1 장수호, "디스크 커터를 장착한 TBM 커터헤드의 최적 설계모델 도출을 위한 영향인자 분석" 대한토목학회 27 (27): 87-98, 2007
2 Hughes, H. M., "The relative cuttability of coal-measures stone" 3 (3): 95-109, 1986
3 Mallows, C. L., "Some comments on Cp" 15 (15): 661-675, 1973
4 Hoerl, A. E., "Ridge regression: Biased estimation for nonorthogonal problems" 12 (12): 55-67, 1970
5 Sanner, M. F., "Python: a programming language for software integration and development" 17 (17): 57-61, 1999
6 Hamidi, J. K., "Performance prediction of hard rok TBM using Rock Mass Rating system" 25 (25): 333-345, 2010
7 Cousineau, D., "Outliers detection and treatment: a review" 3 (3): 58-67, 2010
8 Hamilton, W. H., "Optimizing tunnel boring machine and cutter design for greater boreability" 1 : 280-296, 1979
9 Farmer, I. W., "Mechanics of disc cutter penetration" 12 (12): 22-25, 1980
10 Gong, Q. M., "In situ TBM penetration tests and rock mass boreability analysis in hard rock tunnels" 22 (22): 303-316, 2007
1 장수호, "디스크 커터를 장착한 TBM 커터헤드의 최적 설계모델 도출을 위한 영향인자 분석" 대한토목학회 27 (27): 87-98, 2007
2 Hughes, H. M., "The relative cuttability of coal-measures stone" 3 (3): 95-109, 1986
3 Mallows, C. L., "Some comments on Cp" 15 (15): 661-675, 1973
4 Hoerl, A. E., "Ridge regression: Biased estimation for nonorthogonal problems" 12 (12): 55-67, 1970
5 Sanner, M. F., "Python: a programming language for software integration and development" 17 (17): 57-61, 1999
6 Hamidi, J. K., "Performance prediction of hard rok TBM using Rock Mass Rating system" 25 (25): 333-345, 2010
7 Cousineau, D., "Outliers detection and treatment: a review" 3 (3): 58-67, 2010
8 Hamilton, W. H., "Optimizing tunnel boring machine and cutter design for greater boreability" 1 : 280-296, 1979
9 Farmer, I. W., "Mechanics of disc cutter penetration" 12 (12): 22-25, 1980
10 Gong, Q. M., "In situ TBM penetration tests and rock mass boreability analysis in hard rock tunnels" 22 (22): 303-316, 2007
11 Rahmatullah Imon, A. H. M., "Identifying multiple influential observations in linear regression" 32 (32): 929-946, 2005
12 Bruland, A., "Hard rock tunnel boring: Advance Rate and Cutter Wear" Norwegian University of Science and Technology (NTNU) 1998
13 Welsch, R. E., "Evaluation of Econometric Models" Academic Press 153-167, 1980
14 Bieniawski, Z. T., "Engineering classification of jointed rock masses" 15 (15): 335-343, 1973
15 Gong, Q. M., "Development of a rock mass characteristics model for TBM penetration rate prediction" 46 (46): 8-18, 2009
16 Hassanpour, J., "Developing new equations for TBM performance prediction in carbonateargillaceous rocks: a case history of Nowsood Water conveyance tunnel" 4 (4): 287-297, 2009
17 Myers, R. H., "Classical and Modern Regression with Applications" PWS-KENT Publishing Company 222-227, 1990
18 Delisio, A., "Analysis and prediction of TBM performance in blocky rock conditions at the Lötschberg Base Tunnel" 33 : 131-142, 2013
19 James, G., "An Introduction to Statistical Learning: With Applications in R" Springer 205-227, 2013
20 Mahdevari, S., "A support vector regression model for predicting tunnel boring machine penetration rates" 72 : 214-229, 2014
21 Akaike, H., "A new look at the statistical model identification" 19 (19): 716-723, 1974
22 Chae, J. S., "A calculation of shield TBM advance rate in the shield tunnel" 9 (9): 35-41, 2005