RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      도로산업 예비타당성조사제도 개선방안 연구

      한글로보기

      https://www.riss.kr/link?id=A104383845

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract)

      The purpose of this study is to suggest ways to improve the preliminary feasibility study system for road projects. It is also another purpose of this study to verify the extent to which the improvement of the feasibility study system will affect the feasibility study results through empirical case studies.
      We proposed three alternatives to improve the problems of current preliminary feasibility study system. First one is measuring and utilizing the benefits using the benefit measurement methodologies such as the contingent value methods for the benefit items that are difficult to express in the monetary term. Second one is shifting the role of preliminary feasibility study results as an investment priority criteria. Third one is constructing various feasibility study methodologies for each business type.
      Finally, this study confirms the extent to which the survey results are changed when the preliminary feasibility study methodology is revised for specific road projects.
      번역하기

      The purpose of this study is to suggest ways to improve the preliminary feasibility study system for road projects. It is also another purpose of this study to verify the extent to which the improvement of the feasibility study system will affect the ...

      The purpose of this study is to suggest ways to improve the preliminary feasibility study system for road projects. It is also another purpose of this study to verify the extent to which the improvement of the feasibility study system will affect the feasibility study results through empirical case studies.
      We proposed three alternatives to improve the problems of current preliminary feasibility study system. First one is measuring and utilizing the benefits using the benefit measurement methodologies such as the contingent value methods for the benefit items that are difficult to express in the monetary term. Second one is shifting the role of preliminary feasibility study results as an investment priority criteria. Third one is constructing various feasibility study methodologies for each business type.
      Finally, this study confirms the extent to which the survey results are changed when the preliminary feasibility study methodology is revised for specific road projects.

      더보기

      목차 (Table of Contents)

      • [표지]
      • [연구요약]
      • [차례]
      • 표차례
      • 그림차례
      • [표지]
      • [연구요약]
      • [차례]
      • 표차례
      • 그림차례
      • [제 1 장 서론]
      • 제1절 연구의 배경 및 목적
      • 제2절 연구의 방법 및 흐름
      • [제 2 장 예비타당성조사제도 검토]
      • 제1절 제도의 개요
      • 제2절 분야별 제도 비교⋅분석
      • 제3절 SOC부문 타당성제도 개선 관련 선행연구 고찰
      • [제 3 장 제도개선 효과분석]
      • 제1절 효과분석 대상사업 선정
      • 제2절 시뮬레이션 결과 분석
      • 제3절 소결
      • [제 4장 도로사업 예비타당성 조사제도 개선방안]
      • 제1절 계량불가능한 편익항목의 반영
      • 제2절 투자우선순위 선정기준으로서의 역할 변경
      • 제3절 타당성 평가방식의 다양화
      • [제 5 장 정책제언]
      • 제1절 시사점
      • 제2절 정책제언
      • [참고문헌]
      • [Abstract]
      더보기

      동일학술지(권/호) 다른 논문

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼