RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      KCI등재

      감전재해 예방을 위한 전기공사업의 특성에 관한 연구 = A Study on the Characteristic of Electrical Construction Work for Prevention of Electric Shock Accident

      한글로보기

      https://www.riss.kr/link?id=A100153772

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract)

      The live line working is inherently dangerous as the workers have to work under the risk of electrical shock and most of worksare carried out at height. The live line working need the some specific techniques and higher level safety measures such as a...

      The live line working is inherently dangerous as the workers have to work under the risk of electrical shock and most of worksare carried out at height. The live line working need the some specific techniques and higher level safety measures such as a riskassessment to carry out works safely, but the electrical construction companies performed live-line working are usually small-sizedcompanies. They have less capacity to have own safety management system. This study intended to conduct an in-depth analysis on thecause of electric shock accidents to provide basic data for policy proposing taking into considering the past eleven years for a long-termplan. And the aim of this study is to propose the policy about the equipment performance standards and/or worker``s safety standards torevise the standards for preventing electric shock accidents, moreover, co-relation of the electrical work order form and on safetyworkings, especially electrical construction company/work.

      더보기

      참고문헌 (Reference)

      1 최승동, "재해분석을 통한 배전선로 활선작업 공종별 위험지수 평가" 한국안전학회 26 (26): 8-14, 2011

      2 B. -H. Ryu, "The Development of KOSHA-ESAP(Electric Shock Analysis Program) and Electric Shock Protection Devices" Occupational Safety and Health Research Institute 5-35, 2007

      3 S. -W Choi, "Research on in-depth Analysis of Cause and Characteristic for Recent Electric Shock Accident" Occupational Safety and Health Research Institute 5-17, 2012

      4 S. -W. Choi, "Occurrence Characteristics of Resent Electric Shock Disaster" 11-, 2012

      5 S. -W. Choi, "Occurrence Characteristics of Recent Electric Shock Disaster-2" 43-, 2012

      6 B. -H. Ryu, "Enhancement of the Effectiveness for Electrical Regulation at Works-Focuss on Safety Standards Related Electrical Work-" Occupational Safety and Health Research Institute 13-24, 2009

      7 B. -H. Ryu, "Electric Shock Prevention Measures for Low Voltage Electrical Facilities" Occupational Safety and Health Research Institute 3-26, 2009

      8 S. -W. Choi, "Electric Shock Hazard Prevention During Summer by Analysis Electric Shock Accidents" 6 (6): 52-53, 2012

      9 S.- W. Lee, "Development of Risk Assessment Model for Live-line Works" Occupational Safety and Health Research Institute 8-34, 2010

      10 Ministry of Employment and Labor, "Analysis of Industrial Accidents" 2000

      1 최승동, "재해분석을 통한 배전선로 활선작업 공종별 위험지수 평가" 한국안전학회 26 (26): 8-14, 2011

      2 B. -H. Ryu, "The Development of KOSHA-ESAP(Electric Shock Analysis Program) and Electric Shock Protection Devices" Occupational Safety and Health Research Institute 5-35, 2007

      3 S. -W Choi, "Research on in-depth Analysis of Cause and Characteristic for Recent Electric Shock Accident" Occupational Safety and Health Research Institute 5-17, 2012

      4 S. -W. Choi, "Occurrence Characteristics of Resent Electric Shock Disaster" 11-, 2012

      5 S. -W. Choi, "Occurrence Characteristics of Recent Electric Shock Disaster-2" 43-, 2012

      6 B. -H. Ryu, "Enhancement of the Effectiveness for Electrical Regulation at Works-Focuss on Safety Standards Related Electrical Work-" Occupational Safety and Health Research Institute 13-24, 2009

      7 B. -H. Ryu, "Electric Shock Prevention Measures for Low Voltage Electrical Facilities" Occupational Safety and Health Research Institute 3-26, 2009

      8 S. -W. Choi, "Electric Shock Hazard Prevention During Summer by Analysis Electric Shock Accidents" 6 (6): 52-53, 2012

      9 S.- W. Lee, "Development of Risk Assessment Model for Live-line Works" Occupational Safety and Health Research Institute 8-34, 2010

      10 Ministry of Employment and Labor, "Analysis of Industrial Accidents" 2000

      더보기

      동일학술지(권/호) 다른 논문

      동일학술지 더보기

      더보기

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      인용정보 인용지수 설명보기

      학술지 이력

      학술지 이력
      연월일 이력구분 이력상세 등재구분
      2027 평가예정 재인증평가 신청대상 (재인증)
      2021-01-01 평가 등재학술지 유지 (재인증) KCI등재
      2018-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2015-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2011-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2009-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2007-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2005-10-26 학술지명변경 한글명 : 산업안전학회지 -> 한국안전학회지 KCI등재
      2005-02-28 학회명변경 한글명 : 한국산업안전학회 -> 한국안전학회
      영문명 : The Korean Institute Of Industrial Safety -> The Korean Society of Safety
      KCI등재
      2004-01-01 평가 등재학술지 선정 (등재후보2차) KCI등재
      2003-01-01 평가 등재후보 1차 PASS (등재후보1차) KCI등재후보
      2001-07-01 평가 등재후보학술지 선정 (신규평가) KCI등재후보
      더보기

      학술지 인용정보

      학술지 인용정보
      기준연도 WOS-KCI 통합IF(2년) KCIF(2년) KCIF(3년)
      2016 0.3 0.3 0.31
      KCIF(4년) KCIF(5년) 중심성지수(3년) 즉시성지수
      0.28 0.27 0.519 0.12
      더보기

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼