RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      KCI등재 SCOPUS

      A Multi-Objective Project Scheduling Problem Subject to Project Reliability and Multi-Mode Activities with Time Window

      한글로보기

      https://www.riss.kr/link?id=A107864552

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract)

      In this study, the necessity of considering reliability in projects and its association with other related objectives regarding project"s scheduling is investigated. In this regard, a mathematical model to optimize the objective functions, time and re...

      In this study, the necessity of considering reliability in projects and its association with other related objectives regarding project"s scheduling is investigated. In this regard, a mathematical model to optimize the objective functions, time and reliability is presented considering budget constraint, and time window for starting activities, float time and multi-mode activities following the review of the literature. Due to the great difficulty of calculations in this model, two metaheuristic algorithms, namely MOPSO and NSGAII are presented to solve the model"s problem in small, average and large scale and then several numerical samples are solved in all above mentioned scales to evaluate the algorithm performance. The results of solving the model using metaheuristic algorithms are compared in small-scale with the results of accurate problem-solving carried out by GAMS optimization software. The results indicate that both metaheuristic algorithms are able to achieve acceptable responses in short time considering all three forms of reliability function. In addition, MOPSO algorithm had the most desirable performance in achieving acceptable responses in less time and NSGAII algorithm had the most desirable performance in more extensively searching the response space.

      더보기

      목차 (Table of Contents)

      • ABSTRACT
      • 1. INTRODUCTION
      • 2. MATHEMATICAL MODEL
      • 3. PROPOSED SOLUTION METHODS
      • 4. PERFORMANCE EVALUATION FOR PROPOSED ALGORITHMS
      • ABSTRACT
      • 1. INTRODUCTION
      • 2. MATHEMATICAL MODEL
      • 3. PROPOSED SOLUTION METHODS
      • 4. PERFORMANCE EVALUATION FOR PROPOSED ALGORITHMS
      • 5. THE COMPUTATIONAL RESULT
      • 6. DISCCUTION
      • 7. CONCLUTION
      • REFERENCES
      더보기

      참고문헌 (Reference)

      1 Welcome to PSPLIB, "om-db.wi.tum.de/psplib/library"

      2 Graver, J., "You may rely on the reliability polynomial for much more than you might think" 34 (34): 1411-1422, 2005

      3 Trelea, I. C., "The particle swarm optimization algorithm : Convergence analysis and parameter selection" 85 (85): 317-325, 2003

      4 Nourmohamadi Shalke, P., "Sustainable supplier selection and order allocation through quantity discounts" 13 (13): 20-32, 2018

      5 Golmohamadi, S., "Solving a fuzzy fixed charge solid transportation problem using batch transferring by new approaches in meta-heuristic" 58 : 143-150, 2017

      6 Khakzad, N., "Riskbased design of process systems using discrete-time Bayesian networks" 109 : 5-17, 2012

      7 Bistouni, F., "Remove and contraction : A novel method for calculating the reliability of Ethernet ring mesh networks" 167 : 362-375, 2017

      8 Bhunia, A. K., "Reliability stochastic optimization for a series system with interval component reliability via genetic algorithm" 216 (216): 929-939, 2010

      9 Zhao, J. H., "Reliability optimization using multiobjective ant colony system approaches" 92 (92): 109-120, 2007

      10 Tavakkoli-Moghaddam, R., "Reliability optimization of series-parallel systems with a choice of redundancy strategies using a genetic algorithm" 93 (93): 550-556, 2008

      1 Welcome to PSPLIB, "om-db.wi.tum.de/psplib/library"

      2 Graver, J., "You may rely on the reliability polynomial for much more than you might think" 34 (34): 1411-1422, 2005

      3 Trelea, I. C., "The particle swarm optimization algorithm : Convergence analysis and parameter selection" 85 (85): 317-325, 2003

      4 Nourmohamadi Shalke, P., "Sustainable supplier selection and order allocation through quantity discounts" 13 (13): 20-32, 2018

      5 Golmohamadi, S., "Solving a fuzzy fixed charge solid transportation problem using batch transferring by new approaches in meta-heuristic" 58 : 143-150, 2017

      6 Khakzad, N., "Riskbased design of process systems using discrete-time Bayesian networks" 109 : 5-17, 2012

      7 Bistouni, F., "Remove and contraction : A novel method for calculating the reliability of Ethernet ring mesh networks" 167 : 362-375, 2017

      8 Bhunia, A. K., "Reliability stochastic optimization for a series system with interval component reliability via genetic algorithm" 216 (216): 929-939, 2010

      9 Zhao, J. H., "Reliability optimization using multiobjective ant colony system approaches" 92 (92): 109-120, 2007

      10 Tavakkoli-Moghaddam, R., "Reliability optimization of series-parallel systems with a choice of redundancy strategies using a genetic algorithm" 93 (93): 550-556, 2008

      11 Ahmadizar, F., "Reliability optimization of a series system with multiple-choice and budget constraints using an efficient ant colony approach" 38 (38): 3640-3646, 2011

      12 Lee, C. Y., "Reliability optimization design using hybrid NN-GA with fuzzy logic controller" 85 (85): 432-446, 2002

      13 Lee, C. Y., "Reliability optimization design for complex systems by hybrid GA with fuzzy logic control and local search, IEICE TRANSACTIONS on Fundamentals of Electronics" 85 (85): 880-891, 2002

      14 Duan, D., "Reconfiguration of distribution network for loss reduction and reliability improvement based on an enhanced genetic algorithm" 64 : 88-95, 2015

      15 Hedayat, A. S., "Orthogonal Arrays: Theory and Applications" Springer 1999

      16 Bobbio, A., "New challenges in network reliability analysis" 6 : 554-564, 2006

      17 Sadeghi-Moghaddam, S., "New approaches in metaheuristics to solve the fixed charge transportation problem in a fuzzy environment" 31 : 477-497, 2019

      18 Singhal, M., "Network reliability computation by using different binary decision diagrams" 1 (1): 82-91, 2010

      19 Li, X., "Multi-swarm particle swarm optimization for payment scheduling" 284-291, 2017

      20 Tofighian, A. A., "Modeling and solving the project selection and scheduling" 83 : 30-38, 2015

      21 Taguchi, G., "Introduction to Quality Engineering:Designing Quality Into Products and Processes" Asian Productivity Organization 1986

      22 Samadi, A., "Heuristic-based metaheuristics to address a sustainable supply chain network design problem" 35 (35): 102-117, 2018

      23 Schott, J. R., "Fault tolerant design using single and multicriteria genetic algorithm optimization" Massachusetts Institute of Technology 1995

      24 Cochran, W. G., "Experimental Designs" John Wiley & Sons 1957

      25 Tanguy, C., "Exact two-terminal reliability of some directed networks" 1-8, 2007

      26 Bagheri, A., "Evaluating the effects of renewable and non-renewable DGs on DNEP from the reliability, uncertainty, and operational points of view by employing hybrid GA and OPF" 25 (25): 3304-3328, 2015

      27 Zitzler, E., "Comparison of multiobjective evolutionary algorithms : Empirical results" 8 (8): 173-195, 2000

      28 Srinivas, N., "Comparative study of vector evaluated GA and NSGA applied to multiobjective optimization" 83-90, 1995

      29 Kolisch, R. Drexl, A., "Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems:Easy and Hard Instances" Institut für Betriebswirtschaftslehre 1992

      30 Nahas, N., "Ant system for reliability optimization of a series system with multiple-choice and budget constraints" 87 (87): 1-12, 2005

      31 Zhao, F., "An improved MOEA/D for multi-objective job shop scheduling problem" 30 (30): 616-640, 2017

      32 Fathollahi, A. M., "A tri-level location-allocation model for forward/reverse supply chain" 62 : 328-346, 2018

      33 Kang, W. H., "A rapid reliability estimation method for directed acyclic lifeline networks with statistically dependent components" 124 : 81-91, 2014

      34 Kareche, S., "A new robust heuristic for assigning substrate network resources to virtual networks" 47-52, 2014

      35 Ridzuan, M. R. M., "A new meta heuristic evolutionary programming(NMEP)in optimizing economic energy dispatch, Journal of Telecommunication" 8 (8): 35-40, 2016

      36 Yeh, W. C., "A new cutbased algorithm for the multi-state flow network reliability problem" 136 : 1-7, 2015

      37 Shi, Y., "A modified particle swarm optimizer" 69-73, 1998

      38 Zoraghi, N., "A hybrid project scheduling and material ordering problem : Modeling and solution algorithms" 58 : 700-713, 2017

      39 Deb, K., "A fast elitist non-dominated sorting genetic algorithm for multi-objective optimization : NSGA-II" 849-858, 2000

      40 Amir Mohammad Fathollahi Fard, "A Bi-Objective Stochastic Closed-loop Supply Chain Network Design Problem Considering Downside Risk" 대한산업공학회 16 (16): 342-362, 2017

      더보기

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      인용정보 인용지수 설명보기

      학술지 이력

      학술지 이력
      연월일 이력구분 이력상세 등재구분
      2023 평가예정 해외DB학술지평가 신청대상 (해외등재 학술지 평가)
      2020-01-01 평가 등재학술지 유지 (해외등재 학술지 평가) KCI등재
      2015-08-03 학술지명변경 한글명 : Industrial Engineeering & Management Systems -> Industrial Engineering & Management Systems
      외국어명 : Industrial Engineeering & Management Systems An International Journal -> Industrial Engineering & Management Systems An International Journal
      KCI등재
      2013-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2010-01-01 평가 등재학술지 선정 (등재후보2차) KCI등재
      2009-01-01 평가 등재후보 1차 PASS (등재후보1차) KCI등재후보
      2007-01-01 평가 등재후보학술지 선정 (신규평가) KCI등재후보
      더보기

      학술지 인용정보

      학술지 인용정보
      기준연도 WOS-KCI 통합IF(2년) KCIF(2년) KCIF(3년)
      2016 0.13 0.13 0.1
      KCIF(4년) KCIF(5년) 중심성지수(3년) 즉시성지수
      0.1 0.09 0.316 0.05
      더보기

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼