1 Bobrowski, P. M., "The impact of sequence dependent setup time on job shop scheduling performance" 32 : 1503-1520, 1994
2 Flynn, B. B., "The effects of setup time on output capacity in cellular manufacturing" 25 : 1761-1772, 1987
3 Dorigo, M., "The Ant System:Optimization by a Colony of Cooperating Agents" 26 : 29-41, 1996
4 Dorigo, M., "The Ant Colony Optimization Meta-heuristic, New Ideas in Optimization" McGraw-Hill 1999
5 Pinedo, M., "Scheduling theory, algorithms, and systems" Prentice-Hall 1995
6 Behnamian, J., "Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm" 36 : 9637-9644, 2009
7 Nessah, F., "New heuristics for identical parallel machine scheduling with Sequence-dependent setup times and dates" 32-41, 2005
8 Hahn, C. K., "Impact of the setup variable on capacity and inventory decisions" 13 : 91-103, 1989
9 Garey, M., "Computers and intractabilit y:A guide to the theory of NP-completeness" W. H. Freeman 1997
10 Mendes, A. S., "Comparing metaheuristic approaches for parallel machine scheduling problems" 13 : 143-154, 2002
1 Bobrowski, P. M., "The impact of sequence dependent setup time on job shop scheduling performance" 32 : 1503-1520, 1994
2 Flynn, B. B., "The effects of setup time on output capacity in cellular manufacturing" 25 : 1761-1772, 1987
3 Dorigo, M., "The Ant System:Optimization by a Colony of Cooperating Agents" 26 : 29-41, 1996
4 Dorigo, M., "The Ant Colony Optimization Meta-heuristic, New Ideas in Optimization" McGraw-Hill 1999
5 Pinedo, M., "Scheduling theory, algorithms, and systems" Prentice-Hall 1995
6 Behnamian, J., "Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm" 36 : 9637-9644, 2009
7 Nessah, F., "New heuristics for identical parallel machine scheduling with Sequence-dependent setup times and dates" 32-41, 2005
8 Hahn, C. K., "Impact of the setup variable on capacity and inventory decisions" 13 : 91-103, 1989
9 Garey, M., "Computers and intractabilit y:A guide to the theory of NP-completeness" W. H. Freeman 1997
10 Mendes, A. S., "Comparing metaheuristic approaches for parallel machine scheduling problems" 13 : 143-154, 2002
11 Frederickson, G., "Approximation algorithm for some routing problems" 7 : 178-193, 1978
12 Shyu, S. J., "Application of ant colony optimization for no-wait flowshop scheduling problem to minimize the total completion time" 47 : 181-193, 2004
13 Dorigo, M., "Ant colony optimization theory:A survey" 344 : 243-278, 2005
14 Solimanpur, M., "Ant colony optimization algorithm to the inner-cell layout problem in cellular manufacturing" 157 : 592-606, 2004
15 Dorigo, M., "Ant Colony System: A cooperative learning approach to the traveling salesman problem" 1 : 53-66, 1997
16 Dorigo, M., "Ant Colony Optimization:Artificial Ants as a Computational Intelligence Technique" University Libre De Bruxelles 2006
17 Bell, J. E., "An colony optimization technique for the vehicle routing problem" 18 : 41-48, 2004
18 Ying, K., "An ant colony system for permutation flow-shop sequencing" 31 : 791-801, 2004
19 Cheng, C., "A modified ant colony system for solving the traveling salesman problem with time window" 46 : 1225-1235, 2007
20 Tahar, D. N., "A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times" 99 : 63-73, 2006
21 Gharehgozli, A. H., "A fuzzy-mixed-integer goal programming mode for a parallel-machine scheduling problem with sequence- dependent setup times and relaeas dates" 25 : 853-859, 2009