RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      KCI등재

      효과적인 재원조달을 통한 구도시 u-City 구축사례연구 = A Case Study on the Successful Old-Town u-City Construction by an Effective Financing

      한글로보기

      https://www.riss.kr/link?id=A60243412

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract)

      As a leading nation of ubiquitous technology, South Korea has been promoting u-City pilot projects throughout the country. According to ‘Fundamental Construction Law of u-City,’ u-City projects are classified into old-town and new-town types. However, most projects have focused only on the new-town type. Pushing forward large-scale land development projects, Korea Land and Housing Corporation (LH Co.) under Ministry of Land Transport and Maritime Affairs (MLTM) has gained a development profit out of the u-City infrastructure and then donated the infrastructure to a local government without making any plan for operations. In the process of u-City pilot projects, old-towns have been relatively ignored and various of unexpected problems have emerged. Building the u-City of an old-town is not easy due to many constraints such as huge initial investment, long validity and verification procedures, lack of useful services for citizens, lack of professional outsourcing methods for business promotion, high operating costs of the integrated control center, inadequate law related, insufficient institutional requirements and so on. This paper introduces a case study on u-City development for an old-town, Ansan City, as a private investment project. The case will help boost u-City projects for old-towns by solving their problems and providing an effective operational mechanism. As the first BTL (Build-Transfer-Lease) project for constructing u-City, ‘Broadband Information Network Development Project’ of Ansan City will provide a reference model of expanding u-City projects for other cities.
      번역하기

      As a leading nation of ubiquitous technology, South Korea has been promoting u-City pilot projects throughout the country. According to ‘Fundamental Construction Law of u-City,’ u-City projects are classified into old-town and new-town types. Howe...

      As a leading nation of ubiquitous technology, South Korea has been promoting u-City pilot projects throughout the country. According to ‘Fundamental Construction Law of u-City,’ u-City projects are classified into old-town and new-town types. However, most projects have focused only on the new-town type. Pushing forward large-scale land development projects, Korea Land and Housing Corporation (LH Co.) under Ministry of Land Transport and Maritime Affairs (MLTM) has gained a development profit out of the u-City infrastructure and then donated the infrastructure to a local government without making any plan for operations. In the process of u-City pilot projects, old-towns have been relatively ignored and various of unexpected problems have emerged. Building the u-City of an old-town is not easy due to many constraints such as huge initial investment, long validity and verification procedures, lack of useful services for citizens, lack of professional outsourcing methods for business promotion, high operating costs of the integrated control center, inadequate law related, insufficient institutional requirements and so on. This paper introduces a case study on u-City development for an old-town, Ansan City, as a private investment project. The case will help boost u-City projects for old-towns by solving their problems and providing an effective operational mechanism. As the first BTL (Build-Transfer-Lease) project for constructing u-City, ‘Broadband Information Network Development Project’ of Ansan City will provide a reference model of expanding u-City projects for other cities.

      더보기

      목차 (Table of Contents)

      • 1. 서 론
      • 2. 지자체형 u-City 구축사업 추진현황 및 선행연구
      • 3. BTL 방식에 의한 안산시 u-City 구축사례
      • 4. 결론 및 향후 연구방향
      • 참고문헌
      • 1. 서 론
      • 2. 지자체형 u-City 구축사업 추진현황 및 선행연구
      • 3. BTL 방식에 의한 안산시 u-City 구축사례
      • 4. 결론 및 향후 연구방향
      • 참고문헌
      더보기

      동일학술지(권/호) 다른 논문

      동일학술지 더보기

      더보기

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼