1 E.B.Shim, "The prevention of simultaneous trip on the 154 kV double circuit transmission line by lightning" 2004.
2 Commonwelth Associate Inc, "Planning and design studies for 345 kV transmission system of Korea electric company" 1969-, ppv-2
3 K. Ishida et al, "Development of a 500 kV transmission line arrester and its characteristics" 7 (7): 1992-, pp.1265-1274
4 T. Gawamura. et al, "Development of Metal-Oxide transmission line arrester and its effectiveness" -201, 1994
5 KEPCO, "Design standard for insulation coordination of Korea electric power corporation" 2001.
6 KEPCO, "Design standard for grounding of 154 kV of Korea electric power corporation" 2001.
7 C.H.Shih,et al, "Application of special surge arresters on 138 kV lines of appalachian power company" no.10 : 1985
8 KEPRI, "A study for establishment of specification of 345kV and 154kV Gapless surge arrester" 2000
9 KEPRI, "A Insulation coordination study of 765 kV transmission system" 1995
1 E.B.Shim, "The prevention of simultaneous trip on the 154 kV double circuit transmission line by lightning" 2004.
2 Commonwelth Associate Inc, "Planning and design studies for 345 kV transmission system of Korea electric company" 1969-, ppv-2
3 K. Ishida et al, "Development of a 500 kV transmission line arrester and its characteristics" 7 (7): 1992-, pp.1265-1274
4 T. Gawamura. et al, "Development of Metal-Oxide transmission line arrester and its effectiveness" -201, 1994
5 KEPCO, "Design standard for insulation coordination of Korea electric power corporation" 2001.
6 KEPCO, "Design standard for grounding of 154 kV of Korea electric power corporation" 2001.
7 C.H.Shih,et al, "Application of special surge arresters on 138 kV lines of appalachian power company" no.10 : 1985
8 KEPRI, "A study for establishment of specification of 345kV and 154kV Gapless surge arrester" 2000
9 KEPRI, "A Insulation coordination study of 765 kV transmission system" 1995