1 Kasemset, C, "TOC based job-shop scheduling" Asian Institute of Technology 2009
2 Lin, F. R, "Scheduling printed circuit board production systems using the two-level scheduling approach" 16 (16): 129-149, 1997
3 Ueno, G, "Robust adaptive particle swarm optimization" 3915-3920, 2005
4 Kennedy, J, "Particle swarm optimization" 1942-1948, 1995
5 Arumugam, M. S, "On the improved performances of the particle swarm optimization algorithms with adaptive parameters, cross-over operators and root mean square (RMS)variants for computing optimal control of a class of hybrid systems" 8 (8): 324-336, 2008
6 Semnani, S. H, "New approach to multi-level processor scheduling" 19 (19): 335-346, 2010
7 Ai, T. J, "Dispersion and velocity indices for observing dynamic behavior of particle swarm optimization" 3264-3271, 2007
8 Voratas Kachitvichyanukul, "Comparison of Three Evolutionary Algorithms: GA, PSO, and DE" 대한산업공학회 11 (11): 215-223, 2012
9 Logendran, R, "Combined heuristics for bi-level group scheduling problems" 38 (38): 133-145, 1995
10 Kasemset, C, "Bi-level multi-objective mathematical model for job-shop scheduling: the application of Theory of Constraints" 48 (48): 6137-6154, 2010
1 Kasemset, C, "TOC based job-shop scheduling" Asian Institute of Technology 2009
2 Lin, F. R, "Scheduling printed circuit board production systems using the two-level scheduling approach" 16 (16): 129-149, 1997
3 Ueno, G, "Robust adaptive particle swarm optimization" 3915-3920, 2005
4 Kennedy, J, "Particle swarm optimization" 1942-1948, 1995
5 Arumugam, M. S, "On the improved performances of the particle swarm optimization algorithms with adaptive parameters, cross-over operators and root mean square (RMS)variants for computing optimal control of a class of hybrid systems" 8 (8): 324-336, 2008
6 Semnani, S. H, "New approach to multi-level processor scheduling" 19 (19): 335-346, 2010
7 Ai, T. J, "Dispersion and velocity indices for observing dynamic behavior of particle swarm optimization" 3264-3271, 2007
8 Voratas Kachitvichyanukul, "Comparison of Three Evolutionary Algorithms: GA, PSO, and DE" 대한산업공학회 11 (11): 215-223, 2012
9 Logendran, R, "Combined heuristics for bi-level group scheduling problems" 38 (38): 133-145, 1995
10 Kasemset, C, "Bi-level multi-objective mathematical model for job-shop scheduling: the application of Theory of Constraints" 48 (48): 6137-6154, 2010
11 Kasemset, C, "AsiaSim 2007" Springer 47-55, 2007
12 Kuo, R. J, "Application of particle swarm optimization algorithm for solving bilevel linear programming problem" 58 (58): 678-685, 2009
13 Zhang, G, "An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem" 56 (56): 1309-1318, 2009
14 Xia, W, "An effective hybrid optimization approach for multi-objective flexible jobshop scheduling problems" 48 (48): 409-425, 2005
15 Warisa Wisittipanich, "An Efficient PSO Algorithm for Finding Pareto-Frontier in Multi-Objective Job Shop Scheduling Problems" 대한산업공학회 12 (12): 151-160, 2013
16 Ai, T. J, "Adaptive particle swarm optimization algorithms" 460-469, 2008
17 Gao, Y, "Adaptive particle swarm optimization algorithm with genetic mutation operation" 211-215, 2007
18 Pratchayaborirak, T, "A two-stage PSO algorithm for job shop scheduling problem" 6 (6): 83-92, 2011
19 Pongchairerks, P, "A two-level particle swarm optimisation algorithm on job-shop scheduling problems" 4 (4): 390-411, 2009
20 Cheng, R, "A tutorial survey of job-shop scheduling problems using genetic algorithms : I. Representation" 30 (30): 983-997, 1996
21 Ai, T. J, "A study on adaptive particle swarm optimization for solving vehicle routing problems" 2008
22 Lian, Z, "A similar particle swarm optimization algorithm for job-shop scheduling to minimize makespan" 183 (183): 1008-1017, 2006
23 Chander, A, "A new social and momentum component adaptive PSO algorithm for image segmentation" 38 (38): 4998-5004, 2011
24 Rahimi-Vahed, A. R, "A multi-objective particle swarm for a flow shop scheduling problem" 13 (13): 79-102, 2007
25 Shi, Y, "A modified particle swarm optimizer" 69-73, 1998
26 Sha, D. Y, "A hybrid particle swarm optimization for job shop scheduling problem" 51 (51): 791-808, 2006
27 Kuo, R. J, "A hybrid of genetic algorithm and particle swarm optimization for solving bi-level linear programming problem: a case study on supply chain model" 35 (35): 6905-3917, 2011
28 Pezzella, F, "A genetic algorithm for the flexible job-shop scheduling problem" 35 (35): 3202-3212, 2008
29 Kimms A, "A genetic algorithm for multi-level, multi-machine lot sizing and scheduling" 26 (26): 829-848, 1999
30 Pan, Q. K, "A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problem" 35 (35): 2807-2839, 2008
31 Lei, D, "A Pareto archive particle swarm optimization for multi-objective job shop scheduling" 54 (54): 960-971, 2008
32 Kasemset, C, "A PSObased procedure for a bi-level multi-objective TOCbased job-shop scheduling problem" 14 (14): 50-69, 2012