1 주철민, "작업순서와 기계 의존적인 작업준비시간을 고려한 이종병렬기계의 일정계획을 위한 효과적인 작업할당 방법을 이용한 유전알고리즘" 대한산업공학회 25 (25): 357-364, 2012
2 Mosheiov, G., "V-Shaped polices to scheduling deteriorating jobs" 39 : 979-991, 1991
3 Zhao, C., "Two-parallel machines scheduling with rate-modifying activities to minimize total completion time" 198 : 354-357, 2009
4 Wang, J. L., "Singlemachine total completion time scheduling with a time-dependent deterioration" 35 : 1506-1511, 2011
5 Wang, D., "Single-machine scheduling with simple linear deterioration to minimize earliness penalties" 46 : 285-290, 2010
6 Lee, C.Y., "Single-machine scheduling with maintenance and repair ratemodifying activities" 135 : 493-513, 2001
7 김병수, "Single-Machine Total Completion Time Scheduling with Position-Based Deterioration and Multiple Rate-Modifying Activities" 대한산업공학회 10 (10): 247-254, 2011
8 Cheng, T.C.E., "Single machine scheduling with deadlines and increasing rates of processing times" 36 : 673-692, 2000
9 Gupta, J.N.D., "Single facility scheduling with nonlinear processing times" 14 : 387-393, 1988
10 Alidaee, B., "Scheduling with time dependent processing times:review and extensions" 50 (50): 711-721, 1999
1 주철민, "작업순서와 기계 의존적인 작업준비시간을 고려한 이종병렬기계의 일정계획을 위한 효과적인 작업할당 방법을 이용한 유전알고리즘" 대한산업공학회 25 (25): 357-364, 2012
2 Mosheiov, G., "V-Shaped polices to scheduling deteriorating jobs" 39 : 979-991, 1991
3 Zhao, C., "Two-parallel machines scheduling with rate-modifying activities to minimize total completion time" 198 : 354-357, 2009
4 Wang, J. L., "Singlemachine total completion time scheduling with a time-dependent deterioration" 35 : 1506-1511, 2011
5 Wang, D., "Single-machine scheduling with simple linear deterioration to minimize earliness penalties" 46 : 285-290, 2010
6 Lee, C.Y., "Single-machine scheduling with maintenance and repair ratemodifying activities" 135 : 493-513, 2001
7 김병수, "Single-Machine Total Completion Time Scheduling with Position-Based Deterioration and Multiple Rate-Modifying Activities" 대한산업공학회 10 (10): 247-254, 2011
8 Cheng, T.C.E., "Single machine scheduling with deadlines and increasing rates of processing times" 36 : 673-692, 2000
9 Gupta, J.N.D., "Single facility scheduling with nonlinear processing times" 14 : 387-393, 1988
10 Alidaee, B., "Scheduling with time dependent processing times:review and extensions" 50 (50): 711-721, 1999
11 Qi, X., "Scheduling the maintenance on a single machine" 50 : 1071-1078, 1999
12 Lee, C.Y., "Scheduling of jobs and maintenance activities on parallel machines" 47 : 61-67, 2000
13 Wu, C., "Scheduling deteriorating jobs to minimize the makespan on a single machine" 44 : 1230-1236, 2009
14 Browne, S., "Scheduling deteriorating jobs on a single processor" 38 : 495-498, 1999
15 Mosheiov, G., "Scheduling a maintenance activity and due-window assignment on a single machine" 36 (36): 2541-2545, 2009
16 Bachman, A., "Minimizing the total weighted completion time of deteriorating jobs" 81 (81): 81-84, 2002
17 Jeng, A., "Minimizing the total completion time in single-machine scheduling with step-deteriorating jobs" 32 : 521-536, 2005
18 Bahalke, U., "Meta-heuristics to solve single-machine scheduling problem with sequence-dependent setup-time and deteriorating jobs" 50 : 749-759, 2010
19 Lee, C.Y., "Machine scheduling with a rate-modifying activity" 128 : 119-128, 2001
20 Iranpoor, M., "Machine scheduling in the presence of sequence- dependent setup times and a ratemodifying activity" 2012
21 Gen, M., "Genetic Algorithms and Engineering Optimization" Wiley 2000
22 Holland, J.H., "Adaptation in natural and artificial systems" University of Michigan Press 1975
23 Zhao, C., "A note to due-window assignment and single machine scheduling with deteriorating jobs and a ratemodifying activity" 39 (39): 1300-1303, 2012
24 Lodree, E.J., "A note on the optimal sequence position for a rate-modifying activity under simple linear deterioration" 201 (201): 644-648, 2010
25 Husang, H., "A generalization for single-machine scheduling with deteriorating jobs to minimize earliness penalties" 47 : 1225-1230, 2010
26 Cheng, T.C.E., "A concise survey of scheduling with time-dependent processing times" 152 : 1-13, 2004