RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      KCI등재

      도시고속도로 공사구간의 적정 완화구간 길이 산정 = The Proper Length of Transition Area for Work Zones on Urban Freeways

      한글로보기

      https://www.riss.kr/link?id=A104768226

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract)

      Due to the characteristics of urban freeways such as heavy traffic and high speed, work zone on urban freeways causes the increase of not only the likelihood of crash occurrence but also traffic congestion caused by lane drop, lane change, acceleratio...

      Due to the characteristics of urban freeways such as heavy traffic and high speed, work zone on urban freeways causes the increase of not only the likelihood of crash occurrence but also traffic congestion caused by lane drop, lane change, acceleration/deceleration, and etc. This paper aims to determine the proper length of transition area that satisfies two criteria, mobility and safety, to make the operation of work zone more efficient.
      For the analysis, three different scenarios were developed by the number of lanes and the proper length of transition area were determined by changing the length from 100m to 500m in 100m increments. The results showed that the proper length of transition area for 3- and 4-lane freeways is 300m, whereas the proper length of 2-lane freeways is 200m. The results indicated that the different length of transition area based on the number of lanes is more desirable and efficient.

      더보기

      국문 초록 (Abstract)

      도시고속도로는 교통량이 많고 주행속도가 높아 도로점용 공사 시 교통사고 위험 뿐만 아니라 차로 수 감소, 차로 변경, 가감속 등의 증가로 마찰이 증대되어 교통정체를 야기한다. 본 연구...

      도시고속도로는 교통량이 많고 주행속도가 높아 도로점용 공사 시 교통사고 위험 뿐만 아니라 차로 수 감소, 차로 변경, 가감속 등의 증가로 마찰이 증대되어 교통정체를 야기한다. 본 연구는 공사구간을 효율적으로 운영관리 하기 위해서 이동성과 안전성의 두 가지 측면을 만족하는 공사구간 적정 완화구간 길이 산정을 목적으로 한다. 분석을위해 차로수별 3가지 시나리오를 구성하였고, 각 시나리오별로 완화구간 길이를 100-500m까지 100m 간격으로 변화시키며 적정 완화구간 길이를 결정하였다. 그 결과, 편도 3, 4차로 도로의 1차로 점용 공사 시 300m, 편도 2차로 도로의 1차로 점용 공사 시 200m로 나타났다. 편도 차로 수에 따라 동일한 완화구간 길이로 운영하는 것보다는 차로수에 따라 다르게 운영하는 것이 우수하다는 결과를 도출하였다.

      더보기

      참고문헌 (Reference)

      1 박태훈, "고속도로 공사구간에서 발생하는 교통사고 특성에 관한 연구" 한국ITS학회 7 (7): 127-136, 2008

      2 Krammes R. A., "Updated Capacity Values for Short-term Freeway Work Zone Lane Closures" 1442 : 49-56, 1994

      3 Jo H. S., "Traffic Congestion Nationwide Cost Estimates and Trend Analysis" The Korea Transportation Institute 2008

      4 Eom T. G., "The Traffic Stream Characteristic of Continuous Flow Lane Reduction Section" Dankook University 1994

      5 Lee S. E., "The Research on the Traffic Characteristic and Safety Change Because of the City Expressway Road Occupancy Construction" University of Seoul 2002

      6 Park J. N., "The Method to Estimate the Length of Transition Area at the Construction Area in the Freeway" Ajou University 2007

      7 Ministry of land, Transport and Maritime Affairs, "Road Work Zone Traffic Control Guiding Principle"

      8 Korea Expressway Corporation, "Highway Work Zone Traffic Control Standard"

      9 Korean Society of Transportation, "Highway Capacity Manual, Ministry of Construction and Transportation" Korean Society of Transportation 2001

      10 Transportation Research Board, "Highway Capacity Manual 2010"

      1 박태훈, "고속도로 공사구간에서 발생하는 교통사고 특성에 관한 연구" 한국ITS학회 7 (7): 127-136, 2008

      2 Krammes R. A., "Updated Capacity Values for Short-term Freeway Work Zone Lane Closures" 1442 : 49-56, 1994

      3 Jo H. S., "Traffic Congestion Nationwide Cost Estimates and Trend Analysis" The Korea Transportation Institute 2008

      4 Eom T. G., "The Traffic Stream Characteristic of Continuous Flow Lane Reduction Section" Dankook University 1994

      5 Lee S. E., "The Research on the Traffic Characteristic and Safety Change Because of the City Expressway Road Occupancy Construction" University of Seoul 2002

      6 Park J. N., "The Method to Estimate the Length of Transition Area at the Construction Area in the Freeway" Ajou University 2007

      7 Ministry of land, Transport and Maritime Affairs, "Road Work Zone Traffic Control Guiding Principle"

      8 Korea Expressway Corporation, "Highway Work Zone Traffic Control Standard"

      9 Korean Society of Transportation, "Highway Capacity Manual, Ministry of Construction and Transportation" Korean Society of Transportation 2001

      10 Transportation Research Board, "Highway Capacity Manual 2010"

      더보기

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      인용정보 인용지수 설명보기

      학술지 이력

      학술지 이력
      연월일 이력구분 이력상세 등재구분
      2022 평가예정 계속평가 신청대상 (등재유지)
      2017-01-01 평가 우수등재학술지 선정 (계속평가)
      2013-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2010-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2008-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2006-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2004-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2001-07-01 평가 등재학술지 선정 (등재후보2차) KCI등재
      1999-01-01 평가 등재후보학술지 선정 (신규평가) KCI등재후보
      더보기

      학술지 인용정보

      학술지 인용정보
      기준연도 WOS-KCI 통합IF(2년) KCIF(2년) KCIF(3년)
      2016 0.43 0.43 0.46
      KCIF(4년) KCIF(5년) 중심성지수(3년) 즉시성지수
      0.46 0.43 0.762 0.2
      더보기

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼