This article develops model of the nonstationary state behavior of the multiechelon spare parts provisioning systems. This study is concerned with a problem of determining the near optimal requirements level of the spare parts, especially Concurrent S...
This article develops model of the nonstationary state behavior of the multiechelon spare parts provisioning systems. This study is concerned with a problem of determining the near optimal requirements level of the spare parts, especially Concurrent Spare Parts(CSP). CSP is supplied with the procurement of new equipment system, and is used to sustain the equipment without resupply during the initial coverage period. We consider this situation as a multiechelon inventory model with several bases and one depot. And we assume an equipment system which consists of many types of parts would grounded if one of the parts fail. Also this multiechelon CSP problem is considering the nonstationary poisson failure process and nonstationary exponential repair process in a dynamic environment. We develop an efficient computational procedure to find the near optimal number of spare parts minimizing the total expected cost, while achieving the required system availability. Finally we present a simple example of suggested method.