http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
Low Cost Solutions for Well Interventions Through Advanced Slickline Services
Larimore, D. R.; Goiffon, J. J.; Bayh, R. I. SPE 1996 p.9-24
Best Practice for the Distribution and Metering of Two-Phase Steam
Hong, K. C.; Griston, S. SPE 1996 p.25-36
Hrachovy, M. J.; McConnell, M.; Damm, M.; Wiebe, C. SPE 1996 p.37-46
Recent Applications of Coiled Tubing in Remedial Wellwork at Prudhoe Bay
Loveland, K. R.; Bond, A. J. SPE 1996 p.47-56
First Horizontal Water Injectors in Prudhoe Bay Field, Alaska
Bodnar, D. A.; Clifford, P. J.; Isby, J. S.; Lane, A. C. SPE 1996 p.57-70
Lessons Learned on Coiled Tubing Completions
Stephens, R. K.; Loveland, K. R.; Whitlow, R. R.; Melvan, J. J. SPE 1996 p.71-82
The Resurgence of ECP's at Prudhoe Bay/North Slope
Gai, H.; Walz, G.; Nakamura, D.; Burnham, M. SPE 1996 p.83-94
Wood, W. D.; Dennis, E. L.; Dean, G. D. SPE 1996 p.95-100
Dale, B. A.; Narahara, G. M.; Stevens, R. M. SPE 1996 p.101-114
California Dreaming-Development Potential Assessment of a Major Offshore Field
Beckner, B. L.; Fast, R. E.; Hornafius, J. S.; Myers, G. A. SPE 1996 p.115-126