The National hot-water locomotive boiler washing and filling system was installed and placed in operation at the Bellefontaine roundhouse in December, 1909...
http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
https://www.riss.kr/link?id=O131626194
1910년
eng
학술저널
PHP / Trade Journals / Feature
0
상세조회0
다운로드다국어 초록 (Multilingual Abstract)
The National hot-water locomotive boiler washing and filling system was installed and placed in operation at the Bellefontaine roundhouse in December, 1909...
The National hot-water locomotive boiler washing and filling system was installed and placed in operation at the Bellefontaine roundhouse in December, 1909. It is equipped with two Dean duplex pumps 12x8 x12 in.; the capacity of the filling pump is 500 gallons per minute; the washout pump will wash three boilers at a time with a pressure of 90 lbs. The filling storage tank has a capacity of 12,000 gallons, and the washout tank a capacity of 85,000 gallons.