1 박창규, "평면적 저장 위치 할당 문제에 대한 유전자 알고리즘" 대한산업공학회 35 (35): 129-140, 2009
2 Eksioglu, B., "tabu search algorithm for the flowshop scheduling problem with changing neighborhoods" 54 : 1-11, 2008
3 Gao, M., "hybrid of genetic algorithm and bottleneck shifting for multiobjective flexible job shop scheduling problems" 53 : 149-162, 2007
4 Bazzazi, M, "genetic algorithm to solve the storage space allocation problem in a container terminal" 53 (53): 44-52, 2009
5 Aladag, C., "The effect of neighborhood structure on tabu search algorithm in solving course timetabling problem" 36 : 12349-12356, 2009
6 Glover, F, "Tabu search-Part I" 1 : 190-206, 1989
7 Zhang, C., "Storage space allocation in container terminals" 37 : 883-903, 2003
8 Kozan, E, "Mathematical modeling of container transfers and storage locations at seaport terminals" 28 : 519-537, 2006
9 Park, C, "Mathematical modeling and solving procedure of the planar storage location assignment problem" 57 : 1062-1071, 2009
10 Koh, S., "Development of a Block Assembly Scheduling System for Shipbuilding Company" 12 (12): 586-594, 1999
1 박창규, "평면적 저장 위치 할당 문제에 대한 유전자 알고리즘" 대한산업공학회 35 (35): 129-140, 2009
2 Eksioglu, B., "tabu search algorithm for the flowshop scheduling problem with changing neighborhoods" 54 : 1-11, 2008
3 Gao, M., "hybrid of genetic algorithm and bottleneck shifting for multiobjective flexible job shop scheduling problems" 53 : 149-162, 2007
4 Bazzazi, M, "genetic algorithm to solve the storage space allocation problem in a container terminal" 53 (53): 44-52, 2009
5 Aladag, C., "The effect of neighborhood structure on tabu search algorithm in solving course timetabling problem" 36 : 12349-12356, 2009
6 Glover, F, "Tabu search-Part I" 1 : 190-206, 1989
7 Zhang, C., "Storage space allocation in container terminals" 37 : 883-903, 2003
8 Kozan, E, "Mathematical modeling of container transfers and storage locations at seaport terminals" 28 : 519-537, 2006
9 Park, C, "Mathematical modeling and solving procedure of the planar storage location assignment problem" 57 : 1062-1071, 2009
10 Koh, S., "Development of a Block Assembly Scheduling System for Shipbuilding Company" 12 (12): 586-594, 1999
11 이재규, "Developing scheduling systems for Daewoo Shipbuilding: DAS project" 97 (97): 380-395, 199703
12 Park, C, "Comparing heuristic algorithm of the planar storage location assignment problem" 46 : 171-185, 2010
13 이재규, "A spatial scheduling system and its application to shipbuilding: DAS-CURVE" PERGAMON-ELSEVIER SCIENCE LTD 10 (10): 311-324, 1996
14 Kim, K, "A heuristic rule for relocating blocks" 33 : 940-954, 2006
15 Xu, J., "A dynamic neighborhood based tabu search algorithm for real-world flight instructor scheduling problems" 169 : 978-993, 2006