- Abstract
- 1. 서론
- 2. 가용송전용량의 결정
- 3. 연속조류계산법(CPF)을 이용한 전체송전용량 계산
- 4. QFA를 이용한 전체송전용량 계산
http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
https://www.riss.kr/link?id=A76532099
2004
Korean
560
KCI등재
학술저널
296-301(6쪽)
0
0
상세조회0
다운로드목차 (Table of Contents)
참고문헌 (Reference)
1 North American Electric Reliability Council(NERC), "Transmission Capability Margin and Their Use in ATC Determination" 1999
2 P. W. Sauer, "Technical Challenges of Computing Available Transfer Capability (ATC) in Electric Power Systems" 1997.1
3 Sauer, "Reactive Power Consi- derations in ATC Computation Proceedings of 32nd Annual Hawaii International Conference on" (v/dec) : 2047-32 2054, 19991979
4 North American Electric Reliability Council(NERC), "Available Transfer Capability-Definitions and Deter- minations" June1996
1 North American Electric Reliability Council(NERC), "Transmission Capability Margin and Their Use in ATC Determination" 1999
2 P. W. Sauer, "Technical Challenges of Computing Available Transfer Capability (ATC) in Electric Power Systems" 1997.1
3 Sauer, "Reactive Power Consi- derations in ATC Computation Proceedings of 32nd Annual Hawaii International Conference on" (v/dec) : 2047-32 2054, 19991979
4 North American Electric Reliability Council(NERC), "Available Transfer Capability-Definitions and Deter- minations" June1996
DECADES 프로그램을 활용한 신재생에너지 의무할당제 효과 분석
전력시장에서 발전가능용량의 전략적 입찰에 대한 게임이론적 해석
系統計劃 樹立用 供給支障費의 推定方法 및 이의 應用에 관한 硏究
부하불평형 및 부하모형을 고려한 복합배전계통의 분산형전원의 연계 방안