1 Fan Peng, "Track maintenance production team scheduling in railroad networks" Elsevier BV 46 (46): 1474-1488, 2012
2 Emil Gustavsson, "Scheduling tamping operations on railway tracks using mixed integer linear programming" Springer Nature 4 (4): 97-112, 2015
3 Soh, S. S., "Review on scheduling techniques of preventive maintenance activities of railway" IEEE Computer Society 310-315, 2012
4 N. Rhayma, "Reliability analysis of maintenance operations for railway tracks" Elsevier BV 114 : 12-25, 2013
5 Tomas Lidén, "Railway Infrastructure Maintenance - A Survey of Planning Problems and Conducted Research" Elsevier BV 10 : 574-583, 2015
6 M. Wen, "Optimization of preventive condition-based tamping for railway tracks" Elsevier BV 252 (252): 455-465, 2016
7 Stephen M Famurewa, "Optimisation of maintenance track possession time: A tamping case study" SAGE Publications 229 (229): 12-22, 2014
8 Tao Zhang, "Optimal Scheduling of Track Maintenance on a Railway Network" Wiley-Blackwell 29 (29): 285-297, 2013
9 Miwa, M, "Mathematical programming model analysis for the optimal track maintenance schedule" 43 (43): 131-136, 2002
10 Tatsuo Oyama, "Mathematical modeling analyses for obtaining an optimal railway track maintenance schedule" Springer Nature 23 (23): 207-224, 2006
1 Fan Peng, "Track maintenance production team scheduling in railroad networks" Elsevier BV 46 (46): 1474-1488, 2012
2 Emil Gustavsson, "Scheduling tamping operations on railway tracks using mixed integer linear programming" Springer Nature 4 (4): 97-112, 2015
3 Soh, S. S., "Review on scheduling techniques of preventive maintenance activities of railway" IEEE Computer Society 310-315, 2012
4 N. Rhayma, "Reliability analysis of maintenance operations for railway tracks" Elsevier BV 114 : 12-25, 2013
5 Tomas Lidén, "Railway Infrastructure Maintenance - A Survey of Planning Problems and Conducted Research" Elsevier BV 10 : 574-583, 2015
6 M. Wen, "Optimization of preventive condition-based tamping for railway tracks" Elsevier BV 252 (252): 455-465, 2016
7 Stephen M Famurewa, "Optimisation of maintenance track possession time: A tamping case study" SAGE Publications 229 (229): 12-22, 2014
8 Tao Zhang, "Optimal Scheduling of Track Maintenance on a Railway Network" Wiley-Blackwell 29 (29): 285-297, 2013
9 Miwa, M, "Mathematical programming model analysis for the optimal track maintenance schedule" 43 (43): 131-136, 2002
10 Tatsuo Oyama, "Mathematical modeling analyses for obtaining an optimal railway track maintenance schedule" Springer Nature 23 (23): 207-224, 2006
11 Cecília Vale, "Integer Programming to Optimize Tamping in Railway Tracks as Preventive Maintenance" American Society of Civil Engineers (ASCE) 138 (138): 123-131, 2012
12 CPLEX, "IBM ILOG"
13 European Committee for Standardization, "EN 13848-5:2008. Railway applications-Track-Track geometry quality-Part 5: Geometric quality levels"
14 Office for Research and Experiments(ORE), "Dynamic vehicle/ track interaction phenomena, from the point of view of track maintenance, Question D161, RP3"
15 A. Andrade, "Biobjective Optimization Model for Maintenance and Renewal Decisions Related to Rail Track Geometry" Transportation Research Board 2261 : 163-170, 2011
16 Union Internationale des Chemins de Fer(UIC), "Best practice guide for optimum track geometry durability"
17 AMPL, "AMPL Optimization LLC"
18 Oh, S., "A study on a mathematical model of the track maintenance scheduling problem" 85-97, 2006
19 Franziska Heinicke, "A railway maintenance scheduling problem with customer costs" Springer Nature 4 (4): 113-137, 2015