1 Zhang, M. Q., "Study on cutting head moving speed of mine roadheader determined based on pick tracing" 40 (40): 71-74, 2012
2 Copur, H., "Studies on performance prediction of roadheaders" 4A1-4A7, 1997
3 Copur, H., "Specific energy as a criterion for the use of rapid excavation systems in Turkish mines" 110 (110): 149-157, 2001
4 N. Bilgin, "Some geological and geotechnical factors affecting the performance of a roadheader in an inclined tunnel" Elsevier BV 19 (19): 629-636, 2004
5 Bilgin, N., "Roadheaders glean valuable tips for Istanbul Metro" 29-32, 1990
6 Bilgin, N., "Roadheader performance in Istanbul, Golden Horn clean-up contributes valuable data" 41-44, 1988
7 Copur, H., "Roadheader applications in mining and tunnelling" 50 (50): 38-42, 1998
8 Ebrahimabadi, A., "Predictive models for roadheader's cutting performance in coal measure rocks" 32 (32): 89-104, 2011
9 Arash Ebrahimabadi, "Prediction of roadheaders' performance using artificial neural network approaches (MLP and KOSFM)" Elsevier BV 7 (7): 573-583, 2015
10 E. Avunduk, "Prediction of roadheader performance by artificial neural network" Elsevier BV 44 : 3-9, 2014
1 Zhang, M. Q., "Study on cutting head moving speed of mine roadheader determined based on pick tracing" 40 (40): 71-74, 2012
2 Copur, H., "Studies on performance prediction of roadheaders" 4A1-4A7, 1997
3 Copur, H., "Specific energy as a criterion for the use of rapid excavation systems in Turkish mines" 110 (110): 149-157, 2001
4 N. Bilgin, "Some geological and geotechnical factors affecting the performance of a roadheader in an inclined tunnel" Elsevier BV 19 (19): 629-636, 2004
5 Bilgin, N., "Roadheaders glean valuable tips for Istanbul Metro" 29-32, 1990
6 Bilgin, N., "Roadheader performance in Istanbul, Golden Horn clean-up contributes valuable data" 41-44, 1988
7 Copur, H., "Roadheader applications in mining and tunnelling" 50 (50): 38-42, 1998
8 Ebrahimabadi, A., "Predictive models for roadheader's cutting performance in coal measure rocks" 32 (32): 89-104, 2011
9 Arash Ebrahimabadi, "Prediction of roadheaders' performance using artificial neural network approaches (MLP and KOSFM)" Elsevier BV 7 (7): 573-583, 2015
10 E. Avunduk, "Prediction of roadheader performance by artificial neural network" Elsevier BV 44 : 3-9, 2014
11 Fowell, R. J., "Prediction of boom tunnelling machine excavation rates" 1994 : 243-251, 1994
12 Armin Salsani, "Predicting roadheader performance by using artificial neural network" Springer Nature 24 (24): 1823-1831, 2014
13 Thuro, K., "Predicting roadheader advance rates: Geological challenges and geotechnical answers" 1241-1247, 2003
14 Thuro, K., "Predicting roadheader advance rates" 31 : 36-39, 1999
15 Rostami, J., "Performance prediction: A key issue in mechanical hard rock mining" 46 (46): 1263-1267, 1994
16 Ramazan Comakli, "Performance prediction of roadheaders in metallic ore excavation" Elsevier BV 40 : 38-45, 2014
17 Rostami, J., "Modeling for design and performance analysis of mechanical excavators" World Rock Boring Association 17-19, 1996
18 Fowell, R. J., "Factors influencing the cutting performance of a selective tunnelling machine" 301-309, 1976
19 D. Tumac, "Estimation of Rock Cuttability from Shore Hardness and Compressive Strength Properties" Springer Nature 40 (40): 477-490, 2007
20 N. Bilgin, "Dominant rock properties affecting the performance of conical picks and the comparison of some experimental and theoretical results" Elsevier BV 43 (43): 139-156, 2006
21 Bilgin, N., "Cutting performance of jack hammers and roadheaders in Istanbul Metro drivages" 455-460, 1997
22 Roepke, W. W., "Coal cutting forces and primary dust generation using radial gage cutters" US Department of the Interior, Bureau of Mines 19-24, 1983
23 Huang, R. H., "Boom type roadheader" Xuzhou: China University of Mining and Technology press 44-50, 1996
24 Yazdani-Chamzini Abdolreza, "A new model to predict roadheader performance using rock mass properties" Springer Nature 19 (19): 51-56, 2013
25 Ebrahimabadi, A., "A model to predict the performance of roadheaders based on rock mass brittleness index" 111 (111): 355-364, 2011
26 Gehring, K. H., "A cutting comparison" Tunnels and Tunnelling 27-30, 1989
27 Arash Ebrahimabadi, "A Universal Model to Predict Roadheaders’ Cutting Performance / Uniwersalny Model Do Prognozowania Postępu Prac Kombajnów Do Drążenia Tuneli" Walter de Gruyter GmbH 57 (57): 2012