RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      KCI등재 SCOPUS

      LNG : 발전 수익성 개선 방안에 관한 연구 변동비 차익 및 제한적 가격입찰제도를 중심으로 = A Study on the Profitability Improvement of LNG Generation: Focused on Variable Cost Margin and Restrictive Price Bidding Pool

      한글로보기

      https://www.riss.kr/link?id=A107021765

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract)

      In this study, we analyzed the factors affecting the variable cost margin required for the recovery of investment costs for LNG generators and proposed a restrictive price bidding pool(RPBP). For this, we investigated the issues of Korean LNG generato...

      In this study, we analyzed the factors affecting the variable cost margin required for the recovery of investment costs for LNG generators and proposed a restrictive price bidding pool(RPBP). For this, we investigated the issues of Korean LNG generators focusing on the profitability and reviewed some alternatives for overcoming these issues. Next, we calculated the minimum required variable cost margins for 23 Korean LNG generators, and obtained an average of 16.7 KRW/kWh. We also performed multiple regression and found that the investment cost, operation and management cost, and the allocation time for price-setting schedule energy(PSE) have statistically significant effects on the minimum required variable cost margin. Finally, we proposed a RPBP based on the results and analyzed the effect of the RPBP on the electricity market from the perspective of game theory. This study is academically and institutionally meaningful in that it is the first attempt to design the RPBP system using the real-world data of LNG generators.

      더보기

      참고문헌 (Reference)

      1 김주희, "전자파 위험 지형도의 상이한 구성: 지중 송전선로 위험 논쟁을 중심으로" 한국과학기술학회 19 (19): 119-167, 2019

      2 조창현, "전력시장 운영체제에 관한 소고" 한국규제학회 16 (16): 117-144, 2007

      3 김현제, "전력산업 구조개편의 추진현황과 전망" 재단법인 에너지경제연구원 7 (7): 139-160, 2008

      4 김영산, "전력도매시장에서의 안정적 발전용량 보상을 위한 이원적 용량가격 제도 도입 방안" 한국환경경제학회 25 (25): 113-140, 2016

      5 김인호, "전력가격의 합리화에 기초한 전력산업의 국제경쟁력 강화" 법무부 (120) : 12-50, 2015

      6 김대욱, "우리나라 전력시장의 용량요금제도 개선방안에 관한 연구" 재단법인 에너지경제연구원 14 (14): 293-318, 2015

      7 박용기, "우리나라 전력시장에서 수도권 열병합발전기의 송전혼잡완화 편익 산정 연구" 대한전기학회 68 (68): 605-613, 2019

      8 이세림, "온실가스·에너지 목표관리제 및 배출권거래제 대상 기업의 명세서를 이용한 온실가스 감축 실적 분석" 한국기후변화학회 8 (8): 221-230, 2017

      9 김명수, "배출권거래제도 실시가 CBP 시장에 미치는 영향분석 및 대응방안 수립연구" 대한전기학회 64 (64): 667-679, 2015

      10 김명윤, "계통한계가격(SMP)에서 무부하비용 제외가 발전사 비용절감 유인에 미치는 영향" 한국환경경제학회 23 (23): 617-641, 2014

      1 김주희, "전자파 위험 지형도의 상이한 구성: 지중 송전선로 위험 논쟁을 중심으로" 한국과학기술학회 19 (19): 119-167, 2019

      2 조창현, "전력시장 운영체제에 관한 소고" 한국규제학회 16 (16): 117-144, 2007

      3 김현제, "전력산업 구조개편의 추진현황과 전망" 재단법인 에너지경제연구원 7 (7): 139-160, 2008

      4 김영산, "전력도매시장에서의 안정적 발전용량 보상을 위한 이원적 용량가격 제도 도입 방안" 한국환경경제학회 25 (25): 113-140, 2016

      5 김인호, "전력가격의 합리화에 기초한 전력산업의 국제경쟁력 강화" 법무부 (120) : 12-50, 2015

      6 김대욱, "우리나라 전력시장의 용량요금제도 개선방안에 관한 연구" 재단법인 에너지경제연구원 14 (14): 293-318, 2015

      7 박용기, "우리나라 전력시장에서 수도권 열병합발전기의 송전혼잡완화 편익 산정 연구" 대한전기학회 68 (68): 605-613, 2019

      8 이세림, "온실가스·에너지 목표관리제 및 배출권거래제 대상 기업의 명세서를 이용한 온실가스 감축 실적 분석" 한국기후변화학회 8 (8): 221-230, 2017

      9 김명수, "배출권거래제도 실시가 CBP 시장에 미치는 영향분석 및 대응방안 수립연구" 대한전기학회 64 (64): 667-679, 2015

      10 김명윤, "계통한계가격(SMP)에서 무부하비용 제외가 발전사 비용절감 유인에 미치는 영향" 한국환경경제학회 23 (23): 617-641, 2014

      11 조창현, "경쟁적 전력시장에서의 전력거래제도와 전력거래방식 선택에 관한 소고: 거래비용이론, 경매이론 및 가격경쟁이론을 활용한 전력거래의 경제분석" 한국규제학회 11 (11): 91-133, 2002

      12 김영산, "경쟁 도입 후 우리 나라 전력 도매시장에서의 균형 가격에 관한 연구" 한국산업조직학회 11 (11): 93-122, 2003

      13 김대욱, "가격입찰과 수직적 계약: 우리나라 전력시장을 중심으로" 한국경제연구학회 35 (35): 101-124, 2017

      14 C. H. Lee, "The role and expansion plan of distributed power supply in the basic plan for power supply and demand" 491 : 28-34, 2017

      15 S. H. Lee, "The direction of research and adaptation measures in the field of health after the announcement of the comprehensive countermeasures for 9. 26 fine dust management" 346 : 1-8, 2018

      16 Y. S. Park, "The 8th power supply and demand plan ... Reduction of 6 nuclear power plants and 4 coals:Expansion of LNG and pumping power generation as a renewable energy backup facility - Electricity rate hike is minimal - Average level of 1% per year since 2022" 12 (12): 12-15, 2018

      17 MoTIE (Ministry of Trade, Industry and Energy), "The 8th Basic Plan for Long-term Power Supply and Demand (2017~2031)" 2017

      18 S. H. Bae, "Starting from April 1, LNG import levy cut for power generation : Passed the Enforcement Decree of the Oil and Petroleum Alternative Fuel Business Act _ Cut LNG import levy per kg to 3. 8 won" 13 (13): 64-64, 2019

      19 Y. S. Park, "LNG power generation and performance slowdown this year from last year Still : First quarter of this year, power management company's management performance shifted to LNG-Expanded profits of private power companies with a high proportion of LNG" 10 (10): 48-49, 2016

      20 Korea Power Exchange, "Electric Power Statistics Information System (EPSIS)"

      21 S. H. Bae, "Contributing to the activation of the local economy through stable power supply : Minimization of sulfur oxides and dust-Maximize recycling of wastewater-Pledge to construct follow-up units by utilizing power plant infrastructure" 12 (12): 12-17, 2018

      22 MoE (Ministry of Environment), "Comprehensive countermeasures for PM" MoE 2017

      23 I. C. Nam, "Competition Policy for the Electricity Industry of Korea" KDI 2012

      24 G. Shieh, "Clarifying the role of mean centring in multicollinearity of interaction effects" 64 (64): 462-477, 2011

      25 J. Y. Lee, "Be fully committed to the safe management and operation of Oseong Natural Gas Power Plant : CEO's field-oriented management-Powerful management of power plants-Safety-oriented tasks" 14 (14): 68-71, 2020

      26 K. W. Ohn, "Background and status of the introduction of the variable cost market" 23-29, 2019

      27 KECO (Korea Environment Corporation), "Annual Air Quality Alerts"

      28 J. H. Ha, "A study on the management performance of operating status of electric power market and civil LNG power plant" 1-20, 2019

      29 M. H. Ryu, "A study on strategy of K-water based on electronic market circumstance change" K-Water 2013

      30 S. J. Cho, "A study on how to reform taxes to achieve energy conversion in the power generation sector" Korean Energy Research Institute 2019

      31 H. S. Kim, "A Study to Establish the Standard Capacity Price Calculation Standard for New Reference Generators" 118 : 2017

      32 Y. S. Ma, "A Study on Development Plan of Electricity Industry as a Change in Business Type of Electricity Market" Ministry of Knowledge Economy 2012

      33 Ministry of Economy and Finance, "19~’23 Mid-to-long Financial Management Plans for Public Institutions"

      더보기

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      인용정보 인용지수 설명보기

      학술지 이력

      학술지 이력
      연월일 이력구분 이력상세 등재구분
      2023 평가예정 해외DB학술지평가 신청대상 (해외등재 학술지 평가)
      2020-01-01 평가 등재학술지 유지 (해외등재 학술지 평가) KCI등재
      2010-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2007-01-01 평가 학술지 통합 (기타) KCI등재
      2001-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      더보기

      학술지 인용정보

      학술지 인용정보
      기준연도 WOS-KCI 통합IF(2년) KCIF(2년) KCIF(3년)
      2016 0.27 0.27 0.24
      KCIF(4년) KCIF(5년) 중심성지수(3년) 즉시성지수
      0.21 0.19 0.366 0.08
      더보기

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼