South Korea’s first commercial nuclear reactor, Kori Unit 1, was permanently shut down in 2017, and preparations are currently underway for its decommissioning. After the permanent shutdown, the spent nuclear fuel from the reactor core is removed an...
South Korea’s first commercial nuclear reactor, Kori Unit 1, was permanently shut down in 2017, and preparations are currently underway for its decommissioning. After the permanent shutdown, the spent nuclear fuel from the reactor core is removed and stored in a spent fuel storage facility. Subsequently, steps are taken for its permanent disposal, and if a permanent disposal site is not determined, it is stored in an interim storage facility (or temporary storage facility). Therefore, the activation criteria for radiation emergency plans vary depending on the movement of spent nuclear fuel and the storage location. In this study, it reviewed emergency plans in the U.S. NRC Regulatory Guide (Draft) titled ‘Emergency Planning for Decommissioning Nuclear Power Reactors’ to determine the requirements for radiation emergency plans needed for decommissioned nuclear power plants. Additionally, by examining emergency plans applied to decommissioning nuclear power plants in the United States, this study identified emergency plan requirement that could be applicable to future decommissioned nuclear power plants in South Korea. This study will contribute to the establishment of appropriate radiation emergency plans for decommissioning nuclear power plants in Korea for providing accurate information on overseas cases and relevant guidelines.