RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      KCI우수등재 SCOPUS

      CM인력의 업무수행능력 분석 및 향상방안

      한글로보기

      https://www.riss.kr/link?id=A109462509

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract)

      The purpose of this study is to analyze the level of work performance of CMr by project stage to derive work that lacks work performance capability, and to present practical improvement measures necessary for enhancing the capability of CMr and improving the management system for the successful execution of construction projects in the future. The results derived through this study are as follows. 1) The tasks in the design stage, such as implementation design and basic design with a large workload, generally have high work difficulty, high work burden index, and high work importance. 2) The work efficiency index of the implementation design stage and construction stage, where the current work performance level is low compared to the work importance level, and the difference between the current work performance level and the future work demand level also showed a big difference compared to other tasks. 3) The main factors that deteriorate CMr work performance are related to personal ability that affect their work performance ability, so it is urgently necessary to establish improvement measures for personal ability and competency in order to improve the CMr work performance ability. 4) In this study, based on the results of a survey of CM practitioners, improvement measures were proposed for factors such as lack of field experience and knowledge of CMr, lack of responsibility and authority for CM work operation, lack of individual capabilities of CMr, and lack of clear management standards and manuals. This study analyzed the level of work performance of CMr by construction project performance stage and suggested improvement measures to improve work performance.
      번역하기

      The purpose of this study is to analyze the level of work performance of CMr by project stage to derive work that lacks work performance capability, and to present practical improvement measures necessary for enhancing the capability of CMr and improv...

      The purpose of this study is to analyze the level of work performance of CMr by project stage to derive work that lacks work performance capability, and to present practical improvement measures necessary for enhancing the capability of CMr and improving the management system for the successful execution of construction projects in the future. The results derived through this study are as follows. 1) The tasks in the design stage, such as implementation design and basic design with a large workload, generally have high work difficulty, high work burden index, and high work importance. 2) The work efficiency index of the implementation design stage and construction stage, where the current work performance level is low compared to the work importance level, and the difference between the current work performance level and the future work demand level also showed a big difference compared to other tasks. 3) The main factors that deteriorate CMr work performance are related to personal ability that affect their work performance ability, so it is urgently necessary to establish improvement measures for personal ability and competency in order to improve the CMr work performance ability. 4) In this study, based on the results of a survey of CM practitioners, improvement measures were proposed for factors such as lack of field experience and knowledge of CMr, lack of responsibility and authority for CM work operation, lack of individual capabilities of CMr, and lack of clear management standards and manuals. This study analyzed the level of work performance of CMr by construction project performance stage and suggested improvement measures to improve work performance.

      더보기

      동일학술지(권/호) 다른 논문

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼