RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      KCI등재

      Stochastic Single Machine Scheduling Subject to MachinesBreakdowns with Quadratic Early-Tardy Penalties for thePreemptive-Repeat Model

      한글로보기

      https://www.riss.kr/link?id=A103872938

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      참고문헌 (Reference)

      1 J. Mittenthal, "Stochastic single machine scheduling with quadratic earlytardypenalties 1993.Stochastic single machine scheduling subject to machines breakdowns 199" 786-796,

      2 X. Cai, "Stochastic scheduling with preemptive-repeat machine breakdownsto minimize the expected weighted flow time" 17 : 467-485, 2003

      3 X. Cai, "Stochastic scheduling subject to machine breakdowns Thepreemptive-repeat model with discounted reward and other criteria" 51 : 800-817, 2004

      4 X. Cai, "Stochastic scheduling on parallel machines subject to random breakdownsto minimize expected costs for earliness and tardy jobs" 47 (47): 422-437, 1999

      5 J.R. Birge, "Single-machine schedulingsubject to stochastic breakdown" 661-677, 1990.

      6 K.R.Baker, "Sequencing with earliness and tardiness penalties" 22-36, 1990.

      7 K. D. Glazebrook, "Scheduling stochastic jobs on a single machine subject to breakdowns" 251-264, 1984.

      8 A.Allahverdi, "Scheduling on a two-machine flowshop subject to random breakdownswith makespan objective function" 81 : 376-387, 1995

      9 A. Allahverdi, "Scheduling on M parallel machine subject to randombreakdowns to minimize expected mean flow time" 677-682, 1994.

      10 X.Cai, "Scheduling jobs with random processing times on a single machine subjectto stochastic breakdowns to minimize early-tardy penalties" 43 : 1127-1146, 1996

      1 J. Mittenthal, "Stochastic single machine scheduling with quadratic earlytardypenalties 1993.Stochastic single machine scheduling subject to machines breakdowns 199" 786-796,

      2 X. Cai, "Stochastic scheduling with preemptive-repeat machine breakdownsto minimize the expected weighted flow time" 17 : 467-485, 2003

      3 X. Cai, "Stochastic scheduling subject to machine breakdowns Thepreemptive-repeat model with discounted reward and other criteria" 51 : 800-817, 2004

      4 X. Cai, "Stochastic scheduling on parallel machines subject to random breakdownsto minimize expected costs for earliness and tardy jobs" 47 (47): 422-437, 1999

      5 J.R. Birge, "Single-machine schedulingsubject to stochastic breakdown" 661-677, 1990.

      6 K.R.Baker, "Sequencing with earliness and tardiness penalties" 22-36, 1990.

      7 K. D. Glazebrook, "Scheduling stochastic jobs on a single machine subject to breakdowns" 251-264, 1984.

      8 A.Allahverdi, "Scheduling on a two-machine flowshop subject to random breakdownswith makespan objective function" 81 : 376-387, 1995

      9 A. Allahverdi, "Scheduling on M parallel machine subject to randombreakdowns to minimize expected mean flow time" 677-682, 1994.

      10 X.Cai, "Scheduling jobs with random processing times on a single machine subjectto stochastic breakdowns to minimize early-tardy penalties" 43 : 1127-1146, 1996

      11 "Minimizing waiting variance in the single machine problem" 567-575, 1977.

      12 U.Bagchi, "Minimizing mean squared deviation of completiontimes about a common due date" 894-906, 1987.

      13 X. Zhuo, "General stochastic single-machine scheduling with regular cost function" 26 : 95-108, 1997

      더보기

      동일학술지(권/호) 다른 논문

      동일학술지 더보기

      더보기

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      인용정보 인용지수 설명보기

      학술지 이력

      학술지 이력
      연월일 이력구분 이력상세 등재구분
      2026 평가예정 재인증평가 신청대상 (재인증)
      2020-01-01 평가 등재학술지 유지 (재인증) KCI등재
      2019-11-08 학회명변경 영문명 : The Korean Society For Computational & Applied Mathematics And Korean Sigcam -> Korean Society for Computational and Applied Mathematics KCI등재
      2017-01-01 평가 등재학술지 유지 (계속평가) KCI등재
      2013-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2010-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2008-02-18 학술지명변경 한글명 : Journal of Applied Mathematics and Infomatics(Former: Korean J. of Comput. and Appl. Math.) -> Journal of Applied Mathematics and Informatics
      외국어명 : Journal of Applied Mathematics and Infomatics(Former: Korean J. of Comput. and Appl. Math.) -> Journal of Applied Mathematics and Informatics
      KCI등재
      2008-02-15 학술지명변경 한글명 : Journal of Applied Mathematics and Computing(Former: Korean J. of Comput. and Appl. Math.) -> Journal of Applied Mathematics and Infomatics(Former: Korean J. of Comput. and Appl. Math.)
      외국어명 : Journal of Applied Mathematics and Computing(Former: Korean J. of Comput. and Appl. Math.) -> Journal of Applied Mathematics and Infomatics(Former: Korean J. of Comput. and Appl. Math.)
      KCI등재
      2008-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2006-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2004-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2001-01-01 평가 등재학술지 선정 (등재후보2차) KCI등재
      1998-07-01 평가 등재후보학술지 선정 (신규평가) KCI등재후보
      더보기

      학술지 인용정보

      학술지 인용정보
      기준연도 WOS-KCI 통합IF(2년) KCIF(2년) KCIF(3년)
      2016 0.16 0.16 0.13
      KCIF(4년) KCIF(5년) 중심성지수(3년) 즉시성지수
      0.1 0.07 0.312 0.02
      더보기

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼