According to the construction of Seoul Thermal #5 (250MW) unit, there will be prospected several new problems on the power system operation. This paper describes the characteristic of system frequency decay during severe emergencies which result in su...
According to the construction of Seoul Thermal #5 (250MW) unit, there will be prospected several new problems on the power system operation. This paper describes the characteristic of system frequency decay during severe emergencies which result in sudden outage of such large generator unit. It also studies the factors involved in applying under frequency relays to maintan an allowable frequency level and to prevent total area collapse by automatic load shedding program.