1 한승헌, "대형 건설사업의 공기지연분석 : 경부고속철도 건설사업을 중심으로" 대한토목학회 26 (26): 839-848, 2006
2 Cho, GC, "Tunnel excavation methods suitable for reduction of construction period" 60 (60): 30-39, 2012
3 No, SL., "Construction of long and large twin tube tunnel in Korea - Sapaesan tunnel" 21 (21): 393-, 2006
4 Mehdizadeh, R., "Advanced methodology of risk breakdown structure developing for risk management of tunneling and construction projects" 2011
5 Chan, DWM., "A comparative study of causes of time overruns in Hong Kong construction projects" 15 (15): 55-63, 1997
1 한승헌, "대형 건설사업의 공기지연분석 : 경부고속철도 건설사업을 중심으로" 대한토목학회 26 (26): 839-848, 2006
2 Cho, GC, "Tunnel excavation methods suitable for reduction of construction period" 60 (60): 30-39, 2012
3 No, SL., "Construction of long and large twin tube tunnel in Korea - Sapaesan tunnel" 21 (21): 393-, 2006
4 Mehdizadeh, R., "Advanced methodology of risk breakdown structure developing for risk management of tunneling and construction projects" 2011
5 Chan, DWM., "A comparative study of causes of time overruns in Hong Kong construction projects" 15 (15): 55-63, 1997