1 신윤석, "초고층 건축공사를 위한 건설 리프트 양중계획 시스템 개발" 대한건축학회 27 (27): 227-235, 2011
2 김상원, "시공자재의 이동방법을 중심으로 한 양중공정 특성 분류에 관한 연구" 대한건축학회지회연합회 12 (12): 199-206, 2010
3 이정호, "스마트 폰을 활용한 타워크레인 양중 및 자재 관리 프로세스 효율화 방안" 대한건축학회 28 (28): 141-150, 2012
4 장세훈, "Tower crane operation management using the dependency structure matrix (DSM)" 서울대학교 대학원 2009
5 Huang C, "Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming" 20 (20): 571-580, 2011
6 Zhang P, "Olomolaiye PO, Holt GD. Location optimization for a group of tower cranes" 125 (125): 115-122, 1999
7 Al-Hussein M, "Integrating 3D visualization and simulation for tower crane operations on construction sites" 15 (15): 554-562, 2006
8 Lee UK, "Improving tower crane productivity using wireless technology" 21 (21): 594-604, 2006
9 Tam CM, "GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction" 21 (21): 257-266, 2003
10 Sacks R, "Feasibility of Automated Monitoring of Lifting Equipment in Support of Project Control" 131 (131): 604-614, 2005
1 신윤석, "초고층 건축공사를 위한 건설 리프트 양중계획 시스템 개발" 대한건축학회 27 (27): 227-235, 2011
2 김상원, "시공자재의 이동방법을 중심으로 한 양중공정 특성 분류에 관한 연구" 대한건축학회지회연합회 12 (12): 199-206, 2010
3 이정호, "스마트 폰을 활용한 타워크레인 양중 및 자재 관리 프로세스 효율화 방안" 대한건축학회 28 (28): 141-150, 2012
4 장세훈, "Tower crane operation management using the dependency structure matrix (DSM)" 서울대학교 대학원 2009
5 Huang C, "Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming" 20 (20): 571-580, 2011
6 Zhang P, "Olomolaiye PO, Holt GD. Location optimization for a group of tower cranes" 125 (125): 115-122, 1999
7 Al-Hussein M, "Integrating 3D visualization and simulation for tower crane operations on construction sites" 15 (15): 554-562, 2006
8 Lee UK, "Improving tower crane productivity using wireless technology" 21 (21): 594-604, 2006
9 Tam CM, "GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction" 21 (21): 257-266, 2003
10 Sacks R, "Feasibility of Automated Monitoring of Lifting Equipment in Support of Project Control" 131 (131): 604-614, 2005
11 Ahn BJ, "Evaluating the Feasibility of a Lift Plan for Finish Materials in high-Rise Building Construction" 17 (17): 145-156, 2001
12 An H, "Development of Tower-crane Monitoring System Using Genetic Algorithm" 826-828, 2009
13 Marzouk M, "Decision support for tower crane selection with building information models and genetic algorithms" 61 : 1-15, 2016
14 Shapira A, "Cranes for building construction projects" 133 (133): 690-700, 2007
15 Yassine A, "Complex concurrent engineering and the design structure matrix method" 11 (11): 165-176, 2003
16 Sawhney A, "Adaptive probabilistic neural network-based crane type selection system" 128 (128): 265-273, 2002