1 Daganzo, C.F., "the crane scheduling problem" 23 (23): 159-175, 1989
2 Pritsker, A.A.B, "Simulation with Visual SLAM and AweSim" John Wiley & Sons, Inc 1999
3 Lee, D.H., "Quay crane scheduling with non‐interference constraints in port container terminals" 44 : 124-135, 2008
4 Zhang, H, "Maximizing the number of dual‐cycle operations of quay cranes in container terminals" 56 : 979-992, 2009
5 Crainic, T.G., "Intermodal Transportation: Handbooks in Operations Research and Management Science" North‐Holland 2007
6 Meisel, F., "Heuristics for the integration of crane productivity in the berth allocation problem" 45 (45): 196-209, 2009
7 Goodchild, A.V., "Double cycling strategies for container ships and their effect on ship loading and unloading operations" 40 (40): 473-783, 2006
8 High productivity dock operations, "DOC/# PND‐BST‐1001" Paceco Corp 2005
9 Lim, A., "Crane scheduling with spatial constraints" 52 : 386-406, 2004
10 Goodchild, A.V., "Crane double cycling in container ports: planning methods and evaluation" 41 : 875-891, 2007
1 Daganzo, C.F., "the crane scheduling problem" 23 (23): 159-175, 1989
2 Pritsker, A.A.B, "Simulation with Visual SLAM and AweSim" John Wiley & Sons, Inc 1999
3 Lee, D.H., "Quay crane scheduling with non‐interference constraints in port container terminals" 44 : 124-135, 2008
4 Zhang, H, "Maximizing the number of dual‐cycle operations of quay cranes in container terminals" 56 : 979-992, 2009
5 Crainic, T.G., "Intermodal Transportation: Handbooks in Operations Research and Management Science" North‐Holland 2007
6 Meisel, F., "Heuristics for the integration of crane productivity in the berth allocation problem" 45 (45): 196-209, 2009
7 Goodchild, A.V., "Double cycling strategies for container ships and their effect on ship loading and unloading operations" 40 (40): 473-783, 2006
8 High productivity dock operations, "DOC/# PND‐BST‐1001" Paceco Corp 2005
9 Lim, A., "Crane scheduling with spatial constraints" 52 : 386-406, 2004
10 Goodchild, A.V., "Crane double cycling in container ports: planning methods and evaluation" 41 : 875-891, 2007
11 Tavakkoli‐Moghaddam, R., "An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports" 56 (56): 241-248, 2009
12 Koo, P.H., "A vehicle dispatching for dynamic freight transportation in container terminals" 33 (33): 67-80, 2005
13 Kim, K.H., "A crane scheduling method for port container terminals" 156 : 752-768, 2004
14 Peterkofsky, R.I., "A branch bound solution method for the crane scheduling problem" 24 (24): 159-172, 1990
15 Kim. K.H., "A beam search algorithm for the load sequencing of outbound containers in port container terminals" 26 (26): 93-116, 2004