해외등재 학술지 평가) KCI등재
      2010-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2008-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2005-05-27 학술지명변경 한글명 : 대한토목학회 영문논문집 -> KSCE Journal of Civil Engineering KCI등재
      2005-01-01 평가 등재학술지 선정 (등재후보2차) KCI등재
      2004-01-01 평가 등재후보 1차 PASS (등재후보1차) KCI등재후보
      2002-01-01 평가 등재후보학술지 선정 (신규평가) KCI등재후보
      더보기

      학술지 인용정보

      학술지 인용정보
      기준연도 WOS-KCI 통합IF(2년) KCIF(2년) KCIF(3년)
      2016 0.59 0.12 0.49
      KCIF(4년) KCIF(5년) 중심성지수(3년) 즉시성지수
      0.42 0.39 0.286 0.06
      더보기

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼