1 이상운, "생산공정 일정계획 알고리즘" 한국정보기술학회 11 (11): 157-166, 2013
2 E. Mokotoff, "Scheduling to Minimize the Makespan on Identical Parallel Machines : An LP-Based Algorithm" 8 (8): 97-107, 1999
3 J. C. Ho, "Minimizing Total Weighted Flowtime Subject to Minimum Makespan on Two Identical Parallel Machines" 22 (22): 179-190, 2011
4 J. N. D. Gupta, "Minimizing Makespan Subject to Minimum Total Flow-time on Identical Parallel Machines" 125 (125): 370-380, 2000
5 J. N. D. Gupta, "Minimizing Makespan Subject to Minimum Flowtime on Two Identical Parallel Machines" 28 (28): 705-717, 2001
6 J. N. D. Gupta, "Minimizing Flowtime Subject to Optimal Makespan on Two Identical Parallel Machines" 20 (20): 5-17, 2000
7 J. N. D. Gupta, "Makespan Minimization on Identical Parallel Machines Subject to Minimum Total Flow-Time" 21 (21): 220-229, 2004
8 C-H. Lin, "Makespan Minimization Subject to Flowtime Optimality on Identical Parallel" 31 (31): 1655-1666, 2004
9 M. Sevkli, "A Modified Variable Neighborhood Search for Minimizing the Makespan on Identical Parallel Machines" 108-111, 2009
10 L. Min, "A Genetic Algorithm for Minimizing the Makespan in the case of Scheduling Identical Parallel Machines" 13 (13): 399-403, 1999
1 이상운, "생산공정 일정계획 알고리즘" 한국정보기술학회 11 (11): 157-166, 2013
2 E. Mokotoff, "Scheduling to Minimize the Makespan on Identical Parallel Machines : An LP-Based Algorithm" 8 (8): 97-107, 1999
3 J. C. Ho, "Minimizing Total Weighted Flowtime Subject to Minimum Makespan on Two Identical Parallel Machines" 22 (22): 179-190, 2011
4 J. N. D. Gupta, "Minimizing Makespan Subject to Minimum Total Flow-time on Identical Parallel Machines" 125 (125): 370-380, 2000
5 J. N. D. Gupta, "Minimizing Makespan Subject to Minimum Flowtime on Two Identical Parallel Machines" 28 (28): 705-717, 2001
6 J. N. D. Gupta, "Minimizing Flowtime Subject to Optimal Makespan on Two Identical Parallel Machines" 20 (20): 5-17, 2000
7 J. N. D. Gupta, "Makespan Minimization on Identical Parallel Machines Subject to Minimum Total Flow-Time" 21 (21): 220-229, 2004
8 C-H. Lin, "Makespan Minimization Subject to Flowtime Optimality on Identical Parallel" 31 (31): 1655-1666, 2004
9 M. Sevkli, "A Modified Variable Neighborhood Search for Minimizing the Makespan on Identical Parallel Machines" 108-111, 2009
10 L. Min, "A Genetic Algorithm for Minimizing the Makespan in the case of Scheduling Identical Parallel Machines" 13 (13): 399-403, 1999