RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      KCI등재

      KASS 시스템 통합 및 검증 활동 = Integration, Verification, Qualification Activities for KASS System

      한글로보기

      https://www.riss.kr/link?id=A108913634

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      국문 초록 (Abstract)

      KASS(korea augmentation satellite system) 시스템 통합 및 검증(IVQ; integration, verification, qualification) 활동은 시스템 및 하위시스템 요구사항 검증 활동으로 IART(inspection, analysis, review of design, test) 기반으...

      KASS(korea augmentation satellite system) 시스템 통합 및 검증(IVQ; integration, verification, qualification) 활동은 시스템 및 하위시스템 요구사항 검증 활동으로 IART(inspection, analysis, review of design, test) 기반으로 상세설계(CDR; critical design review) 이후 하위시스템 공장수락시험(FAT; factory acceptance test)부터 현장수락시험(SAT; site acceptance test) 그리고 시스템 통합 검증 시험(TRR; test readiness review) 까지 수행하였다. FAT 단계의 활동은 개발된 장비를 테스트 플랫폼에 설치하고 각 장비별 인터페이스 검증과 통합운영국(KCS; kass control station)과의 연동시험을 통해 성능을 검증하였다. SAT 단계의 활동은 FAT 단계에서 검증된 KRS(kass reference station), KPS(kass processing station), KUS(kass uplink station), KCS를 운영 현장에 설치하고 검증하는 단계이며 개발 일정 및 여건을 고려하여 3단계로 구분하여 수행하였다. TRR 단계의 활동은 항공위성1호기에서 방송되는 SBAS(satellite based augmentation system) 메시지를 이용하여 SAT을 통해 검증된 장비를 FAT 단계에 수행했던 시험 항목과 추가 시험 항목 검증을 통해 전체 시스템에 대한 성능 검증을 완료하였다.

      더보기

      다국어 초록 (Multilingual Abstract)

      KASS(korea augmentation satellite system) system IVQ(integration, verification, qualification) activity is verification of requirements for KASS system and its sub-system that were performed based on the IART(inspection, analysis, review of design, te...

      KASS(korea augmentation satellite system) system IVQ(integration, verification, qualification) activity is verification of requirements for KASS system and its sub-system that were performed based on the IART(inspection, analysis, review of design, test) method from FAT(factory acceptance test) to TRR(test readiness review) after CDR(critical design review) was closed. In the FAT phase, developed equipment was installed on the test platform and we were verified interfaces between sub-systems and coupling test with the KCS(kass control station). In the SAT(site aceeptance test) phase, on-site verification was conducted by installing equipment verified by FAT such as KRS(kass reference station), KPS(kass processing station), KUS(kass uplink station), KCS. However, considering the developed plan and status, SAT was divided into 3 phases and coupling test was performed. In the TRR phase, the KASS system verification was performed through FAT’s test list and additional test list using the SBAS(satellite based augmentation system) broadcast signal from GEO(geostationary earth orbit)1.

      더보기

      동일학술지(권/호) 다른 논문

      동일학술지 더보기

      더보기

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼