1 Jelcz,
2 Volvo,
3 Dytczak, M., "Wybrane metody rozwiązywania wielokryterialnych problemów decyzyjnych w budownictwie" 2010
4 Wolny, M., "Wspomaganie decyzji kierowniczych w przedsiebiorstwie przemyslowym. Wieloatrybutowe wspomaganie organizacji przestrzennej komorek produkcyjnych z zastosowaniem teorii gier" Publishing House of Silesian University of Technology 2007
5 Kaplinski, O., "Three phases of multifactor modelling of construction processes" 12 (12): 127-134, 2006
6 Duchaczek, A., "The method of optimization of the choice of means of transport;Wybrane problemy budownictwa" Publishing House of University of Technology and Life Sciences 119-126, 2015
7 Polonski, M., "The analysis of the reliability of realization cost and investments, time-limits in Warsow" 9 (9): 2006
8 Tamura, H., "Stochastic DEMATEL for structural modelling of a complex probelmatique for realizing safe, secure and reliable society" 4 : 139-146, 2005
9 Stanag, "Stanag 2021. Military Load Classification of Bridges. Edition no. 6"
10 Guo, W., "Risk evaluation of highway tunnel construction based on DEMATEL method" 368 : 1472-1476, 2013
1 Jelcz,
2 Volvo,
3 Dytczak, M., "Wybrane metody rozwiązywania wielokryterialnych problemów decyzyjnych w budownictwie" 2010
4 Wolny, M., "Wspomaganie decyzji kierowniczych w przedsiebiorstwie przemyslowym. Wieloatrybutowe wspomaganie organizacji przestrzennej komorek produkcyjnych z zastosowaniem teorii gier" Publishing House of Silesian University of Technology 2007
5 Kaplinski, O., "Three phases of multifactor modelling of construction processes" 12 (12): 127-134, 2006
6 Duchaczek, A., "The method of optimization of the choice of means of transport;Wybrane problemy budownictwa" Publishing House of University of Technology and Life Sciences 119-126, 2015
7 Polonski, M., "The analysis of the reliability of realization cost and investments, time-limits in Warsow" 9 (9): 2006
8 Tamura, H., "Stochastic DEMATEL for structural modelling of a complex probelmatique for realizing safe, secure and reliable society" 4 : 139-146, 2005
9 Stanag, "Stanag 2021. Military Load Classification of Bridges. Edition no. 6"
10 Guo, W., "Risk evaluation of highway tunnel construction based on DEMATEL method" 368 : 1472-1476, 2013
11 Junker U., "Preference-based search and multi-criteria optimization" 130 (130): 75-115, 2004
12 Plebankiewicz, E., "Overhead costs and profit calculation by Polish contractors" 19 (19): 141-161, 2013
13 Duchaczek, A., "Optimization of the selection of trucks used in construction Projects" 65 : 5-18, 2015
14 Skorupka, D., "Optimization of selection the transport means in storage depots logistics of building materials" 4 : 137-145, 2012
15 Dytczak, M., "Ocena czynnikow ksztaltujących jakosc wod zbiornika zaporowego z wykorzystaniem metody DEMATEL"
16 Steuer, R. E., "Multiple criteria optimization: Theory, computation, and application" Krieger 1989
17 Belton, V., "Multiple criteria decision analysis: An integrated approach" Springer 2002
18 Turskis, Z., "Multi-criteria optimization system for decision making in construction design and management" 1 (1): 7-18, 2009
19 Duchaczek, A., "Multi-Criteria Optimization of the Selection of Transportations Means" 1077-1082, 2016
20 Marszalek, J., "Mosty skladane. Projektowanie, budowa i eksploatacja" Publishing House of General Directorate for National Roads and Motorways 2005
21 Saaty, T. L., "Models, Methods, Concepts and Applications of the Analytic Hierarchy Process" Kluwer Academic Publishing 2001
22 Chang, B., "Fuzzy DEMATEL method for developing supplier selection criteria" 38 (38): 1850-1858, 2011
23 Duchaczek, A., "Evaluation of the Decision Maker's Preferences in the Selection Means of Transport" 14 (14): 25-31, 2015
24 Chang, K. H., "Evaluating the risk of failure using the fuzzy OWA and DEMATEL method" 22 (22): 113-129, 2011
25 Gorny, P., "Elementy analizy decyzyjnej" Publishing House of National Defence Academy 2004
26 Dytczak, M., "DEMATEL-based Multi-criteria evaluation of public transportation systems for cracow" 2 : 241-246, 2011
27 Kasprowicz, T., "Cost-time scheduling of construction works execution" 660 (660): 2000
28 Duchaczek, A., "Bridge damage risk assessment" 3 (3): 99-109, 2013
29 Dytczak, M., "Application potential of DEMATEL method and its extensions for analysis of decision problems in civil engineering" 2 : 235-240, 2011
30 Duchaczek, A., "Application of modified Bellinger's method for optimization of the choice of means of transport" 13 (13): 351-356, 2014
31 Sobotka, A., "Analysis of supply system models for planning construction project logistics" 11 (11): 73-82, 2005
32 Dytczak, M., "Analiza zwiazkow przyczynowo-skutkowych w awarii konstrukcji przy uzyciu metody DEMATEL" 419-426, 2011
33 Lin, C. L., "A value-created system of science (technology) park by using DEMATEL" 36 (36): 9683-9697, 2009
34 Kunjur, A., "A robust multi-criteria optimization approach" 32 (32): 797-810, 1997