RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      KCI등재

      작업순서 및 기계 의존적인 준비시간을 고려한 제약이 주어진 이종병렬기계의 일정계획에 관한 연구 = Scheduling of Restricted Non-identical Parallel Machine with Sequence and Machine Dependent Setup Times

      한글로보기

      https://www.riss.kr/link?id=A99554142

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract)

      This paper considers a restricted non-identical parallel machine scheduling problem with sequence and machine dependent setup times. The objective of this problem is to determine the allocation of jobs and the scheduling of machines to minimize the ma...

      This paper considers a restricted non-identical parallel machine scheduling problem with sequence and machine dependent setup times. The objective of this problem is to determine the allocation of jobs and the scheduling of machines to minimize the makespan. A mathematical model for optimal solution is derived. An in-depth analysis of the model shows that it is very complicated and difficult to obtain optimal solutions as the problem size becomes large. Therefore, two meta-heuristic algorithms based on ant colony system and genetic algorithm are proposed. The performance of the proposed algorithms are evaluated using randomly generated several examples.

      더보기

      참고문헌 (Reference)

      1 주철민, "작업투입시점과 순서의존적인 준비시간이 존재하는 병렬기계 일정계획을 위한 개선 개미군집 시스템" 대한산업공학회 35 (35): 218-225, 2009

      2 Hop, N. V, "The scheduling problem of PCBs for multiple non-identical parallel machines" 158 : 577-594, 2004

      3 Bobrowski, P. M, "The impact of sequence dependent setup time on job shop scheduling performance" 32 : 1503-1520, 1994

      4 Flynn,B.B, "The effects of setup time on output capacity in cellular manufacturing" 25 : 1761-1772, 1987

      5 Dorigo, M., "The Ant System:Optimization by a Colony of Cooperating Agents" 26 : 29-41, 1996

      6 Dorigo, M, "The Ant Colony Optimization Meta-heuristic, New Ideas in Optimization" McGraw-Hill 1999

      7 Pinedo,M, "Scheduling theory, algorithms, and systems" Prentice-Hall 1995

      8 Behnamian, J, "Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm" 36 : 9637-9644, 2009

      9 Balin,S, "Non-identical parallel machine scheduling using genetic algorithm" 38 : 6814-6821, 2011

      10 Hahn, C. K., "Impact of the setup variable on capacity and inventory decisions" 13 : 91-103, 1989

      1 주철민, "작업투입시점과 순서의존적인 준비시간이 존재하는 병렬기계 일정계획을 위한 개선 개미군집 시스템" 대한산업공학회 35 (35): 218-225, 2009

      2 Hop, N. V, "The scheduling problem of PCBs for multiple non-identical parallel machines" 158 : 577-594, 2004

      3 Bobrowski, P. M, "The impact of sequence dependent setup time on job shop scheduling performance" 32 : 1503-1520, 1994

      4 Flynn,B.B, "The effects of setup time on output capacity in cellular manufacturing" 25 : 1761-1772, 1987

      5 Dorigo, M., "The Ant System:Optimization by a Colony of Cooperating Agents" 26 : 29-41, 1996

      6 Dorigo, M, "The Ant Colony Optimization Meta-heuristic, New Ideas in Optimization" McGraw-Hill 1999

      7 Pinedo,M, "Scheduling theory, algorithms, and systems" Prentice-Hall 1995

      8 Behnamian, J, "Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm" 36 : 9637-9644, 2009

      9 Balin,S, "Non-identical parallel machine scheduling using genetic algorithm" 38 : 6814-6821, 2011

      10 Hahn, C. K., "Impact of the setup variable on capacity and inventory decisions" 13 : 91-103, 1989

      11 Agarwal, A, "Heuristics and augmented neural networks for task scheduling with non-identical machines" 175 (175): 296-317, 2006

      12 Gen, M, "Genetic Algorithms and Engineering Optimization" Wiley 2000

      13 Tavakkoli-Moghaddam, R, "Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints" 36 : 3224-3230, 2009

      14 Mendes, A. S, "Comparing metaheuristic approaches for parallel machine scheduling problems" 13 : 143-154, 2002

      15 Frederickson, G., "Approximation algorithm for some routing problems" 7 : 178-193, 1978

      16 Dorigo, M, "Ant colony optimization theory:A survey" 344 : 243-278, 2005

      17 Dorigo, M., "Ant Colony Optimization : Artificial Ants as a Computational Intelligence Technique" University Libre De Bruxelles 2006

      18 Yalaoui, F, "An efficient heuristic approach for parallel machine scheduling with job splitting and sequence-dependent setup times" 35 (35): 183-190, 2003

      19 Holland,J.H, "Adaptation in natural and artificial systems" University of Michigan Press 1975

      20 Allahverdi, A., "A survey of scheduling problems with setup times and costs" 187 : 985-1032, 2008

      21 Nait, T. D., "A new approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times based on linear programming" 3 : 266-274, 2003

      22 Sveltana, A., "A heuristic algorithm for minimizing mean flow time with unit setups" 79 : 291-296, 2001

      23 Vallada,E.and Ruiz,R, "A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times" 211 : 612-622, 2011

      24 Gharehgozli, A. H, "A fuzzy-mixed -integer goal programming mode for a parallel-machine scheduling problem with sequence-dependent setup times and release dates" 25 : 853-859, 2009

      더보기

      동일학술지(권/호) 다른 논문

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      인용정보 인용지수 설명보기

      학술지 이력

      학술지 이력
      연월일 이력구분 이력상세 등재구분
      2026 평가예정 재인증평가 신청대상 (재인증)
      2020-01-01 평가 등재학술지 유지 (재인증) KCI등재
      2017-01-01 평가 등재학술지 유지 (계속평가) KCI등재
      2013-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2010-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2008-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2006-08-11 학술지명변경 한글명 : 한국보전경영학회지 -> 한국경영공학회지 KCI등재
      2006-07-21 학회명변경 한글명 : 한국보전경영학회 -> 한국경영공학회
      영문명 : 미등록 -> Korea Management Engineers Society
      KCI등재
      2005-03-22 학술지등록 한글명 : 한국보전경영학회지
      외국어명 : 미등록
      KCI등재
      2005-01-01 평가 등재학술지 선정 (등재후보2차) KCI등재
      2004-01-01 평가 등재후보 1차 PASS (등재후보1차) KCI등재후보
      2002-07-01 평가 등재후보학술지 선정 (신규평가) KCI등재후보
      더보기

      학술지 인용정보

      학술지 인용정보
      기준연도 WOS-KCI 통합IF(2년) KCIF(2년) KCIF(3년)
      2016 0.62 0.62 0.62
      KCIF(4년) KCIF(5년) 중심성지수(3년) 즉시성지수
      0.57 0.48 0.749 0.23
      더보기

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼