RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      Outcome-based Contractors Selection using the Integrated Fuzzy AHP and Fuzzy TOPISIS Method

      한글로보기

      https://www.riss.kr/link?id=A101866222

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract)

      Based on the concept of outcome-based maintenance, the outcome-based contractor equipment support is proposed as the logistical support strategy in the military industry. The outcome-based contractor equipment support is focus on the combat efficiency...

      Based on the concept of outcome-based maintenance, the outcome-based contractor equipment support is proposed as the logistical support strategy in the military industry. The outcome-based contractor equipment support is focus on the combat efficiency rather than on the performance of the equipments. Choosing the right contractor is a very important part in the process of its implementation. In fact, the contractor selection is a multi-criteria decision-making problem, which is largely dependent on the uncertainty and ambiguity of the decision-makers. This paper presents a systematic decision-making process of the outcome-based contractor selection, which employs fuzzy AHP to determine the importance weights of each index and adopts fuzzy TOPSIS to obtain the performance ratings of the alternative contractors. Finally, the validity of this method is verified by a specific case.

      더보기

      목차 (Table of Contents)

      • Abstract
      • 1. Introduction
      • 2. Outcome-based Contractor Support
      • 3. Evaluation Criteria System of Outcome-based Contractor Selection
      • 4. Integrated Fuzzy AHP and Fuzzy TOPISIS Method
      • Abstract
      • 1. Introduction
      • 2. Outcome-based Contractor Support
      • 3. Evaluation Criteria System of Outcome-based Contractor Selection
      • 4. Integrated Fuzzy AHP and Fuzzy TOPISIS Method
      • 4.1 Formal Description of the Problem
      • 4.2 Fuzzy AHP
      • 4.3 Fuzzy TOPSIS Methods
      • 5. Numerical Example
      • 6. Conclusions
      • References
      더보기

      동일학술지(권/호) 다른 논문

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼