Based on the Renewable Energy 3020 Enforcement Plan, South Korea announced a renewable energy-centered energy conversion policy to expand the ratio of renewable energy power generation to 20% by 2018, and as part of the policy, 17.7 GW (at sea) 12GW) ...
Based on the Renewable Energy 3020 Enforcement Plan, South Korea announced a renewable energy-centered energy conversion policy to expand the ratio of renewable energy power generation to 20% by 2018, and as part of the policy, 17.7 GW (at sea) 12GW) Announced in "30 as part of the policy. + 5.7GW) Pursuing a scale power supply. The offshore wind power generation business needs to be delayed or near the coast due to the structure of travel-oriented location development, difficulty in securing residents, disapproval / permission of the complaint city, and access capacity restrictions by personnel. Therefore, in order to solve the problems in this paper, it is necessary to construct a large-scale joint connection facility instead of the simultaneous connection method when connecting to a large number of offshore wind power generations. Not the way. A common access facility construction plan is required based on the facility construction plan required. We will present the direction of environmental analysis at the time of selection.