1 "Value- based dispatching for semiconductor wafer fabrication" 172-176, 2000
2 "Supplychain production planning" Macmillan Press 199-232, 1999
3 "Supply chain model for the semiconductor industry of global market" 10 : 189-206, 2001
4 "Supply Chain Model for the Semiconductor Industry considering manufacturing characteristics" submitted 2003.
5 "Stepper scheduling in semiconductor wafer fabrication process" 157-162, 2000
6 "Semiconductor manufacturing :A supply chain management perspective" singapore 1997.
7 "Semiconductor capacity planning:stochastic modeling and computational studies" 34 : 131-143, 2002
8 "Scheduling semiconductor wafer fabrication" 1 (1): 115-129, 1988
9 "Pushpull production planning of the reentrant process" 22 : 922-931, 2003
10 "Manufacturing cycle time reduction using balance control in the semiconductor fabrication line" 13 (13): 529-540, 2002
1 "Value- based dispatching for semiconductor wafer fabrication" 172-176, 2000
2 "Supplychain production planning" Macmillan Press 199-232, 1999
3 "Supply chain model for the semiconductor industry of global market" 10 : 189-206, 2001
4 "Supply Chain Model for the Semiconductor Industry considering manufacturing characteristics" submitted 2003.
5 "Stepper scheduling in semiconductor wafer fabrication process" 157-162, 2000
6 "Semiconductor manufacturing :A supply chain management perspective" singapore 1997.
7 "Semiconductor capacity planning:stochastic modeling and computational studies" 34 : 131-143, 2002
8 "Scheduling semiconductor wafer fabrication" 1 (1): 115-129, 1988
9 "Pushpull production planning of the reentrant process" 22 : 922-931, 2003
10 "Manufacturing cycle time reduction using balance control in the semiconductor fabrication line" 13 (13): 529-540, 2002
11 "Global planning at Harris Semiconductor" 1995.
12 "Experimental study on input and bottleneck scheduling for a semiconductor fabrication line" 34 : 179-190, 2002
13 "Criticality of detailed modeling in semiconductor supply chain simulation" 888-896, 1999
14 "Closed- loop job release control for VSLI circuit manufacturing" 1 (1): 36-46, 1988a
15 "CONWIP:a pull alternative to kanban" 28 (28): 879-894, 1990
16 "Bottleneck based modeling of semiconductor supply chains" 340-345, 2000
17 "A scheduling rule for job release in semiconductor fabrication" 7 : 213-217, 1988b
18 "A robust production control policy for VLSI wafer fabrication" 2 (2): 159-164, 1989
19 "A modular production planning system for semiconductor manufacturing" University of California, Berkeley 1992-,
20 "A framework for supply chain management in semiconductor manufacturing industry" 1995.
21 "A comparative study of scheduling policies at Motorola fabs" , San Francisco 51-56, 1999