RISS 학술연구정보서비스

검색

인기 검색어

    다국어 입력

    http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

    변환된 중국어를 복사하여 사용하시면 됩니다.

    예시)
    • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
    • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
    닫기
    KCI등재후보

    격납건물 ILRT 본시험시간이 시험에 미치는 영향에 관한 연구 = A Study on the Effect of Integrated Leakage Rate Testing of Containment Vessel due to the Type A Testing Time

    한글로보기

    https://www.riss.kr/link?id=A102069862

    • 0

      상세조회
    • 0

      다운로드
    서지정보 열기
    • 내보내기
    • 내책장담기
    • 공유하기
    • 오류접수

    부가정보

    다국어 초록 (Multilingual Abstract) kakao i 다국어 번역

    The containment Integrated Leakage Rate Testing(ILRT) of nuclear power plants in Korea is performed in accordance with NSSC(Nuclear Safety and Security Commission) code 2012-16 and ANSI/ANS 56.8-1994. Nuclear power plants in Korea and the United States are to apply same test criteria, ANSI/ANS 56.8-1994, except type A testing time. NPPs in Korea apply 24 hours according to NSSC code 2012-16, but NPPs in United States apply 8 hours according to 10CFR50 App. J for type A test. So, there are many difficulties in order to perform ILRT in Korea. In this study, I review the impact on the ILRT results and the effect of ILRT due to type A testing time. The future, we will continue study to enhance the test reliability and improve these problems.
    번역하기

    The containment Integrated Leakage Rate Testing(ILRT) of nuclear power plants in Korea is performed in accordance with NSSC(Nuclear Safety and Security Commission) code 2012-16 and ANSI/ANS 56.8-1994. Nuclear power plants in Korea and the United State...

    The containment Integrated Leakage Rate Testing(ILRT) of nuclear power plants in Korea is performed in accordance with NSSC(Nuclear Safety and Security Commission) code 2012-16 and ANSI/ANS 56.8-1994. Nuclear power plants in Korea and the United States are to apply same test criteria, ANSI/ANS 56.8-1994, except type A testing time. NPPs in Korea apply 24 hours according to NSSC code 2012-16, but NPPs in United States apply 8 hours according to 10CFR50 App. J for type A test. So, there are many difficulties in order to perform ILRT in Korea. In this study, I review the impact on the ILRT results and the effect of ILRT due to type A testing time. The future, we will continue study to enhance the test reliability and improve these problems.

    더보기

    동일학술지(권/호) 다른 논문

    분석정보

    View

    상세정보조회

    0

    Usage

    원문다운로드

    0

    대출신청

    0

    복사신청

    0

    EDDS신청

    0

    동일 주제 내 활용도 TOP

    더보기

    주제

    연도별 연구동향

    연도별 활용동향

    연관논문

    연구자 네트워크맵

    공동연구자 (7)

    유사연구자 (20) 활용도상위20명

    이 자료와 함께 이용한 RISS 자료

    나만을 위한 추천자료

    해외이동버튼