      Construction Schedule Delay Risk Assessment by Using Combined AHP-RII Methodology for International NPP Project

      한글로보기

      https://www.riss.kr/link?id=A104098479

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract)

      In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through liter...

      In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects.
      Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively.
      This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers.
      The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs

      더보기

      참고문헌 (Reference)

      1 E. Forman, "Theory and methodology aggregating individual judgments and priorities with the analytic hierarchy process" 108 : 165-169, 1998

      2 I.N. Kessides, "The future of the nuclear industry reconsidered: risks, uncertainties, and continued promise" 48 : 185-208, 2012

      3 A. Grubler, "The costs of the French nuclear scale-up: a case of negative learning by doing" 38 : 5174-5188, 2010

      4 R.J. Chapman, "The controlling influences on effective risk identification and assessment for construction design management" 19 : 147-160, 2001

      5 T.L. Saaty, "The Analytic Hierarchy Process- Panning, Priority Setting, Resource Allocation" McGraw-Hill 1980

      6 B. Srdjevic, "Synthesis of individual best local priority vectors in AHP-group decision making" 13 : 2045-2056, 2013

      7 Y.N. Alsuwehri, "Supplier Evaluation and Selection by Using The Analytic Hierarchy Process Approach, Engineering Management Field Project" University of Kansas 2011

      8 K.L. Ravisankar, "Study on the quantification of delay factors in construction industry" 4 : 105-113, 2014

      9 B.W. Boehm, "Software risk management: principles and practices" 8 : 32-41, 1991

      10 S. Aminbakhsh, "Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects" 46 : 99-105, 2013

      1 E. Forman, "Theory and methodology aggregating individual judgments and priorities with the analytic hierarchy process" 108 : 165-169, 1998

      2 I.N. Kessides, "The future of the nuclear industry reconsidered: risks, uncertainties, and continued promise" 48 : 185-208, 2012

      3 A. Grubler, "The costs of the French nuclear scale-up: a case of negative learning by doing" 38 : 5174-5188, 2010

      4 R.J. Chapman, "The controlling influences on effective risk identification and assessment for construction design management" 19 : 147-160, 2001

      5 T.L. Saaty, "The Analytic Hierarchy Process- Panning, Priority Setting, Resource Allocation" McGraw-Hill 1980

      6 B. Srdjevic, "Synthesis of individual best local priority vectors in AHP-group decision making" 13 : 2045-2056, 2013

      7 Y.N. Alsuwehri, "Supplier Evaluation and Selection by Using The Analytic Hierarchy Process Approach, Engineering Management Field Project" University of Kansas 2011

      8 K.L. Ravisankar, "Study on the quantification of delay factors in construction industry" 4 : 105-113, 2014

      9 B.W. Boehm, "Software risk management: principles and practices" 8 : 32-41, 1991

      10 S. Aminbakhsh, "Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects" 46 : 99-105, 2013

      11 A. Reza, "Risk assessment model selection in construction industry" 38 : 9105-9111, 2011

      12 "Risk Management e Vocabulary"

      13 M. Cooper, "Public Risk, Private Profit Ratepayer Cost, Utility Imprudence Advanced Cost Recovery for Reactor Construction Creates Another Nuclear Fiasco, Not a Renaissance" Institute for Energy and the Environment 2013

      14 M.A. Mustafa, "Project risk assessment using the analytic hierarchy process" 38 : 46-52, 1991

      15 D.F. Cooper, "Project Risk Management Guidelines: Managing Risk in Large Projects and Complex Procurements" John Wiley & Sons Ltd 2005

      16 International Atomic Energy Agency, "Project Management in Nuclear Power Plant Construction: Guidelines and Experience" 2012

      17 V.T. Luua, "Ogunlanad, Quantifying schedule risk in construction projects using Bayesian belief networks" 27 : 39-50, 2009

      18 A. Adamantiades, "Nuclear power for sustainable development: current status and future prospects" 37 : 5149-5166, 2009

      19 S.W. Kidd, "Nuclear Power e Economics and public acceptance" 1 : 277-281, 2013

      20 International Atomic Energy Agency, "Managing the First Nuclear Power Plant Project" 2007

      21 P. Elkington, "Managing project risks: a case study from the utilities sector" 20 : 49-57, 2002

      22 R. Mehdizadeh, "Dynamic and Multi-perspective Risk Management of Construction Projects Using Tailor-made Risk Breakdown Structures" Universite de Bordeux 2012

      23 Long Le-Hoai, "Delay and Cost Overruns in Vietnam Large Construction Projects: A Comparison with Other Selected Countries" 대한토목학회 12 (12): 367-377, 2008

      24 T.L. Saaty, "Decision making with the analytic hierarchy process" 1 : 83-98, 2008

      25 G. Harris, "Cost estimates for nuclear power in the UK" 62 : 431-442, 2013

      26 Y. Olawale, "Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice" 28 : 509-526, 2005

      27 J.M.L. Moreira, "Construction time of PWRs" 55 : 531-542, 2013

      28 C. Ramanathan, "Construction delays causing risks on time and cost- a critical review" 12 : 37-57, 2012

      29 KPMG International, "Construction Risk in New Nuclear Power Projects e Eyes Wide Open"

      30 S. Vyas, "Causes of delay in project construction in developing countries" 4 : 24-29, 2013

      31 S.A. Assaf, "Causes of delay in large construction projects" 24 : 349-357, 2006

      32 M. Sambasivan, "Causes and effects of delays in Malaysian construction industry" 25 : 517-526, 2007

      33 Project Business research group Aalto University Finland, "Case Olkiluoto 3 Nuclear Power Plant Project in Finland" 2010

      34 S.C. Ward, "Assessing and managing important Risks" 17 : 331-336, 1999

      35 M.M. Marzouk, "Analyzing delay causes in Egyptian construction projects" 5 : 49-55, 2014

      36 I. Ruuska, "A new governance approach for multi-firm projects: lessons from Olkiluoto 3 and Flamanville 3 nuclear power plant projects" 29 : 647-660, 2011

      37 Project Management Institute, "A Guide to the Project Management Body of Knowledge (PMBOK® Guide)"

      더보기

      동일학술지(권/호) 다른 논문

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      인용정보 인용지수 설명보기

      학술지 이력

      학술지 이력
      연월일 이력구분 이력상세 등재구분
      2023 평가예정 해외DB학술지평가 신청대상 (해외등재 학술지 평가)
      2020-01-01 평가 등재학술지 유지 (해외등재 학술지 평가) KCI등재
      2014-01-01 평가 SCIE 등재 (등재유지) KCI등재
      2014-01-01 평가 SCOPUS 등재 (등재유지) KCI등재
      2011-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2009-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2007-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2006-07-31 학술지명변경 한글명 : Jorunal of the Korean Nuclear Society -> Nuclear Engineering and Technology
      외국어명 : 미등록 -> Nuclear Engineering and Technology
      KCI등재후보
      2004-01-01 평가 등재후보학술지 선정 (신규평가) KCI등재후보
      2003-01-01 평가 등재후보 1차 PASS (등재후보1차) KCI등재후보
      2002-01-01 평가 등재후보학술지 유지 (등재후보1차) KCI등재후보
      1999-01-01 평가 등재후보학술지 선정 (신규평가) KCI등재후보
      더보기

      학술지 인용정보

      학술지 인용정보
      기준연도 WOS-KCI 통합IF(2년) KCIF(2년) KCIF(3년)
      2016 1.04 0.17 0.77
      KCIF(4년) KCIF(5년) 중심성지수(3년) 즉시성지수
      0.63 0.56 0.343 0.11
      더보기

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼