1 배상윤, "중소기업 정보화의 실제적 목표와 접근" 한국산업경영시스템학회 28 (28): 41-47, 2005
2 황덕형, "변합기 공정 개선을 위한 APS(Advanced Planning & Scheduling) 프로세스 설계에 관한 연구" 대한안전경영과학회 14 (14): 159-166, 2012
3 하정훈, "계층적분석기법을 이용한 APS 개선방안 도출" 한국산업경영시스템학회 34 (34): 123-133, 2011
4 Musselman, K. J., "The Role of Simulation in Advanced Planning and Scheduling" 2 : 1825-1830, 2002
5 Lee, S. B., "The Implementation of Scheduling System Under MTO(make to order)Production System" 15 (15): 424-429, 2004
6 Cho, H.J., "The Application of APS(Advanced Planning and Scheduling) based on DBR(Drum-Buffer-Rope) in SCM Environment" 83-91, 2004
7 Ji, Y. J., "TOC/JIT/MRPintegration model for flexible production scheduling under dynamic manufacturing environment" Inje University 2004
8 Yoo, H. J., "SyncPlant APS Overview" 10 : 330-341, 2010
9 Steinaecker, J.V., "Supply Chain Management-Revolution oder Modewort?" The Publisher Vieweg+Teubner Verlag 2001
10 노경호, "SCM 첨단계획수립시스템의 구조와 도입효과 분석: 포스코 사례를 중심으로" 한국디지털정책학회 12 (12): 145-155, 2014
1 배상윤, "중소기업 정보화의 실제적 목표와 접근" 한국산업경영시스템학회 28 (28): 41-47, 2005
2 황덕형, "변합기 공정 개선을 위한 APS(Advanced Planning & Scheduling) 프로세스 설계에 관한 연구" 대한안전경영과학회 14 (14): 159-166, 2012
3 하정훈, "계층적분석기법을 이용한 APS 개선방안 도출" 한국산업경영시스템학회 34 (34): 123-133, 2011
4 Musselman, K. J., "The Role of Simulation in Advanced Planning and Scheduling" 2 : 1825-1830, 2002
5 Lee, S. B., "The Implementation of Scheduling System Under MTO(make to order)Production System" 15 (15): 424-429, 2004
6 Cho, H.J., "The Application of APS(Advanced Planning and Scheduling) based on DBR(Drum-Buffer-Rope) in SCM Environment" 83-91, 2004
7 Ji, Y. J., "TOC/JIT/MRPintegration model for flexible production scheduling under dynamic manufacturing environment" Inje University 2004
8 Yoo, H. J., "SyncPlant APS Overview" 10 : 330-341, 2010
9 Steinaecker, J.V., "Supply Chain Management-Revolution oder Modewort?" The Publisher Vieweg+Teubner Verlag 2001
10 노경호, "SCM 첨단계획수립시스템의 구조와 도입효과 분석: 포스코 사례를 중심으로" 한국디지털정책학회 12 (12): 145-155, 2014
11 Ha, G. R., "Minimizing Total Tardiness in a Two Stage Assembly-type Flow Shop Scheduling Problem" 19 (19): 683-689, 2007
12 배상윤, "Job Shop 일정계획의 성능 향상을 위한 할당규칙의 정보" 한국산업경영시스템학회 29 (29): 107-112, 2006
13 Kung, L., "Heuristic Factory Planning Algorithm for Advanced Planning and Scheduling" 36 (36): 2513-2253, 2009
14 Shin, M. S., "Development of Dispatching Rule-based Production Scheduler for Small and Medium Sized Manufacturing Company" 10 : 335-335, 2013
15 Park, M. W., "An Order Promising Procedure for Simulation-based Scheduling Systems" 14 (14): 103-108, 2002
16 Kang, Y. S., "Advanced Planning System : A Prerequisite for Achieving Build-to-Order Environment" 10 : 93-96, 2002
17 Kang, S. R., "APS Concept and Applications" 22 (22): 61-75, 2010
18 Joo, C. M., "A Study on the Development of an APS System for Job Shops" 16 (16): 64-66, 2004
19 Cha, D. J., "A Study on Implementation of ERP, MES and APS Solution-purposed to Present a Selection Guide for Production Control Solution" Korea National Open University 2007
20 Na, H. B., "A Study on Developing Scheduling Software According to Industrial Characteristics" 6 : 917-918, 2008
21 Jung, N. K., "A Study of APS System Design based on the TOC DBR" 13 (13): 490-493, 2001